Va . January 15, 2003
?a: Brenda Sutton
Scdycet; Delinquent Documents
Attached are minutes and a copy of a Council -approved document that has not been
returned for filing.
Our copy will be placed in the permanent record. If you receive an executed original at a
later date, please ford it to us for filing.
Thanks for your help.
AMENDMENT TO CONSULTING SERVICES AGREEMENT
This Amendment is made and entered into this 19th day of November, 2002 by and between
the City of Redlands, a municipal corporation (hereinafter "City") and Ultra -Safe Security
Specialists, a California corporation (hereinafter "Consultant").
WHERE -AS, under the terms of the Agreement to Furnish Professional Consultino, Services
between the City and Consultant dated Mky 7, 2002, the Consultant agreed to install, on behalf of
the City, a security system at the Redlands Municipal Airport (the "Agreement"); and
WHEREAS, it is the desire of the City and Consultant to amend the Agreement by upgrading
the access control system and the surveillance system at the Redlands Municipal Airport for the total
cost not to exceed $28,891.75;
NOW, THEREFORE, it is mutually agreed to by and between the parties that the May 7,
2002 Agreement shall be amended as follows:
1. Subparagraph 2.1 of the Agreement is hereby amended to include the additional
services described in Exhibit "A."
2. Subparagraph 5.1 ofthe Agreement is hereby amended to increase the compensation
for the services to be performed by Consultant to an amount not to exceed One Hundred Thirty -
Three Thousand Four Hundred Nine Dollars and Seventy -Five Cents (S 13 )3,409.75).
3. Except as amended herein, all terms and conditions of the Agreement shall remain in full
force and effect.
IN, WITNESS WHEREOF, duly authorized representatives of the City and Consultant have
signed in confirmation of this Agreement.
City of Redlands
Karl N. Haws, Mayor
Ci Clerk-, edlands
5 102 Ultra-Safe,%pd
Ultra -Safety Security Specialists
=140911
We will install two (2) new video cards to increase the video input channels to a
total capacity for 20 •
a Investment for this equipment will be $1,600.00.
We will increase the memory • each computer to 256 Mb and • two (2)
each 120 Gb hard drives to provide more dynamic recording/monitoring ol
video. Also we will install an additional (One [1) of the two [21 mentioned in the
above paragraph) video card.
a There will be NO CHARGE for this equipment.
We will • the following camera equipment. All cameras will be •lo daytime
and black & white during periods of darkness.
We will relocate the camera and wireless transmitter from the MAI
Building that presently views East Sessums Drive and Wabash Street. The
camera and wireless transmitter will be installed on the North side of the
Aero Dynamics Hangar. The camera will view activities to the South.
We will relocate the camera and wireless transmitter from the pole
adjacent to the Coyote Gate that presently views West Sessums Drive. The
camera and wireless transmitter will be installed on the North side of the
Coyote Hangar. The camera will view activities to the North of' the
building.
Investment for relocating this equipment will be $700.00. (No_te:th1$
investment Is Lased u on the_ 2ssympfion thgl the f_ransniffter will
a
g1ferate, satisfacgtoA oXer thg now diLsfance. N R Is not ggp—able nLe
wilIf LnjLorm the Cy,,,r of Redlands of ffte IngMa_se In ggst for the
egy1gment p1i:or to Lnsfa fin L_g sgme,2
We will install a hard -wired camera at the East side of the Red Aero
Quonset Building.
0 investment for installing this equipment will be $2,000-00.
We Will install a hard -wired camera at the East side of the Lobby Building
viewing activities to the East.
0 Investment for Installing this equipment will be $2,000.00.
We Will install a camera with wireless transmitter and receiver at the North
side of the Hangar that is East of the Center Gate viewing activities to the
South.
* Investment for Installing this equipment will be $3,750.00.
We will install a camera with wireless transmitter and receiver on post at
the Center Gate viewing activities to the North to the Aircraft Shelter.
* Investment for Installing this equipment will be $3,500.00.
We will install a camera with wireless transmitter and receiver at t
Hangar Owner Association Hangar viewing activities to the South.
* Investment for Installing this equipment will be $3,750.00. 1
We will install a camera with Wireless transmitter and receiver at the
Hangar that will provide the best view of the West Gas Pump.
* Investment for Installing this equipment will be $3,500.00.
+ Upgrade of the Ultra -Safe Access Control System by Brivo Access Control Systems, Inc.
We will install an Access Control Panel at the Aero Dynamics that will
receive special Wireless signals from owner -identified transmitters that will
open the Aero Dynamics Gate Only,
* Investment for installing this equipment will be $3,600.00.
We will provide sixty (60) transmitters that will only open the Aero
Dynamics Gate.
• investment for this equipment will be $25.00 each.
• TOTAL Investment for a purchase of sixty (60) transmitters will be
$1,500.00.
• If there Is a change to the total to be purchased please enter the
corrected amounts in the following spaces and inal each spaced
along with the approval Inals: Transmitters and total
Is
Mai
* The Lotol !nvejjMVnt for all of the components listed above for the upgrade of the
Comprehensive Security System at the Redlands municipal Airport is $25 ,700M
for each of the following Systems:
Dynamic Digital Surveillance System
Access Control System
Your Inve for this service will be $50.00 per month or $6LQ.()O onnuaW, billed in advance.
Note.-A-gayment o-f-16-00.00-w011-result in th 11,
e-C#V_C�ntjnVt-cr tqr ive this tht ah
-sendce- o-ugh a� sendce-ht ugh
cyrrent • Year in coniunction with thgt cgIgnt contract,
Additionally, there will be an increase of the Service fee for the Wireless Wide Area Network
Access Control System based upon a five (5) year commitment as in the present contract
Your investment for these Services will be and addition of $50.00 per month or SM-00 annually
billed in advance.
Note:aya ent of $600.00 will ensure -the -City receives thgse LervLce� throgg_h the-curreaffiscal
Yem
* Total Investment for Extended Warranty Services and WWAN Services is �1,200.00.