HomeMy WebLinkAbout7536_CCv0001.pdf RESOLUTION NO. 7536
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
ESTABLISHING A FEE AND SERVICE CHARGE REVENUE/COST COMPARISON
SYSTEM AND THE AMOUNTS OF FEES LEVIED IN CONNECTION WITH THE
CITY'S PROVISION OF REGULATIONS, PRODUCTS AND SERVICES, AND
RESCINDING RESOLUTION NO. 7501
BE IT RESOLVED by the City Council of the City of Redlands as follows:
Section 1. Intent. Pursuant to article XIIIB of the California Constitution, it is the intent
of the City Council of the City of Redlands to require the ascertauunent of recovery of costs
reasonably borne from fees levied therefor in providing the regulations, products or services
hereinafter enumerated in the exhibits to this Resolution. The fee and service charge revenue/cost
comparison system established within this Resolution provides a mechanism to ensure that,
pursuant to this Resolution, the fees adopted by the City for services rendered do not exceed the
reasonable estimated costs for providing the regulations, products or services for which the fees
are charged. Accordingly, the City Council, by adoption of this Resolution, adopts the fees
described in the attached Exhibit "A".
Section 2. CPI Adjustment. The fees referenced within this Resolution shall be
increased arnivally by the City's Finance Director, on each July 1, by an amount reasonably
equal to the percent change in the Consumer Price Index — All Urban Users (Los Angeles —
Anaheim — Riverside) over the prior year. In snaking such adjustments, the Finance Director
may round the amount of the increased fee to the nearest dollar for purposes of facilitating
efficient payment and collection. Further, the City Manager, or his or her designee, shall
undertake periodic reviews of the fees established by this Resolution and provide a written report
to the City Council recommending whether such fees should be adjusted to reflect increased
costs or efficiencies in the City's provision of regulations,products and services.
Section 3. Authority for Administrative Orders. The City Manager is hereby delegated
the authority to issue administrative orders establishing fee collection and financial procedures
for implementation of this Resolution. All such administrative orders shall be signed by any
affected Department Directors and the Finance Director.
Section 4. Costs Reasonably Borne. The phrase "costs reasonably borne," as used in this
Resolution, consists of:
A. All applicable direct costs including, but not limited to, salaries, wages, fringe
benefits, services and supplies, operation expenses, contracted services, special
supplies and any other direct expense incurred.
B. All applicable indirect costs including, but not limited to, building maintenance and
operations, equipment maintenance, communication, printing and reproduction, and
like expenses when distributed on a rational proration system.
-1-
L\cclerklResolutionslRes 7500-759917536 Fee Resolution 9 15 15.doc
C. Fixed asset recovery expenses, consisting of depreciation of fixed assets and
additional fixed asset expense recovery charges calculated on the current estimated
cost of replacement, divided by the approximate life expectancy of the fixed asset.
A further additional charge to make up the depreciation not previously recovered
and reserved in cash also shall be calculated and considered a cost so as to recover
such unrecovered depreciation over the remaining life of the asset.
D. General overhead, expressed as a percentage, distributing and charging the
expenses of the City Council, City Manager, Finance Department, City Clerk, City
Treasurer, City Attorney, Human Resources Department and all other staff and
support service provided to the entire City organization.
E. Departmental overhead, expressed as a percentage, distributing and charging the
cost of each department director and his or her supporting expenses as enumerated
in the above subsections of this section.
F. Debt service costs, consisting of repayment of principal, payment of interest, and
trustee fees and administrative expenses for all applicable bonds, certificates of
participation, securities issues or loans. Any required coverage factors of added
reserves beyond basic debt service costs shall also be considered a cost if required
by covenant within any securities, ordinance, resolution, indenture or general law
applicable to the City.
Section 5. Public Hearing. Pursuant to California Government Code sections 66016 and
66018, or other applicable statutory requirements, the City Clerk has caused public notice to be
provided as set out in Governinent Code sections 66016, 66018 and 6062a, and the City Council
has received at a regularly scheduled meeting oral and written testimony from staff and members
of the public concerning the new and increased fees proposed to be established by this
Resolution. The notice, oral and written presentations and public meeting were provided prior to
the City Council taking any action on the new and increased fees established by this Resolution.
Section 6. Public Data. At least ten (10) days prior to the required public hearing
described herein, the City Clerk made available to the public data indicating the cost or estimated
cost required to support the fees for which the charges are proposed to be made. The data
demonstrates that the new and increased fees established by this Resolution are not taxes; that
the amount of the fees are necessary to cover the reasonable costs of the City for the Services for
which they are unposed; and the manner in which the costs are allocated to a payor bear a fair
and reasonable relationship to the payor's burden on, or benefit received from, the City's
governmental activities.
Section 7. Public Notice. Notice of the time and place of the public hearing, including a
general explanation of the matter to be considered, has been hailed by the City Clerk at least
fourteen (1 4) days prior to the public hearing to all interested parties who have filed written
requests with the City for mailed notice of meetings relating to new or increased fees.
-2-
I:1cclerklResolutions\Res 7500-759917536 Fee Resolution 9 15 15.doc
Section 8. Actual Costs/Deposits. The actual cost for a regulation, product, service or
project is determined by the affected City Department Directors. Initial deposits are determined
by the amount of time historically spent by City staff on similar projects. Whenever seventy five
percent (75%) of a deposit has been expended and the department detennines that the estimated
actual cost of the project or service will exceed the amount deposited, an additional deposit of
such estimated excess amounts shall be required. Wlien an additional deposit has been requested,
work will be suspended on the project or service when eighty percent (80%) of the deposit
previously received has been expended.
Section 9. Proposition 26 Determination. The City Council hereby funds and determines
that the fees referenced within this Resolution are not taxes as defined in Article XIII C Section
1(e) of the Califoriia Constitution because the fees are either:
A. Imposed for a specific benefit conferred or privilege granted directly to the payors,
that is not provided to those not charged, and which do not exceed the reasonable
costs in the City of conferring the benefit or granting the privilege;
B. Imposed for a specific government service or product provided directly to the payor
that is not provided to those not charged, and which do not exceed the reasonable
costs to the City of providing the service or product;
C. Imposed for the reasonable regulatory costs to the City for issuing licenses and
permits, performing investigations, inspections, or audits, and the administrative
enforcement and adjudication thereof,
D. Imposed for entrance to, or use of, City property; or the purchase, rental or lease of
City property;or
E. Charges imposed as a condition of property development.
Section 10. Prior Resolutions Rescinded. Resolution No. 7501 of the City Council of the
City of Redlands relating to fees is hereby rescinded on the effective date of this Resolution.
Section 11. CEQA Exemption. The City Council hereby finds and determines that the
adoption of this Resolution is exempt from review and under the California Environmental
Quality Act ("CEQA") pursuant to Public Resources Code Section 21080(b)(8)(1) and CEQA
Guidelines Section 15273 because this Resolution relates to fees and charges for the purpose of
meeting the operating expenses of the City.
Section 12. Severability. Should any part or portion of this Resolution be rendered or
declared invalid by a court of competent jurisdiction, including any of the fees identified in the
Exhibit to this Resolution, such invalidation of such part or portion of this Resolution, or of any
fee, shall not invalidate the remaining portions hereof, of the remaining fees, and they shall
remain in full force and effect.
_3_
I:\cclerk\Resolutions\Res 7500-7599\7536 Fee Resolution 9 15 15.doc
Section 13. Effective Date. This Resolution and the fees established by this Resolution
shall become effective on September 15, 2015 except for new or modified fees which apply to
the "filing, accepting, reviewing, approving, or issuance of an application, permit or entitlement
to use" for a development project, as defined in Government Code section 66000, which shall
become effective sixty (60) days after September 15, 2015. However, notwithstanding the
foregoing, any development project for which a complete entitlement application was filed with
the City on or before January 31, 2013, and which had not received approval of that entitlement
by such date, the fees applicable to such development project entitlement shall be those set forth
in Exhibit `B." All other applications, including any subsequent entitlements/permits submitted
for development projects are subject to the fees as described in Exhibit "A." For purposes of this
Resolution, the words "development project" shall mean an application deemed complete by the
City for a tentative subdivision or parcel snap, conditional use perinit, variance or "Commission
Review and Approval."
ADOPTED, SIGNED AND APPROVED this 15th day of September, 2015.
Paul W. Foster, Mayor
ATTEST:
Sam Irwin, ity Clerk
-4-
IAcclerMesolutionslRes 7500-7599\7536 Fee Resolution 9 15 15.doc
I, Sam Irwin, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution
was duly adopted by the City Council at a regular meeting thereof, held on the 15th day of
September, 2015, by the following vote:
AYES: Councilmembers Harrison, Gilbreath, Barich, James; Mayor Foster
NOES: None
ABSTAIN: None
ABSENT: None
Sam Irwin, City Clerk
-5-
lAcclerk\Resolutions\Res 7500-7599\7536 Fee Resolution 9 15 15.doc
Resolution No.7536 Color Legend:
Exhibit A-Fees T,3i -No Change
-Reduction
Fee Year 3 Fee Year 3
(effective as of 1/112016) (effective as of
at 04/2112015 11112015)at 09115/2015
PLANNING DIVISION Resolution No.75iD1 includes.5111 CPI adjustment
Service Name R"ry Fee Year 3 at 0412112015 Fee Year 3(09115116)
1 Cancept plan.._...-----------------............... 0044t463, 9,510
2 Concept plan amendment 100% 3,B52 3,871
3 Specific plain 1001A 8945 8,889
-4-specific plan _100% 4 026 ------- 4,046
5 CUP-new construction 100% 6,104 6,135
.............
6 CUP-no new construction 2,031 2,041
7 CUP-time extension 100% 335 337
8 Revised CUP-construction 1007 2,867 2,.881--,
9 Revised CUP-no construction 1001% 1,446 1,463
10 CUP-daycare home(13+clients) 1007 2,205 2 216
11 Variance-fence committee 100% 575 578
12 Variance-SFR 100% 2,523 2,536
13 Vanance-comm,multi family 1o0 2,618 2,832
14 Variance-parking modilfcation 1007[ 2,072 2,082
15 Building moving-main structure 1,679' 1,687
16 Building moving-garagetsecondary structure 100%, 1,590 1,598
17 CRA-majorjnl acre 100%i 6,879 6,913
18 CRA-minor 1 acre or less 100%1 5,256 5,262
19 ORA-time extension 101 276 277
20 Mine
- __E 1
_commission review lomi 1,802 1 All
21 CRA revised major 100 5,502 5,530
22 CRA-revised minor t00%::
4,744 4,768
23 Parcel map 100W 4,586 4,611
24 Revised parcel ma r 100%;! 3,619 3,637
25 Reversion to_2creagelmerger t00%: 2,55B 2,571
26 Tentative tract map 1 oo%s 11,361 11,418
27 Revised tentative tract map 100%! 7,580 7,618
28 Subdivision time extension 100%, 359 361
29 Lot line adjustment 1007, 642645
..........
30 Certificate of compliance
100% 682 585
31 Negative declaration
100% 5,184 5,210
32 Environmental project assessment 100% 734 738-
33 Residential Development Allocation 100% 3,507 3,525
34 Residential Development Allocation(RDA)-alteration of approved_y!ld Rrqjec[ fl036 554 557
35 Residential transfer ofdevelopment_allocation 1001A 541 ------ 544
36 Home occupation permit-review .-. 1130% 46 6,
. .................
37 Temporary Events 100% 159 160
3B Zone Change-commission determination100 2,132 2,143
39 Zone Change-ordinance text amendment t00%- 2.685 2,698
40 Zone Change 100% 3,454 3,471
41 One sign
1007 619 622
4_2_S1qflTHQ_9n_M fo041 14fl2 1,409
43 Flag est 10* 1345 1,362
44 Sign review by staff WOW
126 127
45 Sign:pragram amendment itio%li 754 758
46 Arinu�jj��_ 22 123
47 Additional ban r
bq -t00%! 62 '62
48 Searchlights 122 123
49 CUP-signs�120SF 100%! 2,4262,438
-------------
50 Demolition>50 Er old-Histone C7es mated SFR 100W 871 875
51 Demolition-�Otr,qkiHistone io a n,indstri 100;6. 875
52 Demolition>50yr.old Hrstoriepe i�9�Ialed_A_ccessory Building .. ........... 610
53 Demolition>50 yr,old-Single Family Zones 100%� 587 590
54 Demolition>50 yr.old-muhi-ramity,Comnjrcial&Industrial t00%! 621 624
55 Demolition>50 yr.old-Accessory Building 513 516
56 Annexation 6,430 6,462
57 SerAre_Rlan for annexation 100% 1,248 1,254
58 Pre annexation agreement 100% 2,332 2,344
_59_?Agriculture rjpreserve removal 1007 2,296 2,307
60 General plan amendment 100% 5,519 5,547
61 Street vacation 100% 2,367 2,379
2 App eat-Various Fees Paid 1001% 2,050 --2,060
63 -"Addendum to planning commission TZ 1,081 1,056
64 Continued item by applicant 336 338
65 Verification letter-basic 10071 349 351
66 Verification letter-research 100%ii 620
67 TenlRorwyoccurpancy_ 1B _,._.-183mm
7536 Exhibit A-B-Amended Fees 9 15,15
PLANNING DIVISION Continued
Service Name R...ccivery Fee Year 3 at 412112015 Fee Year 3(09115115)
68 News rack impound fee 100°0, 342 344
69 Deyelopmentagrsement 100%, 5,555 6,583
70 Williamson Act contract removal 1001A' 2,546 2,559
71 Socio Economic Stud 100% 2,969 2 984
72 Preliminary Review-over one acre' 100 k° 390, 392
73 Preliminary Review-one acre ear fess 100`0. 302 304
74 Minor Certificate of Appropriateness 100'A, 323 325
75 Certificate of Appropriateness 100°5 559 562
76 Demolition Permit<50 yr.old-Single Farn Zones 100W 351 353
77 Demolition Permit c 50 yr-old-Minty-Family Com Ta cral&Indusinai 100 6 356 368
-- _ ._.. ._.,._.. ._... -- ----
78 Demolition Perrnit<50 yr,old-Accessory Burpdrng a„r 100/a. 390 392
79 Mills Act 1 oo f 437 439
MUNICIPAL UTILITIES AND ENGINEERING'DEPARTMENT
Service Name %Recovery Fee Year 3 at 412112015 Fee Year'3(09/15815)
50 Env�ronmental.Impact Review.. 100%� 356 _- 358
81 Environmental impact Report Review 00°6 1,689 1,697
82 Tentative Tract Map 100% 1,335 1,342
83 Revised Tract Map 190% 1,335< 1,342
84 Final Tract Map 100 .2,334 2,346
85 Tentative Parcel Map 1009m 1,335 1,342
86 Revised Parcel Map 10036 1,717 1,726
87 Final Parcel Map 100% 2,099 2,109
68 Easement/Dedication Review 100% 673 678
89 Conditional Use Permit 100% 969 974
90 Commission Review and Approval 100% 969 974
91 Building Moving Permit 100% 218 213
92 Lot Lune Adjustment 100% 627 631
93 Certificate of Compliance 100% 278: 279
94 Street Vacation 100°h 1,023 1,028
95 Subordination AgreemenWen Release 100% 651 654
56 Building Permit_Residential 100%!' 671 ------674
97 Building Permit Residential in a mapped development under a common builder
98 Building Permit•Commercial/industrial 10096', 969 974
99 Building Permit-Room Addition _._-....._. _ _ ..._:_ 100ro', 125 126
100 Building Pe nit-Cammero a4 T1 -- -- 100%1 _ 125 126_
101 Plan Check-Grading Base Fee/0-500 c:y; 100% 460 462
102 Pan Cheek-Grading,each addtl 500 cy or fraction thereof,501-5,400 c; 100 h 64 114
103 Plan Check-Grading,each addtl 5,000 cy ar fraction thereof,5,001-50,000 cy mm 100%, 74
9, y y 83 8
'.104 Plan Check-Gradin each audit 14;004 c or frac#ion#hereof 54 001-106,044 0. , 100 J i
105 Plan Check-Grading,each admi 14,000 cy or frac#won thereo# 100 001 200,400 cy.m to04sl 10 9`Gk
106 Plan Check-Grading,s2p0,041 c.y_each_add 40,000 by or fraction thereof 1009b, 6
_ _. ..
107 Plan Check-Erasion Control-SFR 10®°6 528 531
108 Plan Check-Erosion Control Prdjeel_.Base Fee 100%` 1,002 -1007
109 Plan Check-SWPPP-SFR 100%1 978 983
X110 Plan Check-SWPPP-Project Base Fee -. . 100:1.. 1,293 1.299:.
311 Plan Check-SWPPP-Subdivision Lot.Fee 1001A 135 !lot 136 Ilof
112 Plan Check-SWPPP-Subdivision Acre Fee 140% 135 laces 136 tacre
113 WQMP BMP Inspection-Complex Projects 100% 695 698
114 WQMP BMP Inspection-Standard Projects _-- 1fl4"/ 537 540
_,.
115 VVQMP BMP Inspection-Basic Project too,/. 380 382
116 Plan Check-Preliminary WQMP-SFR .T_ 100% 675 678 m
117 Plan Check Preliminary WQMP-Project Base Fee' 10036 753 757
118 Plan Check-PreliminaryWQMP-Subdsyssirrh Fee 1709. 186 /Irn 187 lint
119 Plan Check-Preliminary jQMP ScbdevrsyanAcreFee 10ob6. 186 lace 187 Isere
120 Plan Chock-FinaI 1N01MP-SFR- 100%h 978 9,83,
121 Plan Check-Final WQMP-Pmjoct Base dee 10096; 1,293 1,299
122 Plan Check-Final WOMP-Subdivision Lot Fee 100o-,&': 135 flat 136 l ct
123 Plan Check-Final WQMP-Subdivision Acre Fee - too, ; 135 /acre 136 /acre
124 Plan Check-Parcel Map-Base l=ee 10fl96 3,251 3,267
125 Plan Check-Parcel Map-_Lot Foo_._. ......__ t00%1 156 /lot 157 flat
1'26 Plan Check-Marcel Map-AcTe Its 100°k', 29 /acre '29 /acre
127 Plan Check-Tract MapHPse Fee t00%:! 3,722 3,741
128 PlanCheck Tract Map-,Lot Fee 100% 93 list 93 !lot
129 Plan Check-Tract Map=Acre Fee 100% 29 /acre 2 /acre
130 Plan Check Street Construction Base fee 100% 1,300 1,307
131 Plan Check-Street Construction-per sheet 100,61 519 /street 522 /sheet
132 Plan Check-Storm Brains•Base fee 0;6; 750 754-
_ 10_
133 Plan Check-Storm Drains-persheat 100%F- 304 /sheet 302 !sheet
134 Plan Check-Hydrology Study 400% 1,343 1,350
135 PfanCheck-Street Lights Base fee 100% 604 607
136 Plan Check-Street Lights-per sheet 100% 342 /sheet _- 344 (sheet
137 Pian Check-Sewer Construction-Base fes 10096 750 754
138 Plan Check.Sewer Construction per sheet 140 4 300 /sheet 302 /sheet
2 7636 ExhibitA-B-Amended Fees 9 15.15
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued
Service Name %Recovery Fee Year:3 at 4/2112015 Fee Year:3(0115115)
13� Plan Check-Water CoflStRICtion-Base fee 100%j 750 754
...................
140 Plan Check-Water 100%j 300 !sheet 302 /sheet
141 Plan Check-Traffic_Sipals-New Installations 100%j 1,536 12544-
142 Plan Check-Traffic 1,053
143 Plan Check-Street Trees.-Base fe 1001 500 503
144 Plan Check-Street Trees-per sheet .......... 100% 250 /sheet 251 /sheet
145 Plan Check-Signs and Striping-Base fac 1001% 750 754
145 Plan Check-Signs and Striping—per per sheet. 1001A 300 Isheel 302 /sheet
147 Encroachment Permit-D6vewayApProach-has 100% 79 '19
148 Encroachment Permit-Dnveway Approach-_each ................ 100% 39 learn 39.teach
149 Encroachment Permit-Sidewalk-base 100% 79 7o
150 Encroachment Permit-Sidewalk-per sq.foot up to 300 SF 0,40 fsq ft, JOAO'/sq.ft.
151 Encroachment Permit-Sidewalk-each ard'lonal Sq r foot over 300 SF 0.10 Isq.ft ft,
152 Encro e 100% 79 /each
153 Encroachment Permit-Cross GuttenSpandrel-per sq,foot 100% 0.79 lsq ft lsq,I'L
154 Encroachment Permit-Curb and Gutter-base 100% 79
155 Encroachment Permit-Curb and Gutter-per linear foot up to 50 LF 3.00 /tin,ft, 3114 tlin.ft
156 Encroachment Permit-Curb and Gutter-each adtlitional LF up to 200 LF 1,50 Ififl.ft. 1,56 Mo.ft.
157 Encroachment Permit-Curb and Gutter-each additional LF over 200 LF 0.75 Am.it 07S,4in.ft.
158 Encroachment Permit Curb/Berm -base t00%— 79
159 Encroachment Permit-Curb I Berm at Imear 2,00 Am.ft, 2,00 Ain.ft.
not up to 50 LF
160 Encroachment Permit-Curb/Berm each additional LF up to 200 LF 1 00 Aln.it. "Ain.ft.
161 Encroachment Permit-Curb I Berm each additional LF over 200 LF 0 50 Ain.ftCS()'Ain ft.
162 Enrro base too%, 79
163 Encroachment Permit-Crushed Aggregate Base Pee sq. 0,08 /sq.q- '008!/sq,ft,
164 Encroachment Permit-Asphalt Pavement-base 100%i 79
165 Encroachment Permit-Asphalt Pavement persq.Foot100%�, 0.08 /sq.ft, /sq,ft
166 Encroachment Permit-Street Light-base t00%! 79
167 Encroachment Permit-Street Light -each icio%� 39 /each
168 Encroachment Permit-Traffic Signal-New-base IDOW 79
169 Encroachment Permft-Traffic Signal-New-each 100* 2,335 /each 2,347 leach
170 Encroachment Permit-Traffic Signal-Modification-base 100°F 79
171 Encroachment Permit-Traffic,Signal-Modification -each 1,830 leach 1,839 leach
172 Encroachment Permit-Reinforced Concrete base 79
173 Error cubic yd, 100%l 118 Ictibicyd. 119 /cubic
174 Encroachment Permit-Storm Drain Pipe-base 1001 79
175 Encroachment linear foot u tolOOLF
4.74 /fin.ft. 416 ifin.fto .
176 Encroachment Permit-Storm Drain Pipe-each additional LF- 0.75 Ain.ft. '0,,75 Air.ft,
177 Encroachment Permit-Curb I nlet/Outlet Structures-base 100%! 79
178 Encroachment Permit-Curb Tnlet/Outlet Structures-eac 100%� 39 /each 39-/each
179 Encroachment Permit-Storm Drain Manhole/Junction Box-base 79
7w. 0'
180 Encroachment Permit-Storm Drain Manhole/Junction Box-earn leach SO,/each
181 Encroachment Permit-Curb Care-base 1000%1 79 70,
182 Encroachment Permit-Curb Gore-each 39 leach 1001/0 /each
183 Encroachment Permit-Sewer Main-base 100% 79 79
184 Encroachment Permit-Sewer Main-PerlinearfootuptaSOLF 1,56 Ainfl
148 Ain,ft.
185 Encroachment Permit-Sewer Main-each additional LF O 25 Ain:ft, flin,'ft.
186 Encroachment Permit-Sewer Manhole base 100% 79 78
187 Encroachment Permit-Sewer Manhole each 100% 39 /each /each
188 Encroachment Permit-Sewer Cleanout-base 1005% 79 79
189 Encroachment Permit-Sewer Clearrout-each 100%1 39 leach /each
190 Encroachment Permit-Sewer Lateral-;base 00ea 79
191 Encroachment Permit-Sewer Lateral-each 10011 39 leach 44,4each
192 Encroachment Permit-Water Main-Potable-base 100%, 79 79
193 Encroachment Permit-Water Main-Potable-per imearfoot upm 50 LF^m 1Z8 Ain,ft, Ain.ft.
194 Encroachment I LF over 50 LF0.26 Ain.ft. . rt -777 OAft,
in.7777 �15
195 Encroachment Permit-Water Main-Non-Potable-base too%: 79 79
1",56 Ain.fl.
196 mm- E ncroach me nt P ermit-Water M at n-N on-Po(a bl a per Ii nee r foot up to 13�Lf 1 58 Ain.ft,
197 Encroachment Permit-Water Main-Non-Potable-each additional LF over 50 LF 0,25 Ain,ft, ft,
198 Encroachment Pernht-Water Service Lateral-base 1004% 79 79'
3V leach
199 Encroachment Permit-Water Service Lateral-each t00%: 39 /earn
111----1-1—------------
200 Encroachment Permit-Fire Hydrant Assembly-base too%: 79
201 Encroachment Permit-Fire Hydrant Assembly-each I On. 39 leach 39'�leach
202 Encroachment Permit-Water Shutdown-base 100%� 79 79
203 Encroachment Permit-Water Shutdown-each 100% 39 /Loch c 9 leach
204 Enc yLe erroLit-Fire Service-base- 100% 79 19
205 Encroachment Permit-Fire Service-each 10000
39 leach 14 /each
206 Encroachment Permit-Excavation,Trench,Street Cut-base 100% 79
207 Encroachment Permit-Excavation,Trench,Street Cut-per�nearfqcfup_to5OLF 1 58 ffin, Ain ft,
208 Encroachment Permit-Excavation,Trench,Street Cut-each additional LF over 50 LF 0,25 llin,ft t72 llin.ft.
209 Encroachment Permit-Street Patch-base 1001/0 79 7t
210 Encroachment Permit-Streot-Patcih-per sg,,,!". p to 200 SF 0.15 lsq,it "0:16 lsgmft
211 Encroachment Permit-Street Patch-each additional SF—over-200 BE 0,12"/sq-ft 012 /sq,it
:212Encroachment Permit-PracessT Fee 1001 308 310
3 7536 ExhibitA-B-Amended Fees 91515
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued
Service Name. Rauery- Fee Year:3 at 4121'.12.915 Fee Year (09115115)
213 Encroachment Permit-SIA/PIA Projects 1%of bond amount 11%of band ammint
_ — -- —
214 GradFitg Permit,Base Feel 0-500 o.y. 10406 520, 532
215 Grayling Permit,each arkitt 2,000 cy or fraction thereof,501-10, CIII c.y 100 B4 04
216 Grading Permit,each addtt5,000 cy or fraction thereof,16,001 109000[3 cy. 160°til 77 77
217 Granting Permit each addtl 10,000 by or fraction thereof,100,001-200,000 c.y} 100% 10 107
218 Grading Permit,>200,D01 c y.each addtl 10,000 c:y orfractkon thereof __- 100'yo 7 7
_........ . — nw.
219 Permit-Truck.Route(upfci_.5days). 100% 08
220 Permik Wide Load 100oe 68 68
221 Permit-Outdoor[lining-New 1030% 277 _ 778
222 Permit Outdoor Dining Annual Renewal 100% 150 151
223 Permit Outdoor Display-New 100% 277 278
224 PermitOutdoorDisplay-Annual Renewal 109% 1550 151
225 Pennil-Parklet 160 2717 271
..._ ....._ ....... _.
226 _NPS Program Foe Industr al-High' I D0%1 155 157
227 NPDES Program Fee,Industrial-Medium 1001% 78
228 NPDES Program Pee,Industrial Law 100% 32 32,
229 NPDES Program Fee,Commercial High 100°/ 056 057
...
230 NPD Program Fee,Commercial Medium 100%; 78 ?5
231 NPDES Program Fee,Commercial Low 100* ... _'__32 _.�. 32
232 SWPPP preliminary check 100 tfl, 2,258 2,269
233 SWPPP final check erosion control plain 100%: 2 25B . ------_ __. ^^ 2,269
-- --..,
234 VVQMP preliminary check 100%! 2,258 __.-. . .. - 2,263
235 WOMP final check erosion plan 100%1 2,258 2,269
239 NPDES Inspection.Construction-High—Non-rainy seasonpriority once low 482 464:
237 NP]ES lnspeotion,Construction-High- Rales season.priority monthly 100%!! 482; 484
P .y I?_tY -._.__.
238 NPDES Ins action,Construction-Medium-Nan-_rainy saason, non onee 100%: 245 241
239 NPDES Inspection,Construction Medium- Rainy season priority antllly 100W 240 241
240 NPDES Inspection,Construction-Loan-Nan-rainy,season priority oncemmmMmF 100%' 240 241
X241 NPDES Inspection,Construction Low- Rainy season,prkority monthly 100%[ 240 - 241
242 NPDES Inspection,Construction-Out of Compliance Si(tc weekly, 100% 482 484
243 NPDES Testing-Chlorination RemovalDischarge Testing,per pipeline 100%s 121 122
244 NPDES Test N-pH testing per discharge per pipeline 100° 122 123
245 Public ImprovemenC Agreement�m P40/ 954 559
_.....
246 Landscape Covenant 00 836 B40
_m
247 Landscape Covenantw1 Caltrans Agreement 100% 1,073 1,0378
m.
248 Water Efficient Landscape Plan 1110. 758 762
249 Plan research records request Per hone 100%1 103 104
250 TraMCommission Request 100% - -
251 Street Name Sign Installation 100% 538 541
252 Skop Sign Installation, 100% 655 658
QUALITY OF LIFE DEPARTMENT
Service Name P Rec®very Fee Year 3 at 412112015 Fee Year 3(99115115)
253 Vacant abandpned property regishaticn 10050~ 85 8
P .....,.__- %" 1000k 24 '.
:254 Air orf gate card-ne
255 Airport gate bard-renewal 100.6 15 $5"
256 Street Tree Permit Street Tree Removal' S0°fi78 f ' Tel
257 Street Tree Permit-Street Tree Trimming 50✓0 65
259 Street Tree Permit:-Street Tree Planting50°.x"I 75 75
259 Street Tree Permit-Street Tree Relocation 50%11127 126
.. 260 Street Tree Permit PracessinRfte...._,.m__ _ 50ro,! ...m --.... 36
261 Park Reservation-Prospect Park Sign Orb 57 57'.
_..
262 Rork Reservation Redlands Bowl 505;: 110 111
263 Park Reservation-Sentell Theatre 50°Jm 110 111
264 Park Reservation-Sylvan Park 50%1 110 111
265 Park Reservation-Other Parks 50%I 86 EFi
266 Rental Dwelling Permit, 1 acre 100% 77 T7
267 Recital Dwelling Permit,1-3 acres 300% 90 905
268 Rental dwelling Permit,3:91-5 acres 100% 100 1(71
269 Rental Dwelling Permit,>5.01 acres 100% 110 111
270 Rental Dwelling_Permit-Reinspection 100% 39 39
POLICE DEPARTMENT
Service Name. is Recoro M _.-. Fee Year 3 at 412112415 Fee Year 3(49115115)
271 Film Permits 100%3 406 408
.:272 Background Checks 100°,6'; - _ ... ... 21 ... ,-._...,,..-..,... .,._.:..,..,,..,�..�.:,.�:,.. .21
273 False alarm response 100%:i 193 194
274 Bicycle license 4740 5 5
275 CCW permit _Statute i 100- iCiO
276 CCW permit renewal Statute 25 25
277 Fenge print rolling 100-A: 25 LL S
278 Miscellaneous-permits 100%, 102 103
279 Miscellaneous-photos' 100-A 61 6t
280 Repossession 100% 19: ', d
7536 Exhibit A-B-A,mended Fees 9.15.15
POLICE DEPARTMENTcontinued
Service Name 'A Recovery Fee Year 3 at 41211261 a Fee Year 3(49115(15)
281 Vehirle impound' all others 100°I 235 236
282 Vehicle impound DUI 100( 235 236
283 Visa Clearanre 100% 11 11"
284 Gat adoption 6l 7 7
_265 pag ad®pt�csn,.. _ 10% -- ----- 12., $
_ ,. -
286 Animal boarding _16°' __-. __._.._ 10 60
267 Cal release-owner 33% 20 rt 2
288 Gal release-owner.<4 months 16°,W 10 20"
269 Dog release-owner 49W 30 30
290 Dog release-owner, 4 months' 321/.: 29
291 Shelter apprehension,cat- 19e10 10 f9 p
292 Shelter apprehension,livestock-Iarg_e 76%; 40 4Y1
293 Shelter apprehension,livestock medium _ 57°1! ....— 31)
294 Shelter apprehension,livestock-small 3$0/0
295 Shelter apprehension,unaltered-1st Statute j35 35
296 Shelter apprehension,unaltered-2nd statute 3 50 511'
M�.
297 Shelter apprehension,unaltered-3rd Statute 3 1011tq w
298 Trap^rentals 7 00 A 58' 56
.n
299 Clop Vaccine 1001 23 23
300 Cat Vaccine --- 65% 15 1
301 MassraPiso perm[[: 1R0% 172 103
302
,302 Massage Therapy Business Owner permit-initial 1004'b 380 382
303 Massage Therapy Business Cwner permit-renewal 00v6 195, _ -- 196
304 Solicitor permit 100% 102 103
305 Taxi Driver permit(3 yr.permit) 100% 287 288
306 Tow Truck Dever permit 10095 74 74
307 Adult Oriented Business penmt 1001 _ 338 � 340
308 Adult Emertainer permit -... 100% 102 103
309 Remote Bingo 100" 545 548
310 Gat-Spay _ _. 57% 28 -28'
311 Cat-Neuter 85% 28
312 Dog-Spay (up to 30 Ibs) 78%1 51 m
313 pD9—Spay (31_50 lbs), 56°fid
314 Dog-Spay (51 to 75 lbs) m 51% 51 51
315 Dog-Spay (76-1001bs) 37`: 51 51
316 Dog,-Neuter(up to 30 Ins) 93%, 51 i
317 Dog Neuter 131-50 lbs) 63%k 51 5t
318 po e Nouter 5i to 75 Ibs 55%
319 Dog-Neuter (76 100 Ibs} 44%1: 51 51
320 Cost Recovery-Delinquent Parking Citations 1031 .nae Fttteerlercent 5% oftlle"attlottntoflherCel3rk t98rs1 kaki cittroh krs4e�t(sltars<;:
FERE DEPARTMENT
Service Name: %Recovery Fee Year 3 at 412112615 Fee Year 3(09115115)
321 False alarm-residential 100% 144 145
322 False alarm-commercial 100%1 256 259
PLAN REVIEW
323 Plan review-camntefdal:
100°r;1 267 258:
324 Plan review-Multi family 100% 271 _ 272
325 Plan review-other(accessigrading,house moving) 10007 215 216
326 Plan review-residential tract 100% 360 362
327 Plan review-single family 100% 276 277
328 Plan review-consultationsjhoudy fee) 100% 163 164
329 Plan review-prevention engineering 10096 274275
330 Plan review-fuel dispensing
18095 296 299
331 Plan review-hood&duct 100% 262 263
332 Plan review-medical gas 10095
-- 262 263
_ _ _.
333 Ptan review-portables 10fl°R 298 m _._ _ 299
334 Plan review-spray booths i ofl la„; 262 263
STATE MANDATED FIRE MARSHALL INSPS
335 Ins care facilities/churches 100",4x' 230 231
o
.:336 Ins re school I school tda care 1001x .r ... �_
Insp-P y _...._._ _ - --I _ ...,. 195 .,,.. _ .__,...,..... r_ 196:,
337 Insp-high rise 100%! 395 397
338 Insp...-daycare[`foster care(6 or less)., 100 A
159_. . .- _..,. ...... _._ 160.
PREVENTION INSPECTIONS
339 Insp aprtmntfcandD 1-10 uriis 100°6', 183 184
340 Insp-apdmnVcondo 11-30 units 100% 219 220
341 Insp-aprimnlfcondo 31-50 units 100%, 225 227
842 Insp-aprtmntfcondo 57-75 units 100W 298 299
343 Insp-aprtmnticondo 75-140 units 100% 298 299
.:344 Insp.:-aprtmntdeondo 101+units.. ., 1001' 371 373...
345 Insp”oart of occupancy ordinary hazard 1001 166 167
346 Insp cert of occupancy high hazard 100% 202 203
347 Insp:-commercial B-2 100% 146 147.
348 Insp-commercial Xmas tree 100% 146147'
5 7536 Exhibit A-B-:Amended Fees 9 15.15
FIRE DEPARTMENT continued
Service Name %R-overy Fee Year at 4/2112015 Fee Year (09/15115)
349 Insp-commercial high hazard 100V 202 203
350 Insp-motels 1-20 units 100%1 154 155
351 Insp--motels 21-40 units 100%s 190 191
352 Insp-motels 41-50 units 106°k, 190191
_-
353 Insp.-motels 51+units
354 Insp-commercial occupancy re Inspection
ENGINE COMPANY INSPECTIONS
µ355 Engird company insp•ordinary hazard 100 J 134 135
356 Engine company;insp high hazard 100%6 168 164
357 Aircraft repair hangar permit- 100W 22B 227
358 Aircraft refueling vehicle permit 100%` 23B 239
359 Compressed gasiLPG permit 100! 238 239
360 Covered mail permit 100W 290 299
361 Dry cleaning permit 100% 226 227
362 C1ust producing permit 100%/ 262 263
363 Explosives permit 100%i 322; 324
364 Fruit ripening permit100%1 298 299
365 Flammablelcombustible liquid permit10 Y 10 250 251
366 Hazardous I toxic/corrosive permit _----. --._ 10D%1: 250 251
r - -
367 High:piled combustible permit 100% 2$8 287
368 Junkyard permit -- _ 106°k', 395 397
369 Lumberyard permit 100% 322 324
_----- _.._.... ._.
370 Medical gas system permit t00% 262 263
371 Pesticides permit 100%11178 179
372 Pipeline-excavation/operation permit 100%1 256251
as permit .16636
373 Poison _ ',,_.
9 P 250 251
374 Radioactive material permit. 100°k 250 251.
375 Refrigeration equip/permit 100% 250 251'
376 Repair garage permit 100% 250 251
_ .� ..-..._.. ...,._.. ......__. ......... ..._... ...�._.... ... ...
377 Spray booth permit
100W 250 251
378 Tanks permit 100%l 250 251'
379 Welding/cutting permit 100%1 250: 251
3B0 Bonfire permit: 100%. 178 179
_......381 Carnival!fair pe .�.............rmit 100%j 250 251...
382 Fireworks permit'' 100% 743. 747...
383 Open flame permit 1DO% 226 227
384 Parade float permit 100% 154 155
385 Assembly 1000+persons w/stage 100% 322 324
386 Assembly<1000 persons wl stage 100% 322 324
387 Assembly 300+persons no stage 100% 322 324
388 Assembly 50-299 persons no stage 100% 226 227
389 Tents/canopies 100% 226 227
WEED ABATEMENT
390 Weed abatement admin 100% 104 155
391 Weed abatement disking" 100% 21 '�^1
392 Weed abatement mowing_lot'* __.. 100%j 21 2`1
393 Weed abatement hand woe* 1000 ; 21 21
394 Weed abatement re-inspection 100% 40 40
HYDPANTIHYDRQ FLQW TEST
....... ——
395 Hydrant/Hydro Flow Test=Install,I tank 100°6 310 312
396 Hydrant/Hydro 2tanks 100%''_. _..,.... .___
y 383 385
397 Hy rant/Hydro Flow Test-Install 3 tanks too%: 450 1457
_ — - -- — -.._...... _—
398 Hydrant/Hydro Flow Test-Removal,i tanks 100W 310 312
39g HydrantJHydro Flow Test-Removal,2 tanks 100%', 383 — 385
400 Hydrant/Hydro Flow Test-Removal,3 tanks 100;`0, 455 457
401 Admin fee-cost recovery 100%:: 94
44,
— m . w .
402 Flow Test Fire Flow 100% 238 239
403 Miscellaneous Inspection/Permit Hourly 100",k, 136 /Hourly 137 /Hourly
404 Alarm System Plan Review,Sprinkler monitoring only 100% 144 145
405 Alarm System Plan Review„10 or less initiating devices 100%j 289 290
406 Alarm System Plan Review,11-20 initiating device 100% 433 435
407 Alarm System Plan Review,20 or more devices 100% 578 581
408 Sprinkler System Plan Review.25 heads or less 100°J 289 290
409 Sprinkler System Plan Review,26-99 heads t00% 433 435
_v... ._...,. ....... _,_.. --
410 Sprinkler System Plan Review,100 heads or more 100% 578 581
411 Smoke Control System Plan Review,review of rational analysis 100!0 155 1,161
412 Smoke Control System Plan Review,Design Testing 100,5 1,155 1,161
413 Inspection 100,000 sq,it or less 100%1 144 145
414 Inspection 100 000 500,000 sq,it 1003x`, 217 218
6 7536 ExhibitA-B:-Amended Fees 9.15.15:
FIRE DEPARTMENT continued
Service Name %Recovery Fee Year 3 at 412112015 Fee Year 3(09115115)
415 Inspection 500,001 sq.It and above 100°k 289 P90
416 Const-Automatic fire-extinguishing system,25 heads or less 100°k 289 290
417 Const-Automatic fire-extinguishing system,26-99 heads 400°k 433 435
418 Const-Automatic fire-extinguishing system,100 heads or more 100% 578 581
419 Const-Kitchen Hood and Duct 1009A 289 290
420 Const-Clean Agent System 100% 289 290
421 Const-Battery Systems 100% 289 290
422 Const-Compressed Gases 100% 289 290
423 Const-Cryogenic fluids i00°6 289 290
424 Const-Alarm and defection systems/equip,sprinklers monitoring only 100% 144 145
425 Const-Alarm and detection systemslequip,10 or less initiating devices 100% 289 290
426 Const-Alarm and detection systems/equip.11-20 initialing devices 100% 578 581
427 Const-Alarm and detection systemslequip,20 or more devices 100% 867 871
428 Const-Fire pumps and related equipment 100% 578 581
429 Const-Flammable and combustible liquids 100% 289 290
430 Const-Hazardous Materials 100% 578 581
431 Const-Industrial ovens 100% 289 290
432 Const-LP-gas i00% 289 290
433 Const-Private fire hydrants f00°k 433 435
434 Const-Spraying or dipping 100% 433 435
435 Const-Standpipe systems 100% 433 435
436 Const-Temporary membrane structures and tents 100% 144 145
` Includes 3 hours standby
" The fee listed is the admninistrative processing fee. Any vendor charges will be added to the processing amount.
RECREATION DIVISION
Service Name Fee Year 3 at 412112015 Fee Year 3(09115115)
FIELD RENTAL RATES
Rental Fields:
Texonia Park(Texas Street and Lugonia Ave.)
Community Park(Church Street and San Bernardino Ave.)
Brookside Park(Brookside Avenue)
Gratton Park(Independence Avenue)
Clement School Ball Fields and Tennis Courts*(Pennsylvania Avenue)
Orangewood School.(Stuart Avenue)
'Joint Use Agreement with Redlands Unified School District
User Groups:
Group 1: City of Redlands—City operated recreation programs and activities.This group receives
first priority for field use and allocations.No rental fee.
Group 2: Organized Youth Sports—Registered non-profit or charitable group with registered
non-profit status with the State of California,complete with tax exempt identification number,offering
organized youth sports.All participants shall be under 18 years of age.Fees noted below.
Group 3: Adult Sports,CommunitylBusiness Groups and/or individuals—League or organized
sports or activities for participants 18 years of age or over;tournaments:and other activities requiring
field reservations. Fees noted below.
Rental Rates:
437 GROUP 2
Field Use S 101 hour per field S 10/hour per field
Field Lighting 5 151 hour S 15/hour
438 GROUP 3
Field Use 5201 hour per field $201 hour per field
Field Lighting S 301 hour S 301 hour
Field Lighting at Crafton Park and Community Park is paid directly to
utility provider by user.
439 Miscellaneous:Staff Call-Out fee is$40 per hour and shall be assessed when city staff S 40 per hour S 40 per hour
is called to a field for any of the following reasons:confirm field reservations,tum
lighting onloff,clean garbage!debris left by users,resolve complaints and/make repairs
resulting from abuse by user.
FACILITY RENTAL RATES
Facilities:
Redlands Community Center(111 W.Lugonia Avenue)
Redlands Senior Center(111 W,Lugonia Avenue)
Joslyn Senior Center(21 Grant Avenue)
7 7536 ExhibitA-B-Amended Fees 9.15,15
RECREATION DIVISION
Service Name Fee Year 3 at 4121/2015 Fee Year 3(09115/15)
User Groups:
Group 1: City of Redlands/Public Agency-City personnel(for departmental,city and/or regional
business),City Sponsored Groups,Council Members,Council appointed commissions,
committees,and task forces:public agencies with reciprocal agreements.
No fee. No Deposit Required.
Group 2: Redlands Non-profit Organization and Community Groups-Registered non-profit or
charitable group with registered non-profit status with the State of California,complete with tax
exempt identification number:offering free membership open to the general public;
groups sponsoring activities open to the public free of charge.No fee.$200 deposit required.
Group 3: All non-resident individuals or groups;other community groups,businesses and/or
individuals;groups soliciting donations or charging admission,groups sponsoring activities
closed to the general public. Fees noted below. $200 deposit required.
440 GROUP 3-Facility/Room Rates
Gym $61/hour $61/hour
Racquetball Court $201 hour $20/hour
Multipurpose Rooms $25!hour $25!hour
Kitchens $51 Oat fee $51 flat fee
Computer Class Room $30/hour $30/hour
Conference Room $15 hour $15 hour
Game Room(CC) $25 hour $25 hour
Building $707 1-4 hours $707 1-4 hours'
$51 each additional hr '$51 each additional hr
441 Miscellaneous Charges for All Groups
Refundable Cleaning Deposit $200 flat fee $200 flat fee
Attendant/Staff Supervision Fee $20 per attendant $20 per attendant
Fees shall be prepaid to guarantee reservation.
Refunds will be issued less a 10%administrative fee.
A processing fee of$10 shall be assessed when applicants and/or participants request
deviation from the standard processing time of five business days.
All user groups shall comply with the City's established field and facility rental policies.
Rental agreements may be negotiated for continuous use of the fields and/or facilities.
The rates contained in these agreements may vary from the structure presented above.
and shall be approved by City Council.
RECREATION SERVICES/PROGRAMS/ACTIVITIES
ADULT SERVICES,PROGRAMS AND ACTIVITIES
442 Adult Open gym $1/day per person $1/day per person
$2/day per person non-resident $2/day per person non-resident
443 Adult Open Racquetball $1!hour per person 18 and over $1/hour per person 18 and over
$2/hour per person 18 and $2!hour per person 18 and over,
over,non-resident non-resident
$25 annual pass-resident $25 annual pass-resident
$35 annual pass-non-resident $35 annual pass-non-resident
444 Adult Classes
445 Adult Family Trips 100%Cost of Trip 100%Cost of Trip
446 Annual Pass $25/person 18 and over, $251 person 18 and over,resident
I.D.,Game Room,Gym Usage, resident $351 person 18 and over,non-
Racquetball and Tennis Courts $35/person 18 and over,non- resident
resident $50 for group homes
SENIOR SERVICES,PROGRAMS AND ACTIVITIES
447 Bingo $0.50 /card $0.50 /card
448 Senior Tournaments $201 tournament per person $20/tournament per person
$100/tournament per team $1001 tournament per team
449 Senior Classes
450 Trips 100%cost of trip 100%cost of trip
451 Senior Transportation Program $ 1.75/person each way $ 1.75/person each way
Bus Pass $17.50 for 10 one-way trips $17.50 for 10 one-way trips
Senior Patron-A Patron is any senior making a voluntary donation in excess of$20 per year to
either senior center. Patrons shall receive identification cards and shall save$5 on senior services,
programs and activities.
YOUTH SERVICES,PROGRAMS AND ACTIVITIES
452 Youth Annual Pass $10/person No Cherpe
for use at Community Center
453 Teen Dances $3/person $3/person
454 Teen Trips
Scholarships are available for all youth services,programs and activities. To qualify,scholarship
recipients shall meet income requirements as established by the Department of Housing and Urban
Development for San Bernardino County.
8 7536 Exhibit A-B-Amended Fees 9.15.15
MISCELLANEOUS:
455 Contract Classes City/Contractor Split=30nWfees are set by contractor
456 Special Events 100%cost of event
457 $10 f day per space without table
Boutique Spaces S20/day per space with table
Smiley Gardens $20/year per plot
458 Clement Gardens$30/year per plot
Garden Plot Spaces Lugonia Gardens $35/year per plot
459 Program Attendant Fee $20/hour per employee
460 10%discount for individuals and teams registering a minimum of 30 days prior to the dose of registration
Early Registration' (applies to all Youth,Adult,or Senior classes or programs requiring registration).
461 10%discount for multiple family members registering in the same Gass or program(applies to all Youth.Adult,
Multiple Registration' or Senior classes or programs requiring registration).
FINANCE DEPARTMENT
Service Name %Recovery Fee Year 3 at 4/2112015 Fee Year 3(09115/15)
462 Business License-new 100%' 67 6_7
463 Business License-renewal 100%i 23 23
464 Yard Sale Permit 100%!, 3.40 3.40
465 Returned Check 100% 39 39
466 Dog licensing 100%i 23 23
467 Dog licensi09-spay/neutered 50% 11.50 11.50
468 Dog licensing-replacement tag 100% 17 17
469 State CASp Svc Fee' Statute 1 1
SB 1186,Disability Access Legislation(eff.1/1/2013-12/31/2018), imposes a$1.00 Stale fee on applicants for new and renewal business licenses with 70%retained by the City an
30%remitted to the State.
LIBRARY SERVICES
Service Name %Recovery Fee Year 3 at 4/2112015 Fee Year 3(09115/15)
470 Reservation of library materials _ 26% 0.75 Item 0.75 Atem
471 Non-resident fee 96% 30 30
9 7536 Exhibit A-B-Amended Fees 9.15.15
City of Redlands
Construction CostCalculations
Construction Types Construction Types
1.11,111,V-A rated 1,11,Ili; IV,V-B rated
2011112 Total" Mull.By Base Cost Cost for each Base Cosh Cost for each
iBC Rala: Plan Check/ Inspection' Building Hrly Rale Threshold Additional Threshold Additional
Class IBC Occupancy Type Project Size Process Hours Hours Time $105.40 Size 100 s:f. Size 100 s.f.
472 A-1 Assembly uses,usually with 5.000 18:2 57:0 75 $7;926 $7;926 $35.63 $5,945 526.72
Greater fined seating,intended for the 10.000 29:1 83.0 92 $9;708 $8,7Q8 $20.32 $7,281 $15.24
Than 50 production and viewing of the 20;000 36.4 75.0 111 St 1,739 ,$1,1,739 $24.90 $8,805 $18.68
Occupants performing arts or motion 30,000 48:0 87.0 135 $14,230 ,. , $34;230 $17;13 $10,672 $12-85
picutres: 50,000 59.5 108:0 168 $17,655 $.17,855 $10.44 $13,241 $7.83
100;000 85.0 132.0 217 $22,873 $27873 $10.44 $€7,155 $7;83
473 A-2 Assembly uses intended for 1.000 14:3 30x4 45 $4;690 $5,863 $38:21 54,890 530-57
food and/or drink consumption. 5;000 22.5 33.6 56 $5;913 $7,391 $39.26: $¢,943 $31.41
10,000 31.0 40.0 71 $7;484 $9;355 $21,87 $7,484 $17;50
Restaurant 20;000 411 46.4 88 $9;233 $11,542 57:03 $9;233 S5-62
50,060 46.0 57.6 104 $10,920 $13;650 $B.64'. $50;920 S6.91
100;000 66.0 704 136 St4;377 $17,971 58.84? $44377 86:91
474 A-3,A-4 Assembly uses intended for 1,000 15:2 50.5 66 $6;929 $8,662 $47,83 I: 36;929 $38.26
worship;Assembly uses .5,000 24.4 55.9 BO $8,460 $10,575 $52.02 $8;450 $41.61
intended for viewing of outdoor 10,000 33.5 66.5 100 $10;540 $13,176 $25:05 $10,548 $20.04
sporting events and activities 20,000 41.9 77,1 119 $12,545 $15,681 $11:75! „$72;545 $9-40
with spectator seating 50,00D 50.0 95.8 146 $15,364 $19,205 $11.27 $15;954 $9.02
100,000 71.5 117.0 189 $19;873 $24.8411 $11.27' ,<;$19,873 $9,02
475 S Buildings or spaces for office 1,000 12.5 24.4 37 $3,892 54,866 $33.17'; ;$3,892 $26.54
professional or service type 5,000 24:D 27.0 47 $4,954 $6,193 $33:32 .34795.4 $26,65
transacations,including storage 10,000 27.5 32.1 60 $6;287 $7,858 S15.B7; ,$6.267 $12-69
of records and accounts; 20,000 34.4 37.3 72 $7,556 $9,445 S6.135} ', $7;55,6 55:48
Restaurants with less than 50 50,000 41;0 46.3 87 S9;20D $11;500 $7.37 59;200 $5:90
occupants 10D,000 58.7 56.6 115 $12,150 $15,188 $7.37 $12150 $5.90
476 E Buildings or rooms used by 500 9;3 29,5 39 $4,088 $5,110 $56.68 ,,:5408.6 $45:34
more than 6persons for 2,500 14.8 32.6 47 54.995 $6,243 $62.22 x,995 S49-78
educational purposes up to the 5,000 20.4 38.8 59 $6,239 $7,799 $29.79: , , $8,239 $23.84
121h grade, 10,000 25;5 45.0 71 $7,431 $9;289 $17.01 ;57 4$4 $13,81
Day care for 6 or more children 25;000 34.0 55.9 90 $9;472 $11,840 $11.18:` $9,472 58:94
older than 2-112 years'of age, 50,000 42.8 68.3 113 $11,708 $14,635 $11.18 ?$i1Y708 $8.94
477 F Factory and industrial uses that 1,000 15.9 34.2 50 $5,282 $6;602 $43,30!, $5 282 $34.64
include the fabrication or 5,000 25.5 37,8 63 $6,667 $8;334 $44.13` ;,,56;667 $35.30
manufacturing of Moderate and 10,000 35.0 45.0 80 $8,432 510,540 $21.02 55432 $16.81
Low Hazard materials 20,000 43.8 52.2 96 $10;114 $12,642 S9,16 ,„ $17),114 $7:33
50,000 520 64.8 117 $12;311 515,389 $9.86[ ,;$1231 $7-88
100,000 75.0 79.2 154 $16,253 $20,317 59.86': $36:253 $7.88
478 H-1,H-2, HighHazard;Detonation hazard; 1;000 25,0 57,0 82 $8,643
_0 $55;34 $6;482 S41,50
H•3,H4. Deflagration hazard or hazard 5;OOD 40.0 63.0 103 $10;857 ,,410 A 5 7, $56.92 $8,142 S42'69
H=5 from accelerated buming; 1 D,000 55.0 75.0 130 $13;703 ;53,703 $31.62 $10,277 $23.72
Materials that readily support= 20;000 73.0 87:0 160 $16;865 Sib B&5 $10.44 $12,649 $7.83
combustion;Materials that are 50;000 81.7 108:0 190 $19;995 ;$79,995 $12.50 $14,996 $9:38
health hazards 100;000 117:0 132:0 249 $26;246 ;$26,246 512.54 519,684 59.38
479 1-1 Housing of clEents on a 24-hour 1,000 9.5 27.4 37 53,890 33 890 $22,68 $2;917 $17.01
basis in a supervised residential 5,000 15.3 30:2 46 $4;797 54797 $24.22 53,598 $18.16
environmentprovi0g personal 10,000 21:0 36.0 57 56;008 3G 6 $11.61 $4,506 56.70
care services 20,000 28:3 41:8 68 $7,169 $7,189 $5.21 $5,376 $3,91
50;000 3110 5€:8 83 $8,732 58,732 $5.34 56;549 $4.00
100,000 44.8 63.4 108 $11;401 $t`,°1 Alf, $5.34 $8,550 $4.00
480 1-2,1-3 Medical,surgical,psychiatric, 1,000 18,2 59:0 77 $8,132 , $81132 $45.10 $6,099 $33.83
nursing or custodial care on a 5,000 29:1 65:2 94 $9;936 $9,936 $49.17 $7;452 $36;88
24-hour basis for more than 6 10,000 40.0 77.6 118 $12;394 $j2394 S23.631 59,296 $17:72
persons;facilities where 20,000 80.090.0 140 $14,757 $,14 757 $10.44 $11,067 $7.83
persons are restrained 50,000 58.0 1117 170 $17,890 $57990 $10.29 _ $13,417 _ $7.72
-------------------
100,OOD 82.0 136.6 219 $23,036 •523,03$ $10.29 $17,277 $7.72
Resolution No.7536 Exhibit A-Building and Safety Construction Cost Calculations
Construction Types Construction Types
I, 11, 111,V-A rated 1,It,ill;IV,V-B rated
21711!12 To1a1 Mull:By Base Cosh Cost for each Base Cost( Cost for each
IBC Data! Plan Check/ Inspection Building Hrly Rate Threshold Additional Threshold Additional
Class IBC Occupancy Type Project Size Process!lours Hours Time $105,40 Size 100 s,f. Size 100 s,f,
481 1-4 Day care operations of more 1,000 10,2 24.7 35 $3,681 : s3,6a.i 523.02 $2,761 $17:27
than 6 people of any age where 5,000 16.4 27.3 44 $4,602 $4,802 $23.90 $3,452 $17.92
the care is for less than 10;000 22,5 32.5 55 $5,797; _$5,79.7, $11.41 54;346 $6:56
24`-hours a day 20,000 28;1 37.7 66 S6,93B
56 9.38 5526 $5;204 $3:95
50.000 34.0 46.8 81 $6,517 $8,517 $5.14 $6,388 $3.86
100,000 1 48.0 57:2 105 $11;089 $11,ti89 $5.14 $8;316 $3.86
482 M Display and sale of 1,000 14;1 33.9 48 $5,058 $6;323 $39.562, $5 f15l3 $31.64
merchandise accessible to the 5,000 22.5 37.5 60 $8;324 $7,995 $41.06 $6,324 $32,84
public 10,000 30.9 44.6 76 $7,967 $9,958 519:60 „$7;967 515:68
21),000 38,7 51:8 90 $9:535 $11,918 58.49'd 58;535 $6:79
50,000 45:5 64.3 110 $11,572 $14,465 59.17 511`;$72. $7.33
100,400 66.0 78.6 145 515;238 $19,048 $9.17r= $15;23$ $7,33
483 R-1,R-2 Transient and nontransient 5,000 18,4 71.1 89 $9;428 $9,428 $39.00 $7;071 $29.25
lodging including hotels,motels 10,000 29.4 78;6 108 $11,378: $11;378 $27.39 58,534 $2D,54
apartments;and boarding 20,000 40.4 93.5 134 $14;117 $141.17 56.81 $10,588 $6.61
houses 50,000 50.5 108.5 159 $16,759 $16759 $7.31 $12,569 $5,48
100,000 59.0 134 7 194 $26;416 $20;4.16 $5.90 $15,312 $4.42
200,090 85.0 164:6 2501 526,311 $26,311 $5,90 $19;733 54:42
484 R-3,R-3.1, One and two-family homes; 1,000 7,7 17.5 251 52;657 53,321 $85;33 $2;857 $68:26
Ft'4 Residentially based 24-hour 2;000 12.4 19.3 32 $3;340 $4;174 $109.57 $3;341). $87.66
y 54;216 $83,59
facility for or fewer clients nT 3,000 17:0 23.4 40 54,216 55,270 $104:48
any age;Residential 4,006 21.3 26.7 48 $5;052 $6,315 $€86.96'; $5`,052 $149.57
carelassisted living for more 5;000 29.0 33:1 62 $6;548 $8,1851 $48.38 $6,548 $38,70
than 6 ambulatory clients 10,000 40:0 40.5 80 58,483 510,604 S48,3B_ „$8,483 $38.70
485 R-3 REPEAT OF MODEL 1,000 3:9 16A 20 $2;094 $2,617 $56.89r $45.52
One and two-family homes. 2,000 6.2 18.6 24 $2,549 $3,166 $56.89? , $2s49 $45,52
Repeat Plan Check set at 50% 3,000 8.5 20,0 29 $3;004 $3;755 $54,35 $3;004 $43.48
of initial plan check,per current- 4,000 10.6 22;6 33 $3;439 $4,299 $77.41 ii $3;439 $61.93
Master Fee Schedule. 5;000 14:5 24:0 39 $4,058 $5;073 $19.76 $4;658 $15,81
10,000 20.0 26.0 46 $4,849 $6,061 $19.76 54899 $15:81
486 S-1 Moderate hazard storage 500 11:6 32.8 44 $4,679 $4,879 $54.97 $3,510 $41123
2,500 18:6 36.2 55 $5,779: $5779 $58;51 $4,334 $43.89
5,000 25:6 43:1 69 $7,242 .SZ 242 $28.03 55;431 $21.02
10;000 32.0 50.0 B2 $8,643. $8,643 $15.51 $6,482 $11:63
25,000 42.0 62.1 1041 510,969 $7088.9. $10.45 $8,227 $7.84
50,000 53.6 75.9 129 $13,583 513,583 $10:45 $10,187 $7.84
487 S-2 Low hazard storage 500 11.6 32.8 44 $4,679 $4875 $54.97 $3,510 $41;23
2,500 18.6 36;2 55 $5,779 5$7,7.9 $58;51 $4;334 $43.89
5,000 25.6 43.1 69 $7;242 ,$7;242 $28.03 $5,431 $21;02
10;000 32.0 50.0 82 $8,643 $8643 $15.51 $6,482 $11.63
25;000 42.0 62,1 104 $10,969 $10,98
9 510,45 .$8,227 $7:84
50,000 53,0 75.9 123 $13;583 §73,583 510:45 510,187 $7.84
488 U Accessory and miscellaneous 1;000 7,5 16,3 24 $2,507 $3,134 $20.47: $16.38
structures not specifically 5,000 12.0 18.0 3D $3,162 $3;953 $20,89' „53;162 $16,71
classified 10,000 16.5 21.4 38 S3,99B S4,S97 58.95 53;898. $7.96
20,000 20.6 24.9 45 54,794 $5;993 54.56, 794 53:65
50,000 25x0 30;9 56 $5,888 $7;359 $4.44 $5;888 $3.55
100,000 35:0 37.7 73 $7,664 $9581 54.44 $7:864 $3,55
489 Dental 1;000 12.5 45.2 5131 $8,086 $6,066 532.31 $4,564 $24:23
Medical S;ODD 20,0 50,0 70 $7;376
$7378 $35,89 $5,534 $26:92
10;000 27:5 59.5 87 $9;173 $9113 $17.31 $6;880 $12.98
20,600 34.4 69,0 t03 $10,904 51.0 944 $8.17 58,178 $6:13
50,000 41.0 85,7 127 $13;356 $13,3b6 57,75 510,417 $5:81
100,000 .58.71 104.8 163 $17,230 $17 230 $7.751 $12,922 $5.81
Resolution No.7536 Exhibit A-Building and Safety Construction Cost Calculations
Construction Types Construction Types
I,II,III,V-A rated I,If,III,IV,V-B rated
2011/12 Total Mull.By Base Cost @ Cost for each Base Cost @ Cost for each
lBC Data: Plan Check/ Inspection Building Hrly Rate Threshold Additional Threshold Additional
Class IBC Occupancy Type Project Size Process Hours Hours Time $105.40 Size 100 s.f. Size 100 s.f.
TENANTIMPROVEMENTS
490 B Medical Offices 1,000 6.4 21.3 28 $2,914 $3,642 $19.95 $2;814 $15.96
5,000 10.2 23.5 34 $3,552 $4,440 $21.87 $315$2 517.49
10,000 14.0 28.0 42 $4,427 $5,534 $10,51 $4;927 $8,41
20,000 17.5 32.5 50 55,268 $6,585 $5.64 $4.51
50,000 22.5 40.3 63 56,622 58,277 $5.92 „55;622 $4.73
106,0D0 36.01 49.3 85 $8,9891 $11,236 $5.92 $4.73
491 B Office Building 1,000 6.4 19.8 26 $2,754 53,442 $19.43 $2;754 $15.54
5,000 10.2 21.8 32 53,375 54,219 $21.02 $3 375 516.82
10,000 14.0 2B4O 40 $4,216 $5,270 $13.39„ ;,$4 2t6 $10.71
20,000 20.0 30.2 5Q $5,287 $6,609 $5.39 :55;287 $4.31
50,000 25.0 37.4 62 $6,561 $8,227 55.09 $5 58f S4.07
160,066 36.0 45,8 82 $8,618 $10,772 $5.09" 18 $4.07
492 A-2 Restaurant,more than 50 7,000 6.1 19.0 25 $2,649 53,312 $18.72 $2;648 $14.97
occupants 5,000 9.8 21.0 31 53,248 $4,060 $20,24 $3;44$ $16.19
10,000 13,5 25,0 39 54,058 $5,073 $9.72 ;$4;058 $7.77
20,000 16.9 29.0 46 $4,835 $6,044 $5.54:; $4;835 54.44
50,000 22.5 36.0 59 $6,166 $7,708 $5.67 > $6;188 $4.53
100,000 36.0 44,D 80 $8,432 $10,540 $5.67:; <58432 $4.53
493 M Store 7,000 6.6 20.9 27 $2,898 $3,622 $2027 Y $2;898 $16.22
5,000 10.5 23.1 34 $3,546 54,433 $22.02 $3;546 $17.61
10,000 14,5 27.5 42 $4,427 $5,534 $10.57:: :$4;477 $8.46
20,000 16.1 31.9 50 $5,273 $5,591 $5.96 ::$5;273 $4.77
50,000 24.0 39.6 64 $6,704 $8,380 $4.43; :;$8;70} $3.54
100,000 32,0 48,4 80 $8,475 $10,593 54.43 i' ;$6;47$ $3.54
494 BIH Lab!R&D 1,000 7.3 22.8 30 $3,170 $3,962 $22.28+ ;.;$31J0 $17.82
5,000 11.6 25.2 37 $3,883 54,853 524.15 $19.32
10,000 16.0 30,0 46 $4,849 $6,061 $17.59 $4;899 59.28
20,000 20.0 34.8 55 $5,776 $7,220 $6.D6 s '$5;776 S6.46
50,000 30.0 43.2 73 57,716 $9,645 $5.161, $4.13
160,000 40A 52.8 93 $9,782 $12,227 $5.16 $9;782 54.13
SHELL BUILDINGS
495 B,M,5 All Shell Buildings 5,0D0 21,5 11.4 33 $3,475. $12.35 $2,606 $9.26
10,000 25.3 13.5 39 $4,092
39,092 $4.36 $3,069 $3,27
25,000 29.4 15.6 45 54,746;,,, ,,,,$47+18 $11,37 $3,560 $8.53
50,000 47.0 25.0 72 $7,589: $7;589 $4.03 $5,692 $3.02
75,000 51.0 30.6 82 $8,596 ';;58;598 $4,12 $6,447 $3.09
100,000 55.0 36.3 91 $9,627 :58,627 54.47 $7,220 $3.35
125,000 60.01 41.9 102 510,744 ;;$10,744 $5.05 $8,058 $3.79
150,000 6(3.01 47,9 114 $12,008 008 $5.051 $9,006 $3.79
Resolution No.7536 Exhibit A-Building and Safety Construction Cost Calculations
City of Redlands
FEE SCHEDULE FOR MISCELLANEOUS ITEMS
Work Item Unit Time Hourly Permit Fee
Estimate Rate
Standard Hourly Rate $105.40
496 Standard Hourly Rate per hour 1 $105.40 $105
Antenna
497 Equipment Container each 2 $105.40 $211
498 0-30 ft each 2 $105.40 $211
499 31+ft each 2.5 $105.40 $264
500 Cellular/Mobile Phone,free-standing each 3 $105.40 $316
501 Cellular/Mobile Phone,co-location each 2 $105.40 $211
502 Balcony addition each 4 $105.40 $422
503 Carport MINOR(<or=200 sq ft.) each 2.5 $105.40 $264
504 Carport MAJOR(>200 sq ft.) each 3.5 $105.40 $369
505 Change of Occupancy each 4 $105.40 $422
Close Existing Openings
506 Interior wall each 2 $105.40 $211
507 Exterior wall each 3 $105.40 $316
508 Trailers,mobile homes, and house cars(per unit) each unit 3.5 $105.40 $369
509 Compliance Inspections/Reinspections each 3.5 $105.40 $369
510 Deck(wood)-up to 200 sq ft. each 2 $105.40 $211
511 Each additional 100 sq ft. each 100 sf 0.5 $105.40 $53
512 Deck(wood)(with calcs)-up to 200 sq ft. each 3 $105.40 $316
513 Over 200 sq ft. each 3.5 $105.40 $369
514 Demolition-Single Family Dwelling each 2 $105.40 $211
515 Demolition-Multi Family/Commercial each 3 $105.40 $316
Door
516 New door(residential) each 2 $105.40 $211
517 New door(Commercial/Industrial) each 4 $105.40 $422
Fence or Freestanding Wall(non-masonry)
518 6-8 feet in height, first 100 If up to 100 If 2 $105.40 $211
519 8- 10 feet in height,first 100 If _up to 100 If -2.5 $105.40 $264
520 Each additional 100 If each 100 If 1 $105.40 $105
521 Over 10 feet in height up to 100 If 3 $105.40 $316
522 Over 10 feet in height(with calcs) up to 100 If 3 $105.40 $316
523 Each additional 100 If each 100 If 1 $105.40 $105
Fence or Freestanding Wall(masonry)
524 Masonry,(6-8 feet high), pre-engineered up to 100 If 3 $105.40 $316
525 Each additional 100 If each 100 If 1.5 $105.40 $158
526 Masonry,Special Design(6-10' high) up to 100 If 4 $105.40 $422
527 Each additional 100 If each 100 If 1.5 $105.40 $158
528 Masonry, Special Design(over 10'high) up to 100 If 5 $105.40 $527
529 Each additional 100 If each 100 If 1,5 $105.40 $158
Fireplace
530 Masonry each 3 $105.40 $316
531 Masonry(with calcs) each 3 $105.40 $316
532 Pre-Fabricated/Metal each 2 1$105.40 $211
533 Flag pole(over 30 feet in height) each 2 $105.40 $211
Garage(detached)
Resolution No. 7536-Building and Safety Miscellaneous Items
Work Item Unit Time HourlyPermit Fee
Estimate Rate
534 Wood frame up to 1,000 sf each 4 $105.40 $422
535 MasonEy ue to 1,000 sf each 5 $105.40 $527
Grading(Cut and Fill)
536 0-100 Cubic Yards(Cut and Fill) 1.5 $105.40 $158
537 101-1,000 CY 2 $105.40 $211
538 1,000-10,000 CY 3 $105.40 $316
539 10,001 -100,000 CY 3.5 $105.40 $369
540 100,001 -200,000 CY 5 $105.40 $527
541 Each Add'I 10,000 CY or portion thereof 0.6 $105.40 $63
542 Greenhouse(non-commercial) each 3 $105.40 $316
543 Greenhouse(non-commercial)(with calcs) each 3 $105.40 $316
544 Lighting Pole each 2 $105.40 $211
545 Each Add'I Pole each 2 $105.40 $211
546 Partition-Commercial, Interior(up to 30 11) up to 30 Lf. 2 $105.40 $211
547 Additional partition each 30 Lf. 2 $105.40 $211
548 Partition-Residential, Interior(up to 30 Lf.) up to 30 Lf. 2 $105.40 $211
549 Additional partition each 30 Lf. 2 $105.40 $211
Patio Cover,Awning,Canopy,Trellis and Arbors
550 Wood frame up to 300 s,f. 2 $105.40 $211
551 Wood frame(with calcs) up to 300 s.f. 2.5 $105.40 $264
552 Other frame up to 300 s.f. 3 $105.40 $316
553 Additional Patio up to 300 s.f. 1 $105.40 $105
554 Solar Energy Systems
Residential 0-15 kW 3 $105.40 $316
Residential each additional kW> 15kW 0.1 $105.40 $10.54
._ _ - ---- -- - - .----- -- --------- - --- -- - -
Non-Residential 0-50 kW 8 $105.40 $843
Non-Residential 51-250 kW 0.067 $105.40 $7.06
Non-Residential >250kW 0.042 $105.40 $4.43
555 Stucco Applications up to 400 s.f. 1.5 $105.40 $158
556 Additional Stucco Application each 400 s.f. 2 $105.40 $211
557 Repairs(For Fire,Water, Decay& Pests) <$10,000 1.5 $105.40 $158
558 Repairs(For Fire,Water, Decay& Pests) $10,000-25,000 2.5 $105.40 $264
559 Repairs(For Fire,Water, Decay& Pests) $25,001 -100,000 4.5 $105.40 $474
560 Repairs(For Fire,Water,Decay&Pests) >$100,000 5.5 $105.40 $580
Retaining Wall(concrete or masonry)
561 First 50 If up to 50 Lf. 3 $105.40 $316
562 Additional retaining wall each 50 Lf. 1.5 $105.40 $158
563 Special Design, 3-10'high (up to 50 If) up to 50 I.f. 3.5 $105.40 $369
564 Additional retaining wall each 50 Lf. 1.5 $105.40 $158
565 Special Design, over 10'high (up to 50 If) up to 50 11 5.5 $105.40 $580
566 Additional retaining wall each 50 Lf. 1.5 $105.40 $158
Remodel-Residential
567 500 s.f.Single Story up to 500 s.f. 3.5 $105.40 $369
568 501 -1,000 s.f. 501 to 1,000 s.f. 4 $105.40 $422
569 Additional remodel each add'I 500 sq ft) each 500 s.f. 1.5 $105.40 $158
Re-roof Single Family Dwelling/Duplex
570 Minor Repair<200 sq ft up to 200 s.f. 1 $105.40 $105
571 201 -3,000 sq ft 201 to 3,000 s.f. 2 $105.40 $211
572 >3,001 sq ft 3,001+s.f. 2.5 $105.40 $264
Re-roof Multi-Family/Comm./Ind.
Resolution No. 7536-Building and Safety Miscellaneous Items
Work Item Unit Time Hourly Permit Fee
Estimate Rate
573 Minor Repair<200 sq ft up to 200 s.f. 1.5 $105.40 $158
574 201 -3,000 sq ft 201 to 3,000 s.f. 2.5 $105.40 $264
575 3,001 -10,000 sq ft 3,001 to 10k s.f. 3.5 $105.40 $369
576 > 10,001 sq ft 10k+s.f. 4 $105.40 $422
577 Roof Structure Replacement up to 500 s.f. 5 $105.40 $527
578 Additional roof structure replacement each 500 s.f. 1.5 $105.40 $158
Residential Additions
579 One Story up to 500 s.f. 4.5 $105.40 $474
580 One Story 501 -1,000 s.f. 6 $105.40 $632
581 One Story >1,000 s.f. 7 $105.40 $738
582 Multi-Story up to 500 s.f. 5 $105.40 $527
583 Multi-Story 501 -1,000$.f, 6 1$105.40 $632
584 Multi-Story >1,000 s.f. 8 $105.40 $843
585 Sauna-steam each 5 $105.40 $527
586 Shed (up to 200 s.f.) each 3 $105.40 $316
587 Each additional 100 s.f. each 100 s.f. 0.5 $105.40 $53
Siding
588 Stone and Brick Veneer(interior or exterior) up to 400 s.f. 2 $105.40 $211
589 All Other up to 400 s.f. 2 $105.40 $211
590 Additional siding up to 400 s.f. 2 1$105.40 $211
Signs
591 Monument each 2.5 $105.40 $264
592 Wall-mounted Fixture each 3 $105.40 $316
593 Free-standing each 4 $105.40 $422
594 Repairs/Replacement each 1 $105.40 $105
-- -------- -- -------------- - -- -- - --- - -- - ----
Skylight
595 Less than 10 sf each 1.5 $105.40 $158
596 Greater than 10 sf or structural each 2 $105.40 $211
Spa or Hot Tub
597 Above Ground each 2 $105.40 $211
598 In-ground Private each 2.5 $105.40 $264
599 In-ground Public each 3 $105.40 $316
Storage Racks
600 0-8'high (up to 100 ID first 100 If 3 $105.40 $316
601 each additional 100 If each 100 If 1.5 $105.40 $158
602 over 8'high (up to 100 If) first 100 If 4 $105.40 $422
603 each additional 100 If each 100 If 1.5 $105.40 $158
Swimming Pool/Spa
604 Private <800 s.f. 5 $105.40 $527
605 Private >800 s.f. 5.5 $105.40 $580
606 Public <800 s.f. 5.5 $105.40 $580
607 Public >800 s.f. 6 $105.40 $632
608 Swimming Pool Houses each 4 $105.40 $422
609 Temporary Utility Connection or Occupancy 1 $105.40 $105
Window or Sliding Glass door
610 Residential Replacement qty. 1-4 1.5 $105.40 $158
611 Residential Replacement qty.5 or more 2.5 $105.40 $264
612 New Window(non structural) each 2 $105.40 $211
613 New window structural shear wall/masonry) each 2 $105.40 $211
614 Bay Window(structural) each 2 $105.40 $211
Resolution No.7536-Building and Safety Miscellaneous Items
Work Item Unit Time Hourly permit Fee>
Estimate Rate
615 Service Reuiq red in Excess of Standard per hour 1 $100.40 $105
66 Re-inspection der hour 1 $105.40 $105
617 Plan Re-Check perhour 1 $105,40 $105
618 Researchper hour 1 $105.40 $105
...................... _
619 Residential Building Reports each 0:5 105.40 _._._ 53
$105.40 or Consultant Fee Plus
620 Expedited plan review and inspection service perwhour_ 10%Administrative Charge
621 Off-hours inspection (min 3 hours) 3 $105.40 $316
622 Ctrp g-Moth Instfu entati n and eisrnic Hazards dapping Feel
valuation
',Group,kbbcuparkciss,ono,to tare stories excluding hot iemot is suooi
ill bthr uillongs valudtion 'st
44;12..
.All ocuu anoies sirtilrurrs`fee 0$5
y lisafio ,
6123 alifr�rhia He Eth safety ead , ptibn 1801'.6 build'n p? it fey $Oa 000
rrtrrilrn�arn:fe " $
Imp 1 Cl3s.:"ra new,
" oontior�"or
additidgs, S .uf
624 erlal Planiratenan Fie istan fl6or"`atea`
625 I ic'i fii i nnin A1C 2y a e
1 Pursuant to Californa Public Resources Cade Section 2705
2 In accordance with the January 1,;1996 Valuation Data
Resolution No.7536-Buiiding and Safety Miscellaneous Items
City of Redlands
Mechanical, Plumbing and Electrical
Standard Hourly Rate: $ 105.40
Fee Types-Mechanical Time
Estimate Fee
626 Permit Issuance (one time fee for each mechanical permit issued) 0.32 $34
627 Stand Alone Mechanical Plan Check 1.00 $105
628
Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts
and vents attached to such appliance. 0.75 $79
629 Installation or relocation of each floor furnace, including vent 0.75 $79
630
Installation or relocation of each suspended heater, recessed wall heater or floor-mounted
unit heater 0.75 $79
Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit,
631 absorption unit, or each heating, cooling, absorption, or evaporative cooling system,
including installation of controls regulated by this code 0.75 $79
632
Installation or relocation of each boiler or compressor to and including three horsepower, or
each absorption system. 1.25 $132
Each air-handling unit, including ducts attached thereto:This fee shall not apply to an air-
633 handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative
cooler or absorption unit for which a permit is required elsewhere in this code. 1.25 $132
634 Each evaporative cooler other than portable type 0.75 $79
635 For each ventilation fan connected to a single duct 0.75 $79
636
Each ventilation system which is not a portion of any heating or air-conditioning system
authorized by a permit 1.25 $132
637
Installation of each hood which is served by mechanical exhaust, including the ducts for
such hood 1.25 $132
638 Installation ar relocation of each commercial or industrial-type incinerator 1.00 $105
639 Miscellaneous: For each appliance or piece of equipment regulated by this code but not
classed in other appliance categories,or for which no other fee is listed in the code 0.75 $79
640 Installation or relocation of any ducts stem 0.75 $79
641 For each process piping system of 1 to 2 outlets 0.75 $79
642 For each additional process piping outlet 0.25 $26
643 ether Mechanical Inspections(per hour) 1.00 $105
Fee Types-Plumbing Time
Estimate Fee
644 Permit Issuance one time fee for each plumbing permit issued) 0.32 $34
645 Stand Alone Plumbing Plan Check 1.00 $105
646 For each plumbing fxture or trap or set of fixtures on trap(including water, drainage piping,
and backfiow protection therefor) 0.75 $79
647 For each building sewer 0.75 $79
648 Rainwater systems per drain(inside building) 0.75 $79
648 Underground utilities (sewer, storm,water) Exception: Single Family Dwellings 0.75 $79
Resolution No.7536
Exhibit A-Mechanical, Pluming, Electrical
Fee Types-Plumbing continued Time
Estimate Fee
650 For each private sewage disposal system 0.75 $79
651 Water heater(no issuance fee assessed) 0.30 $32
652 For each industrial waste pretreatment interceptor including its trap and vent,excepting
kitchen-type grease interceptors functioning as fixture traps 1.00 $105
653 For installation, alteration,or repair of water piping and/or water-treating equipment, each 1.00 $105
654 For repair or alteration of drainage or vent piping, each fixture 0.75 $79
For each lawn sprinkler system on any one meter, including backflow protection devices
655 therefor 0.75 $79
656 For atmospheric-type vacuum breakers 0.75 $79
657 1 to 5 0.50 $53
658 over 5 (each) 0.25 $26
659 For each backflow protective device other than atmospheric-type vacuum breakers: 0.50 $53
660 For each gas piping system of one to four outlets 1.00 $105
661 For each gas piping system of five or more outlets 0.75 $79
662 Other Plumbing and Gas Inspections(per hour) 1.00 $105
Fee Types -Electrical Time
Estimate Fee
663 permit Issuance (one time fee for each electrical permit issued) 0.32 $34
664 Stand Alone Electrical Plan Check 1.00 $105
665 Swimming pools,therapeutic whirlpools, spas and alterations to existing swimming pools.
Use unit fee schedule for itemized work. 0.75 $79
Temporary power(ea);Temporary power to a permanent location(ea); Temporary service
666 power pole or pedestal including all pole or pedestal-mounted receptacle outlets and
appurtenances(ea) 0.50 $53
667 For a temporary distribution system and temporary lighting and receptacle outlets for
construction sites, decorative light, Christmas tree lots, firework stands, etc. 0.75 $79
Unit Fee Schedule
Receptacle, Switch,and Light Outlets
668 Receptacle, switch, lighting or other outlets at which current is used or controlled, except
services, feeders and meters: First 20 1.00 $105
669 Each Additional 20 Outlets 0.331 35
Resolution No. 7536
Exhibit A- Mechanical, Pluming, Electrical
Fee Types-Electrical Continued Time
Estimate Fee
Lighting Fixtures
670 For lighting fixtures,sockets or other lamp-holding devices First 20 1.00 $105
671 Each Additional Outlet 0.10 $11
672 For pole or platform-mounted lighting fixtures 0.25 $26
673 For theatrical-type lighting fixtures or assemblies 0.50 $53
Residential Appliances
For fixed residential appliances or receptacle outlets for same,including wall-mounted
electric ovens;counter-mounted cooking tops; electrical ranges,self-contained room,
console, or through-wall air conditioners; space heaters;food waste grinders; dishwashers;
674 washing machines;water heaters; clothes dryers or other motor-operated appliances not
exceeding 1 horsepower(HP)in rating each. For other types of air conditioners and
other motor-driven appliances having large electrical rating,see POWER
APPARATUS. 0.75 $79
Non-Residential Appliances
For residential appliances and self-contained factory-wired, non-residential appliances not
exceeding 1 horsepower(HP), kilowatt(K",or kilovolt-ampere(KVA), in rating including
675 medical and dental devices;food, beverage,and ice cream cabinets;illuminated show
cases;drinking fountains; vending machines; laundry machines;or other similar types of
equipment, each. For other types of air conditioners and other motor-driven
appliances having large electrical rating,see POWER APPARATUS 1.50 $158
Power Apparatus
For motors, generators,transformers, rectifiers, synchronous converters, capacitors,
industrial heating, air conditioners and heat pumps, cooking or baking equipment and other
apparatus, as follows: Rating in horsepower(HP), kilowatts(KVV), kilovolt-amperes(KVA),
or kilovolt-amperes-reactive(KVAR):
676 Up to and including 1 0.75 $79
677 Over 1 and not over 10 1.00 $105
678 Over 10 and not over 50 1.25 $132
679 Over 50 and not over 100 1.75 $184
680 Over 100, each 2.25 $237
Panelboards
681 Installation or relocation of panelboard (ea) 1.00 $105
Busways
682 For trolley and plug-in-type busways, each 100 feet or fraction thereof. An additional fee
will be required for lighting fixtures,motors and other appliances that are connected
Ko trolley and plug-in7type busways.No fee is required for portable tools 1.00 $105
Resolution No. 7536
Exhibit A-Mechanical,Pluming, Electrical
Time
Fee Types -Electrical Continued Estimate Fee
Signs,Outline Lighting, and Marquees
683 For signs, outline lighting systems or marquees supplies from one branch circuit,each 0.75 $79
Electrical Services
684 For services of 600 volts or less; up to 1,OOOamperes in rating,each 1.00 $105
685 For services over 600 volts or over 1,000 amperes in rating, each 1.25 $132
Miscellaneous
For electrical apparatus, conduits and conductors for which a permit is required but for
686 which no fee is herein set forth. This fee is not applicable when a fee is paid for one or
more services, outlets,fixtures, appliances,power apparatus, busways,signs or
other equipment. 0.75 $79
687 Other Electrical Inspections (per hour) 1.00 $105
Resolution No.7536
Exhibit A-Mechanical, Pluming, Electrical
Exhibit"B" 1.01
Fee schedule applicable to development projects for which a completed application was filed
with the City on or before January 31, 2093
BUILDING DIVISION
Service Name Fee
1 Plan check microfilm $10+$21page
2 State mandated General Plan review $0.10/sq.ft.
(on new construction or greater than 50%increase in floor area)
3 Building plan checking.......... Repeated plan checks at 50%of cost
4 Building Permits(Currently using 1994 Uniform Administrative Code with
1196 Building Valuation Data)
(a)the Strong-Motion Instrumentation and Seismic Hazards Mapping Fee(pursuant
to California Public Resources Code section 2705)
Group R Occupancies: one to three stories excluding hotels/motels: valuation x$0.0001
All other buildings: valuation x$0.00021
All occupancies-minimum fee: $ .50
(b)the California Health&Safety Cade section 18931.6 buidling permit fee valuation x$0.00004
minimum fee $ 1
5 Paving, permit and inspection
1,000 sq.ft.or less $ 26
1,001 -5,000 sq.ft. $ 31
5,001 -20,000 sq. ft. $ 41
20,001 - 100,000 sq.ft. $ 52
100,001 sq. ft.and over $ 77
6 Certificate of occupancy inspection
Non-Residential $ 88
Single family dwelling $ 31
Multifamily(2-10 units)or Commercial(under 1 acre) $ 62
Multifamily(11+units) or Commercial(1 acre+) $ 186
7 Swimming Pools $ 215
8 Hot tubs or spas $ 96
9 Roof recover
Tile $ 3.05 per sq. ft.
Composition Shingle $ 2.43 per sq. ft.
10 Signs $ 30.99 per sq. ft.
PLANNING DIVISION
Service Name Fee
11 Concept plan $ 6,429
12 Art and Public spaces review $ 1,838
13 Concept plan amendment $ 2,732
14
Specific plan _ $ 6,052
15 Specific plan amendment $ 2,840
16 CUP-new construction $ 5,055
17 CUP-no new construction $ 1,621
18 CUP-time extension $ 155
19 Revised CUP-construction $ 2,339
20 Revised CUP-no construction $ 1,177
21 CUP-daycare home(13+clients) $ 1,787
22 Variance-fence committee $ 413
23 Variance-SFR $ 1,549
24 Variance-comm, multi family $ 2,313
Resolution No.7536-Exhibit B
PLANNING DIVISION Continued
Service Name Fee
25 Variance-parking modification $ 1,312
26 Building moving-main structure $ 1,244
27 Building moving-garage/secondary structure $ 1,167
28 CRA-major>1 acre $ 5,639
29 CRA-minor 1 acre or less $ 4,317
30 CRA-time extension $ 155
31 Minor commission review $ 1,461
32 CRA-revised major $ 4,523
33 CRA-revised minor $ 3,868
34 Parcel map $ 3,769
35 Revised parcel map $ 2,964
36 Reversion to acreage/merger $ 2,076
37 Tentative tract map $ 9,439
38 Revised tentative tract map $ 6,263
39 Subdivision time extension $ 155
40 Lot line adjustment $ 480
41 Certificate of compliance $ 532
42 Negative declaration $ 4,306
43 Environmental project assessment $ 578
44 Residential Development Allocation (RDA) $ 2,184
45 RDA-alteration of approved project $ 444
46 RDA-transfer of development allocation $ 398
47 Home occupation permit-review $ 29
48 Zone Change-commission determination $ 1,725
49 Zone Change-ordinance text amendment $ 2,029
50 Zone Change $ 2,783
51 One sign review $ 506
52 Sign program $ 1,151
53 Flag test $ 1,105
54 Sign review by staff $ 72
55 Sign program amendment $ 620
56 Annual banner permit $ 83
57 Additional banner display $ 52
58 Searchlights $ 98
59 CUP-signs>120 SF $ 1,627
60 Demolition-SFR(>50 yr old) $ 723
61 Demolition-MF,Comm, Indstrl(>50 yr old) $ 713
62 Demolition-accessory bldg (>50 yr old) $ 496
63 Demolition-SFR(<50 yr old) $ 320
64 Demolition-MF,Comm, Indstrl(<50 yr old) $ 330
65 Demolition-accessory bldg(<50 yr old) $ 351
66 Annexation $ 8,474
67 Service plan for annexation $ 1,012
68 Pre annexation agreement $ 1,874
69 Agriculture preserve removal $ 1,787
70 General plan amendment $ 3,723
71 Street vacation $ 2,040
72 Appeal-Various Fees Paid $ 1,601
73 Addendum to planning commission $ 785
74 Continued item by applicant $ 232
75 Verification letter-basic $ 289
76 Verification letter-research $ 516
Resolution No.7536-Exhibit B
PLANNING DIVISION Continued
Service Name Fee
77 Temporary occupancy $ 155
78 News rack impound fee $ 284
79 Development agreement $ 4,461
80 Williamson Act contract removal $ 2,086
81 Socio Economic Study $ 2,386
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
Service Name Fee
82 Environmental Impact Review $ 194
83 Environmental Impact Report Review $ 570
84 Tentative Tract Map $ 586
85 Revised Tract Map $ 293
86 Final Tract Map $ 511
87 Tentative Parcel M_ap_ $ 568
88 Revised Parcel Ma $ 293
89 Final Parcel Map $ 467
90 Conditional Use Permit $ 629
91 Commission Review and Approval $ 611
92 Building Moving Permit $ 502
93 Lot Line Adjustment $ 269
94 Certificate of Compliance $ 166
95 Street Vacation $ 564
96 Subordination Agreement/Lien Release $ 406
97 Building Permit-Residential $ 330
98 Building Permit-Commercial/industrial $ 330
99 Building Permit-Room Addition $ 115
100 Plan Check-Precise Grading-SFR $ 1,399
101 Plan Check-Precise Grading-Subdivision Base Fee $ 1,675
102 Plan Check-Precise Grading-Subdivision Lot fee $ 74 /lot
103 Plan Check-Precise Grading-Subdivision Acre Fee $ 89 /acre
104 Plan Check-SWPPP-SFR $ 1,173
105 Plan Check-SWPPP-Project Base Fee $ 1,175
106 Plan Check-SWPPP-Subdivision Lot Fee $ 91 /lot
107 Plan Check-SWPPP-Subdivision Acre Fee $ 131 /acre
108 WQMP BMP Inspection-Complex Projects $ 680
109 WQMP BMP Inspection-Standard Projects $ 453
110 WQMP BMP Inspection-Basic Projects $ 408
111 Plan Check-Final WQMP-SFR $ 1,009
112 Plan Check-Final WQMP-Project Base Fee $ 762
113 Plan Check-Final WQMP-Subdivision Lot Fee $ 257 /lot
114 Plan Check-Final WQMP-Subdivision Acre Fee $ 134 /acre
115 Plan Check-Parcel Map-Base Fee $ 1,529
116 Plan Check-Parcel Map-Lot Fee $ 84 /lot
117 Plan Check-Parcel Map-Acre Fee $ 84 /acre
118 Plan Check-Tract Map-Base Fee $ 1,413
119 Plan Check-Tract Map-Lot Fee $ 84 /lot
120 Plan Check-Tract Map-Acre Fee $ 84 /acre
121 Plan Check-Street Construction $ 276
122 Plan Check-Storm Drains $ 256
123 Plan Check-Street Lights $ 164
Resolution No. 7536-Exhibit B
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
Service Name Fee
124 Plan Check-Traffic Signals-New Installations $ 887
125 Plan Check-Traffic Signals-Modifications $ 887
126 Plan Check-Street Trees $ 272
127 Plan Check-Signs and Striping $ 262
128Encroachment Permit-Driveway Approach $ 49
_ ___-- ---- -. ------------------------------------
...,__..- -
129 Encroachment Permit-Sidewalk $ 0.09 /sq.ft.
130 Encroachment Permit-Gross Gutter/Spandrel $ 0.58 /sq.ft.
131 Encroachment Permit-Curb and Gutter $ 2.19 /fin.ft.
132 Encroachment Permit-Curb/Berm $ 2.62 /lin.ft.
133 Encroachment Permit-Crushed Aggregate Base $ 0.04 /sq.ft.
134 Encroachment Permit-Asphalt Pavement $ 0.04 /sq,ft.
135 Encroachment Permit-Street Light $ 81
136 Encroachment Permit-Traffic Signal-New $ 2,152
137 Encroachment Permit-Traffic Signal-Modification $ 1,737
138 Encroachment Permit-Reinforced Concrete $ 89 /cu.yd.
139 Encroachment Permit-Storm Drain Pipe $ 8 /lin.ft.
140 Encroachment Permit-Curb Inlet/Outlet Structures $ 67
141 Encroachment Permit-Storm Drain Manhole/Junction Box $ 67
142 Encroachment Permit-Curb Core $ 62
143 Encroachment Permit-Sewer Main $ 0.95 An.ft.
144 Encroachment Permit-Sewer Manhole $ 67
145 Encroachment Permit-Sewer Cleanout $ 134
146 Encroachment Permit-Sewer Lateral $ 67
147 Encroachment Permit-Water Main-Potable $ 1.09 /lin_ft.
148 Encroachment Permit-Water Main-Nan-potable $ 1.09 /lin.ft.
149 Encroachment Permit-Water Service Lateral $ 26
150 Encroachment Permit-Fire Hydrant Assembly $ 67
151 Encroachment Permit-Water Shutdown $ 67
152 Encroachment Permit-Fire Service $ 58
153 Encroachment Permit-Excavation,Trench,Street Cut $ 1.25 /fin.ft.
154 Encroachment Permit-Street Patch $ 0.67 /sq.ft.
155 Encroachment Permit- Processing Fee $ 219
156 Grading Permit-SFR $ 381
157 Grading Permit-Subdivision Base Fee $ 319
158 Grading Permit-Subdivision Lot Fee $ 45 /lot
159 Grading Permit-Subdivision Acre Fee $ 72 /acre
160 Permit-Truck Route $ 67
161 Permit-Wide Load $ 16
162 Permit-Outdoor Dining-New $ 186
163 Permit-Outdoor Dining-Annual Renewal $ 91
164 Permit-Outdoor Display-New $ 186
165 Permit-Outdoor Display-Annual Renewal $ 91
166 Street Name Sign Installation $ 312
167 Stop Sign Installation $ 535
168 NPDES Commercial Inspection-Law Risk $ 57
169 NPDES Commercial Inspection-High Risk $ 347
170 NPDES Commercial Inspection-Medium Risk $ 139
171 NPDES Industrial Inspection-Low Risk $ 63
172 NPDES Industrial Inspection-High Risk $ 382
_., _ _... ._. ----.__.. _.._ -------------
173
---- - --—
173 NPDES Industrial Inspection-Medium Risk $ 174
Resolution No.7536-Exhibit B
FIRE DEPARTMENT
Service Name Fee
PLAN REVIEW
218 Plan review-commercial $ 207
219 Plan review-Multi family $ 62
220 Plan review-other(access,grading, house moving) $ 78
221 Plan review-residential tract $ 78
222 Plan review-single family $ 38
PLAN CHECK
223 Plan check-consultations (hourly fee) $ 207
224 Plan check-fire alarm $ 207
225 Plan check-sprinklers $ 207
226 Plan check-prevention engineering $ 207
227 Plan check-fuel dispensing $ 207
228 Plan check-hood &duct $ 207
229 Plan check-medical gas $ 207
230 Plan check-portables $ 207
231 Plan check-spray booths $ 207
HYDRANT/HYDRO FLOW TEST
290 Hydrant/Hydro Flow Test-Install, 1 tank $ 103
291 Hydrant/Hydro Flow Test-Install,2 tanks $ 207
292 Hydrant/Hydro Flow Test-Install,3 tanks $ 310
293 Hydrant/Hydro Flow Test-Removal, 1 tanks $ 103
294 Hydrant/Hydro Flow Test-Removal, 2 tanks $ 207
295 Hydrant/Hydro Flow Test-Removal, 3 tanks $ 310
293 Admin fee-cost recovery $ 62
297 Flow Test Fire Flow $ 41
Resolution No.7535-Exhibit B