Loading...
HomeMy WebLinkAbout7536_CCv0001.pdf RESOLUTION NO. 7536 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS ESTABLISHING A FEE AND SERVICE CHARGE REVENUE/COST COMPARISON SYSTEM AND THE AMOUNTS OF FEES LEVIED IN CONNECTION WITH THE CITY'S PROVISION OF REGULATIONS, PRODUCTS AND SERVICES, AND RESCINDING RESOLUTION NO. 7501 BE IT RESOLVED by the City Council of the City of Redlands as follows: Section 1. Intent. Pursuant to article XIIIB of the California Constitution, it is the intent of the City Council of the City of Redlands to require the ascertauunent of recovery of costs reasonably borne from fees levied therefor in providing the regulations, products or services hereinafter enumerated in the exhibits to this Resolution. The fee and service charge revenue/cost comparison system established within this Resolution provides a mechanism to ensure that, pursuant to this Resolution, the fees adopted by the City for services rendered do not exceed the reasonable estimated costs for providing the regulations, products or services for which the fees are charged. Accordingly, the City Council, by adoption of this Resolution, adopts the fees described in the attached Exhibit "A". Section 2. CPI Adjustment. The fees referenced within this Resolution shall be increased arnivally by the City's Finance Director, on each July 1, by an amount reasonably equal to the percent change in the Consumer Price Index — All Urban Users (Los Angeles — Anaheim — Riverside) over the prior year. In snaking such adjustments, the Finance Director may round the amount of the increased fee to the nearest dollar for purposes of facilitating efficient payment and collection. Further, the City Manager, or his or her designee, shall undertake periodic reviews of the fees established by this Resolution and provide a written report to the City Council recommending whether such fees should be adjusted to reflect increased costs or efficiencies in the City's provision of regulations,products and services. Section 3. Authority for Administrative Orders. The City Manager is hereby delegated the authority to issue administrative orders establishing fee collection and financial procedures for implementation of this Resolution. All such administrative orders shall be signed by any affected Department Directors and the Finance Director. Section 4. Costs Reasonably Borne. The phrase "costs reasonably borne," as used in this Resolution, consists of: A. All applicable direct costs including, but not limited to, salaries, wages, fringe benefits, services and supplies, operation expenses, contracted services, special supplies and any other direct expense incurred. B. All applicable indirect costs including, but not limited to, building maintenance and operations, equipment maintenance, communication, printing and reproduction, and like expenses when distributed on a rational proration system. -1- L\cclerklResolutionslRes 7500-759917536 Fee Resolution 9 15 15.doc C. Fixed asset recovery expenses, consisting of depreciation of fixed assets and additional fixed asset expense recovery charges calculated on the current estimated cost of replacement, divided by the approximate life expectancy of the fixed asset. A further additional charge to make up the depreciation not previously recovered and reserved in cash also shall be calculated and considered a cost so as to recover such unrecovered depreciation over the remaining life of the asset. D. General overhead, expressed as a percentage, distributing and charging the expenses of the City Council, City Manager, Finance Department, City Clerk, City Treasurer, City Attorney, Human Resources Department and all other staff and support service provided to the entire City organization. E. Departmental overhead, expressed as a percentage, distributing and charging the cost of each department director and his or her supporting expenses as enumerated in the above subsections of this section. F. Debt service costs, consisting of repayment of principal, payment of interest, and trustee fees and administrative expenses for all applicable bonds, certificates of participation, securities issues or loans. Any required coverage factors of added reserves beyond basic debt service costs shall also be considered a cost if required by covenant within any securities, ordinance, resolution, indenture or general law applicable to the City. Section 5. Public Hearing. Pursuant to California Government Code sections 66016 and 66018, or other applicable statutory requirements, the City Clerk has caused public notice to be provided as set out in Governinent Code sections 66016, 66018 and 6062a, and the City Council has received at a regularly scheduled meeting oral and written testimony from staff and members of the public concerning the new and increased fees proposed to be established by this Resolution. The notice, oral and written presentations and public meeting were provided prior to the City Council taking any action on the new and increased fees established by this Resolution. Section 6. Public Data. At least ten (10) days prior to the required public hearing described herein, the City Clerk made available to the public data indicating the cost or estimated cost required to support the fees for which the charges are proposed to be made. The data demonstrates that the new and increased fees established by this Resolution are not taxes; that the amount of the fees are necessary to cover the reasonable costs of the City for the Services for which they are unposed; and the manner in which the costs are allocated to a payor bear a fair and reasonable relationship to the payor's burden on, or benefit received from, the City's governmental activities. Section 7. Public Notice. Notice of the time and place of the public hearing, including a general explanation of the matter to be considered, has been hailed by the City Clerk at least fourteen (1 4) days prior to the public hearing to all interested parties who have filed written requests with the City for mailed notice of meetings relating to new or increased fees. -2- I:1cclerklResolutions\Res 7500-759917536 Fee Resolution 9 15 15.doc Section 8. Actual Costs/Deposits. The actual cost for a regulation, product, service or project is determined by the affected City Department Directors. Initial deposits are determined by the amount of time historically spent by City staff on similar projects. Whenever seventy five percent (75%) of a deposit has been expended and the department detennines that the estimated actual cost of the project or service will exceed the amount deposited, an additional deposit of such estimated excess amounts shall be required. Wlien an additional deposit has been requested, work will be suspended on the project or service when eighty percent (80%) of the deposit previously received has been expended. Section 9. Proposition 26 Determination. The City Council hereby funds and determines that the fees referenced within this Resolution are not taxes as defined in Article XIII C Section 1(e) of the Califoriia Constitution because the fees are either: A. Imposed for a specific benefit conferred or privilege granted directly to the payors, that is not provided to those not charged, and which do not exceed the reasonable costs in the City of conferring the benefit or granting the privilege; B. Imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which do not exceed the reasonable costs to the City of providing the service or product; C. Imposed for the reasonable regulatory costs to the City for issuing licenses and permits, performing investigations, inspections, or audits, and the administrative enforcement and adjudication thereof, D. Imposed for entrance to, or use of, City property; or the purchase, rental or lease of City property;or E. Charges imposed as a condition of property development. Section 10. Prior Resolutions Rescinded. Resolution No. 7501 of the City Council of the City of Redlands relating to fees is hereby rescinded on the effective date of this Resolution. Section 11. CEQA Exemption. The City Council hereby finds and determines that the adoption of this Resolution is exempt from review and under the California Environmental Quality Act ("CEQA") pursuant to Public Resources Code Section 21080(b)(8)(1) and CEQA Guidelines Section 15273 because this Resolution relates to fees and charges for the purpose of meeting the operating expenses of the City. Section 12. Severability. Should any part or portion of this Resolution be rendered or declared invalid by a court of competent jurisdiction, including any of the fees identified in the Exhibit to this Resolution, such invalidation of such part or portion of this Resolution, or of any fee, shall not invalidate the remaining portions hereof, of the remaining fees, and they shall remain in full force and effect. _3_ I:\cclerk\Resolutions\Res 7500-7599\7536 Fee Resolution 9 15 15.doc Section 13. Effective Date. This Resolution and the fees established by this Resolution shall become effective on September 15, 2015 except for new or modified fees which apply to the "filing, accepting, reviewing, approving, or issuance of an application, permit or entitlement to use" for a development project, as defined in Government Code section 66000, which shall become effective sixty (60) days after September 15, 2015. However, notwithstanding the foregoing, any development project for which a complete entitlement application was filed with the City on or before January 31, 2013, and which had not received approval of that entitlement by such date, the fees applicable to such development project entitlement shall be those set forth in Exhibit `B." All other applications, including any subsequent entitlements/permits submitted for development projects are subject to the fees as described in Exhibit "A." For purposes of this Resolution, the words "development project" shall mean an application deemed complete by the City for a tentative subdivision or parcel snap, conditional use perinit, variance or "Commission Review and Approval." ADOPTED, SIGNED AND APPROVED this 15th day of September, 2015. Paul W. Foster, Mayor ATTEST: Sam Irwin, ity Clerk -4- IAcclerMesolutionslRes 7500-7599\7536 Fee Resolution 9 15 15.doc I, Sam Irwin, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof, held on the 15th day of September, 2015, by the following vote: AYES: Councilmembers Harrison, Gilbreath, Barich, James; Mayor Foster NOES: None ABSTAIN: None ABSENT: None Sam Irwin, City Clerk -5- lAcclerk\Resolutions\Res 7500-7599\7536 Fee Resolution 9 15 15.doc Resolution No.7536 Color Legend: Exhibit A-Fees T,3i -No Change -Reduction Fee Year 3 Fee Year 3 (effective as of 1/112016) (effective as of at 04/2112015 11112015)at 09115/2015 PLANNING DIVISION Resolution No.75iD1 includes.5111 CPI adjustment Service Name R"­ry Fee Year 3 at 0412112015 Fee Year 3(09115116) 1 Cancept plan.._...-----------------............... 0044t463, 9,510 2 Concept plan amendment 100% 3,B52 3,871 3 Specific plain 1001A 8945 8,889 -4-specific plan _100% 4 026 ------- 4,046 5 CUP-new construction 100% 6,104 6,135 ............. 6 CUP-no new construction 2,031 2,041 7 CUP-time extension 100% 335 337 8 Revised CUP-construction 1007 2,867 2,.881--, 9 Revised CUP-no construction 1001% 1,446 1,463 10 CUP-daycare home(13+clients) 1007 2,205 2 216 11 Variance-fence committee 100% 575 578 12 Variance-SFR 100% 2,523 2,536 13 Vanance-comm,multi family 1o0 2,618 2,832 14 Variance-parking modilfcation 1007[ 2,072 2,082 15 Building moving-main structure 1,679' 1,687 16 Building moving-garagetsecondary structure 100%, 1,590 1,598 17 CRA-majorjnl acre 100%i 6,879 6,913 18 CRA-minor 1 acre or less 100%1 5,256 5,262 19 ORA-time extension 101 276 277 20 Mine - __E 1 _commission review lomi 1,802 1 All 21 CRA revised major 100 5,502 5,530 22 CRA-revised minor t00%:: 4,744 4,768 23 Parcel map 100W 4,586 4,611 24 Revised parcel ma r 100%;! 3,619 3,637 25 Reversion to_2creagelmerger t00%: 2,55B 2,571 26 Tentative tract map 1 oo%s 11,361 11,418 27 Revised tentative tract map 100%! 7,580 7,618 28 Subdivision time extension 100%, 359 361 29 Lot line adjustment 1007, 642645 .......... 30 Certificate of compliance 100% 682 585 31 Negative declaration 100% 5,184 5,210 32 Environmental project assessment 100% 734 738- 33 Residential Development Allocation 100% 3,507 3,525 34 Residential Development Allocation(RDA)-alteration of approved_y!ld Rrqjec[ fl036 554 557 35 Residential transfer ofdevelopment_allocation 1001A 541 ------ 544 36 Home occupation permit-review .-. 1130% 46 6, . ................. 37 Temporary Events 100% 159 160 3B Zone Change-commission determination100 2,132 2,143 39 Zone Change-ordinance text amendment t00%- 2.685 2,698 40 Zone Change 100% 3,454 3,471 41 One sign 1007 619 622 4_2_S1qflTHQ_9n_M fo041 14fl2 1,409 43 Flag est 10* 1345 1,362 44 Sign review by staff WOW 126 127 45 Sign:pragram amendment itio%li 754 758 46 Arinu�jj��_ 22 123 47 Additional ban r bq -t00%! 62 '62 48 Searchlights 122 123 49 CUP-signs�120SF 100%! 2,4262,438 ------------- 50 Demolition>50 Er old-Histone C7es mated SFR 100W 871 875 51 Demolition-�Otr,qkiHistone io a n,indstri 100;6. 875 52 Demolition>50yr.old Hrstoriepe i�9�Ialed_A_ccessory Building .. ........... 610 53 Demolition>50 yr,old-Single Family Zones 100%� 587 590 54 Demolition>50 yr.old-muhi-ramity,Comnjrcial&Industrial t00%! 621 624 55 Demolition>50 yr.old-Accessory Building 513 516 56 Annexation 6,430 6,462 57 SerAre_Rlan for annexation 100% 1,248 1,254 58 Pre annexation agreement 100% 2,332 2,344 _59_?Agriculture rjpreserve removal 1007 2,296 2,307 60 General plan amendment 100% 5,519 5,547 61 Street vacation 100% 2,367 2,379 2 App eat-Various Fees Paid 1001% 2,050 --2,060 63 -"Addendum to planning commission TZ 1,081 1,056 64 Continued item by applicant 336 338 65 Verification letter-basic 10071 349 351 66 Verification letter-research 100%ii 620 67 TenlRorwyoccurpancy_ 1B _,._.-183mm 7536 Exhibit A-B-Amended Fees 9 15,15 PLANNING DIVISION Continued Service Name R...ccivery Fee Year 3 at 412112015 Fee Year 3(09115115) 68 News rack impound fee 100°0, 342 344 69 Deyelopmentagrsement 100%, 5,555 6,583 70 Williamson Act contract removal 1001A' 2,546 2,559 71 Socio Economic Stud 100% 2,969 2 984 72 Preliminary Review-over one acre' 100 k° 390, 392 73 Preliminary Review-one acre ear fess 100`0. 302 304 74 Minor Certificate of Appropriateness 100'A, 323 325 75 Certificate of Appropriateness 100°5 559 562 76 Demolition Permit<50 yr.old-Single Farn Zones 100W 351 353 77 Demolition Permit c 50 yr-old-Minty-Family Com Ta cral&Indusinai 100 6 356 368 -- _ ._.. ._.,._.. ._... -- ---- 78 Demolition Perrnit<50 yr,old-Accessory Burpdrng a„r 100/a. 390 392 79 Mills Act 1 oo f 437 439 MUNICIPAL UTILITIES AND ENGINEERING'DEPARTMENT Service Name %Recovery Fee Year 3 at 412112015 Fee Year'3(09/15815) 50 Env�ronmental.Impact Review.. 100%� 356 _- 358 81 Environmental impact Report Review 00°6 1,689 1,697 82 Tentative Tract Map 100% 1,335 1,342 83 Revised Tract Map 190% 1,335< 1,342 84 Final Tract Map 100 .2,334 2,346 85 Tentative Parcel Map 1009m 1,335 1,342 86 Revised Parcel Map 10036 1,717 1,726 87 Final Parcel Map 100% 2,099 2,109 68 Easement/Dedication Review 100% 673 678 89 Conditional Use Permit 100% 969 974 90 Commission Review and Approval 100% 969 974 91 Building Moving Permit 100% 218 213 92 Lot Lune Adjustment 100% 627 631 93 Certificate of Compliance 100% 278: 279 94 Street Vacation 100°h 1,023 1,028 95 Subordination AgreemenWen Release 100% 651 654 56 Building Permit_Residential 100%!' 671 ------674 97 Building Permit Residential in a mapped development under a common builder 98 Building Permit•Commercial/industrial 10096', 969 974 99 Building Permit-Room Addition _._-....._. _ _ ..._:_ 100ro', 125 126 100 Building Pe nit-Cammero a4 T1 -- -- 100%1 _ 125 126_ 101 Plan Check-Grading Base Fee/0-500 c:y; 100% 460 462 102 Pan Cheek-Grading,each addtl 500 cy or fraction thereof,501-5,400 c; 100 h 64 114 103 Plan Check-Grading,each addtl 5,000 cy ar fraction thereof,5,001-50,000 cy mm 100%, 74 9, y y 83 8 '.104 Plan Check-Gradin each audit 14;004 c or frac#ion#hereof 54 001-106,044 0. , 100 J i 105 Plan Check-Grading,each admi 14,000 cy or frac#won thereo# 100 001 200,400 cy.m to04sl 10 9`Gk 106 Plan Check-Grading,s2p0,041 c.y_each_add 40,000 by or fraction thereof 1009b, 6 _ _. .. 107 Plan Check-Erasion Control-SFR 10®°6 528 531 108 Plan Check-Erosion Control Prdjeel_.Base Fee 100%` 1,002 -1007 109 Plan Check-SWPPP-SFR 100%1 978 983 X110 Plan Check-SWPPP-Project Base Fee -. . 100:1.. 1,293 1.299:. 311 Plan Check-SWPPP-Subdivision Lot.Fee 1001A 135 !lot 136 Ilof 112 Plan Check-SWPPP-Subdivision Acre Fee 140% 135 laces 136 tacre 113 WQMP BMP Inspection-Complex Projects 100% 695 698 114 WQMP BMP Inspection-Standard Projects _-- 1fl4"/ 537 540 _,. 115 VVQMP BMP Inspection-Basic Project too,/. 380 382 116 Plan Check-Preliminary WQMP-SFR .T_ 100% 675 678 m 117 Plan Check Preliminary WQMP-Project Base Fee' 10036 753 757 118 Plan Check-PreliminaryWQMP-Subdsyssirrh Fee 1709. 186 /Irn 187 lint 119 Plan Check-Preliminary jQMP ScbdevrsyanAcreFee 10ob6. 186 lace 187 Isere 120 Plan Chock-FinaI 1N01MP-SFR- 100%h 978 9,83, 121 Plan Check-Final WQMP-Pmjoct Base dee 10096; 1,293 1,299 122 Plan Check-Final WOMP-Subdivision Lot Fee 100o-,&': 135 flat 136 l ct 123 Plan Check-Final WQMP-Subdivision Acre Fee - too, ; 135 /acre 136 /acre 124 Plan Check-Parcel Map-Base l=ee 10fl96 3,251 3,267 125 Plan Check-Parcel Map-_Lot Foo_._. ......__ t00%1 156 /lot 157 flat 1'26 Plan Check-Marcel Map-AcTe Its 100°k', 29 /acre '29 /acre 127 Plan Check-Tract MapHPse Fee t00%:! 3,722 3,741 128 PlanCheck Tract Map-,Lot Fee 100% 93 list 93 !lot 129 Plan Check-Tract Map=Acre Fee 100% 29 /acre 2 /acre 130 Plan Check Street Construction Base fee 100% 1,300 1,307 131 Plan Check-Street Construction-per sheet 100,61 519 /street 522 /sheet 132 Plan Check-Storm Brains•Base fee 0;6; 750 754- _ 10_ 133 Plan Check-Storm Drains-persheat 100%F- 304 /sheet 302 !sheet 134 Plan Check-Hydrology Study 400% 1,343 1,350 135 PfanCheck-Street Lights Base fee 100% 604 607 136 Plan Check-Street Lights-per sheet 100% 342 /sheet _- 344 (sheet 137 Pian Check-Sewer Construction-Base fes 10096 750 754 138 Plan Check.Sewer Construction per sheet 140 4 300 /sheet 302 /sheet 2 7636 ExhibitA-B-Amended Fees 9 15.15 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued Service Name %Recovery Fee Year:3 at 4/2112015 Fee Year:3(0115115) 13� Plan Check-Water CoflStRICtion-Base fee 100%j 750 754 ................... 140 Plan Check-Water 100%j 300 !sheet 302 /sheet 141 Plan Check-Traffic_Sipals-New Installations 100%j 1,536 12544- 142 Plan Check-Traffic 1,053 143 Plan Check-Street Trees.-Base fe 1001 500 503 144 Plan Check-Street Trees-per sheet .......... 100% 250 /sheet 251 /sheet 145 Plan Check-Signs and Striping-Base fac­ 1001% 750 754 145 Plan Check-Signs and Striping—per per sheet. 1001A 300 Isheel 302 /sheet 147 Encroachment Permit-D6vewayApProach-has 100% 79 '19 148 Encroachment Permit-Dnveway Approach-_each ................ 100% 39 learn 39.teach 149 Encroachment Permit-Sidewalk-base 100% 79 7o 150 Encroachment Permit-Sidewalk-per sq.foot up to 300 SF 0,40 fsq ft, JOAO'/sq.ft. 151 Encroachment Permit-Sidewalk-each ard'lonal Sq r foot over 300 SF 0.10 Isq.ft ft, 152 Encro e 100% 79 /each 153 Encroachment Permit-Cross GuttenSpandrel-per sq,foot 100% 0.79 lsq ft lsq,I'L 154 Encroachment Permit-Curb and Gutter-base 100% 79 155 Encroachment Permit-Curb and Gutter-per linear foot up to 50 LF 3.00 /tin,ft, 3114 tlin.ft 156 Encroachment Permit-Curb and Gutter-each adtlitional LF up to 200 LF 1,50 Ififl.ft. 1,56 Mo.ft. 157 Encroachment Permit-Curb and Gutter-each additional LF over 200 LF 0.75 Am.it 07S,4in.ft. 158 Encroachment Permit Curb/Berm -base t00%— 79 159 Encroachment Permit-Curb I Berm at Imear 2,00 Am.ft, 2,00 Ain.ft. not up to 50 LF 160 Encroachment Permit-Curb/Berm each additional LF up to 200 LF 1 00 Aln.it. "Ain.ft. 161 Encroachment Permit-Curb I Berm each additional LF over 200 LF 0 50 Ain.ftCS()'Ain ft. 162 Enrro base too%, 79 163 Encroachment Permit-Crushed Aggregate Base Pee sq. 0,08 /sq.q- '008!/sq,ft, 164 Encroachment Permit-Asphalt Pavement-base 100%i 79 165 Encroachment Permit-Asphalt Pavement persq.Foot100%�, 0.08 /sq.ft, /sq,ft 166 Encroachment Permit-Street Light-base t00%! 79 167 Encroachment Permit-Street Light -each icio%� 39 /each 168 Encroachment Permit-Traffic Signal-New-base IDOW 79 169 Encroachment Permft-Traffic Signal-New-each 100* 2,335 /each 2,347 leach 170 Encroachment Permit-Traffic Signal-Modification-base 100°F 79 171 Encroachment Permit-Traffic,Signal-Modification -each 1,830 leach 1,839 leach 172 Encroachment Permit-Reinforced Concrete base 79 173 Error cubic yd, 100%l 118 Ictibicyd. 119 /cubic 174 Encroachment Permit-Storm Drain Pipe-base 1001 79 175 Encroachment linear foot u tolOOLF 4.74 /fin.ft. 416 ifin.fto . 176 Encroachment Permit-Storm Drain Pipe-each additional LF- 0.75 Ain.ft. '0,,75 Air.ft, 177 Encroachment Permit-Curb I nlet/Outlet Structures-base 100%! 79 178 Encroachment Permit-Curb Tnlet/Outlet Structures-eac 100%� 39 /each 39-/each 179 Encroachment Permit-Storm Drain Manhole/Junction Box-base 79 7w. 0' 180 Encroachment Permit-Storm Drain Manhole/Junction Box-earn leach SO,/each 181 Encroachment Permit-Curb Care-base 1000%1 79 70, 182 Encroachment Permit-Curb Gore-each 39 leach 1001/0 /each 183 Encroachment Permit-Sewer Main-base 100% 79 79 184 Encroachment Permit-Sewer Main-PerlinearfootuptaSOLF 1,56 Ainfl 148 Ain,ft. 185 Encroachment Permit-Sewer Main-each additional LF O 25 Ain:ft, flin,'ft. 186 Encroachment Permit-Sewer Manhole base 100% 79 78 187 Encroachment Permit-Sewer Manhole each 100% 39 /each /each 188 Encroachment Permit-Sewer Cleanout-base 1005% 79 79 189 Encroachment Permit-Sewer Clearrout-each 100%1 39 leach /each 190 Encroachment Permit-Sewer Lateral-;base 00ea 79 191 Encroachment Permit-Sewer Lateral-each 10011 39 leach 44,4each 192 Encroachment Permit-Water Main-Potable-base 100%, 79 79 193 Encroachment Permit-Water Main-Potable-per imearfoot upm 50 LF^m 1Z8 Ain,ft, Ain.ft. 194 Encroachment I LF over 50 LF0.26 Ain.ft. . rt -777 OAft, in.7777 �15 195 Encroachment Permit-Water Main-Non-Potable-base too%: 79 79 1",56 Ain.fl. 196 mm- E ncroach me nt P ermit-Water M at n-N on-Po(a bl a per Ii nee r foot up to 13�Lf 1 58 Ain.ft, 197 Encroachment Permit-Water Main-Non-Potable-each additional LF over 50 LF 0,25 Ain,ft, ft, 198 Encroachment Pernht-Water Service Lateral-base 1004% 79 79' 3V leach 199 Encroachment Permit-Water Service Lateral-each t00%: 39 /earn 111----1-1—------------ 200 Encroachment Permit-Fire Hydrant Assembly-base too%: 79 201 Encroachment Permit-Fire Hydrant Assembly-each I On. 39 leach 39'�leach 202 Encroachment Permit-Water Shutdown-base 100%� 79 79 203 Encroachment Permit-Water Shutdown-each 100% 39 /Loch c 9 leach 204 Enc yLe erroLit-Fire Service-base- 100% 79 19 205 Encroachment Permit-Fire Service-each 10000 39 leach 14 /each 206 Encroachment Permit-Excavation,Trench,Street Cut-base 100% 79 207 Encroachment Permit-Excavation,Trench,Street Cut-per�nearfqcfup_to5OLF 1 58 ffin, Ain ft, 208 Encroachment Permit-Excavation,Trench,Street Cut-each additional LF over 50 LF 0,25 llin,ft t72 llin.ft. 209 Encroachment Permit-Street Patch-base 1001/0 79 7t 210 Encroachment Permit-Streot-Patcih-per sg,,,!". p to 200 SF 0.15 lsq,it "0:16 lsgmft 211 Encroachment Permit-Street Patch-each additional SF—over-200 BE 0,12"/sq-ft 012 /sq,it :212Encroachment Permit-PracessT Fee 1001 308 310 3 7536 ExhibitA-B-Amended Fees 91515 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued Service Name. R­auery- Fee Year:3 at 4121'.12.915 Fee Year (09115115) 213 Encroachment Permit-SIA/PIA Projects 1%of bond amount 11%of band ammint _ — -- — 214 GradFitg Permit,Base Feel 0-500 o.y. 10406 520, 532 215 Grayling Permit,each arkitt 2,000 cy or fraction thereof,501-10, CIII c.y 100 B4 04 216 Grading Permit,each addtt5,000 cy or fraction thereof,16,001 109000[3 cy. 160°til 77 77 217 Granting Permit each addtl 10,000 by or fraction thereof,100,001-200,000 c.y} 100% 10 107 218 Grading Permit,>200,D01 c y.each addtl 10,000 c:y orfractkon thereof __- 100'yo 7 7 _........ . — nw. 219 Permit-Truck.Route(upfci_.5days). 100% 08 220 Permik Wide Load 100oe 68 68 221 Permit-Outdoor[lining-New 1030% 277 _ 778 222 Permit Outdoor Dining Annual Renewal 100% 150 151 223 Permit Outdoor Display-New 100% 277 278 224 PermitOutdoorDisplay-Annual Renewal 109% 1550 151 225 Pennil-Parklet 160 2717 271 ..._ ....._ ....... _. 226 _NPS Program Foe Industr al-High' I D0%1 155 157 227 NPDES Program Fee,Industrial-Medium 1001% 78 228 NPDES Program Pee,Industrial Law 100% 32 32, 229 NPDES Program Fee,Commercial High 100°/ 056 057 ... 230 NPD Program Fee,Commercial Medium 100%; 78 ?5 231 NPDES Program Fee,Commercial Low 100* ... _'__32 _.�. 32 232 SWPPP preliminary check 100 tfl, 2,258 2,269 233 SWPPP final check erosion control plain 100%: 2 25B . ------_ __. ^^ 2,269 -- --.., 234 VVQMP preliminary check 100%! 2,258 __.-. . .. - 2,263 235 WOMP final check erosion plan 100%1 2,258 2,269 239 NPDES Inspection.Construction-High—Non-rainy seasonpriority once low 482 464: 237 NP]ES lnspeotion,Construction-High- Rales season.priority monthly 100%!! 482; 484 P .y I?_tY -._.__. 238 NPDES Ins action,Construction-Medium-Nan-_rainy saason, non onee 100%: 245 241 239 NPDES Inspection,Construction Medium- Rainy season priority antllly 100W 240 241 240 NPDES Inspection,Construction-Loan-Nan-rainy,season priority oncemmmMmF 100%' 240 241 X241 NPDES Inspection,Construction Low- Rainy season,prkority monthly 100%[ 240 - 241 242 NPDES Inspection,Construction-Out of Compliance Si(tc weekly, 100% 482 484 243 NPDES Testing-Chlorination RemovalDischarge Testing,per pipeline 100%s 121 122 244 NPDES Test N-pH testing per discharge per pipeline 100° 122 123 245 Public ImprovemenC Agreement�m P40/ 954 559 _..... 246 Landscape Covenant 00 836 B40 _m 247 Landscape Covenantw1 Caltrans Agreement 100% 1,073 1,0378 m. 248 Water Efficient Landscape Plan 1110. 758 762 249 Plan research records request Per hone 100%1 103 104 250 TraMCommission Request 100% - - 251 Street Name Sign Installation 100% 538 541 252 Skop Sign Installation, 100% 655 658 QUALITY OF LIFE DEPARTMENT Service Name P Rec®very Fee Year 3 at 412112015 Fee Year 3(99115115) 253 Vacant abandpned property regishaticn 10050~ 85 8 P .....,.__- %" 1000k 24 '. :254 Air orf gate card-ne 255 Airport gate bard-renewal 100.6 15 $5" 256 Street Tree Permit Street Tree Removal' S0°fi78 f ' Tel 257 Street Tree Permit-Street Tree Trimming 50✓0 65 259 Street Tree Permit:-Street Tree Planting50°.x"I 75 75 259 Street Tree Permit-Street Tree Relocation 50%11127 126 .. 260 Street Tree Permit PracessinRfte...._,.m__ _ 50ro,! ...m --.... 36 261 Park Reservation-Prospect Park Sign Orb 57 57'. _.. 262 Rork Reservation Redlands Bowl 505;: 110 111 263 Park Reservation-Sentell Theatre 50°Jm 110 111 264 Park Reservation-Sylvan Park 50%1 110 111 265 Park Reservation-Other Parks 50%I 86 EFi 266 Rental Dwelling Permit, 1 acre 100% 77 T7 267 Recital Dwelling Permit,1-3 acres 300% 90 905 268 Rental dwelling Permit,3:91-5 acres 100% 100 1(71 269 Rental Dwelling Permit,>5.01 acres 100% 110 111 270 Rental Dwelling_Permit-Reinspection 100% 39 39 POLICE DEPARTMENT Service Name. is Recoro M _.-. Fee Year 3 at 412112415 Fee Year 3(49115115) 271 Film Permits 100%3 406 408 .:272 Background Checks 100°,6'; - _ ... ... 21 ... ,-._...,,..-..,... .,._.:..,..,,..,�..�.:,.�:,.. .21 273 False alarm response 100%:i 193 194 274 Bicycle license 4740 5 5 275 CCW permit _Statute i 100- iCiO 276 CCW permit renewal Statute 25 25 277 Fenge print rolling 100-A: 25 LL S 278 Miscellaneous-permits 100%, 102 103 279 Miscellaneous-photos' 100-A 61 6t 280 Repossession 100% 19: ', d 7536 Exhibit A-B-A,mended Fees 9.15.15 POLICE DEPARTMENTcontinued Service Name 'A Recovery Fee Year 3 at 41211261 a Fee Year 3(49115(15) 281 Vehirle impound' all others 100°I 235 236 282 Vehicle impound DUI 100( 235 236 283 Visa Clearanre 100% 11 11" 284 Gat adoption 6l 7 7 _265 pag ad®pt�csn,.. _ 10% -- ----- 12., $ _ ,. - 286 Animal boarding _16°' __-. __._.._ 10 60 267 Cal release-owner 33% 20 rt 2 288 Gal release-owner.<4 months 16°,W 10 20" 269 Dog release-owner 49W 30 30 290 Dog release-owner, 4 months' 321/.: 29 291 Shelter apprehension,cat- 19e10 10 f9 p 292 Shelter apprehension,livestock-Iarg_e 76%; 40 4Y1 293 Shelter apprehension,livestock medium _ 57°1! ....— 31) 294 Shelter apprehension,livestock-small 3$0/0 295 Shelter apprehension,unaltered-1st Statute j35 35 296 Shelter apprehension,unaltered-2nd statute 3 50 511' M�. 297 Shelter apprehension,unaltered-3rd Statute 3 1011tq w 298 Trap^rentals 7 00 A 58' 56 .n 299 Clop Vaccine 1001 23 23 300 Cat Vaccine --- 65% 15 1 301 MassraPiso perm[[: 1R0% 172 103 302 ,302 Massage Therapy Business Owner permit-initial 1004'b 380 382 303 Massage Therapy Business Cwner permit-renewal 00v6 195, _ -- 196 304 Solicitor permit 100% 102 103 305 Taxi Driver permit(3 yr.permit) 100% 287 288 306 Tow Truck Dever permit 10095 74 74 307 Adult Oriented Business penmt 1001 _ 338 � 340 308 Adult Emertainer permit -... 100% 102 103 309 Remote Bingo 100" 545 548 310 Gat-Spay _ _. 57% 28 -28' 311 Cat-Neuter 85% 28 312 Dog-Spay (up to 30 Ibs) 78%1 51 m 313 pD9—Spay (31_50 lbs), 56°fid 314 Dog-Spay (51 to 75 lbs) m 51% 51 51 315 Dog-Spay (76-1001bs) 37`: 51 51 316 Dog,-Neuter(up to 30 Ins) 93%, 51 i 317 Dog Neuter 131-50 lbs) 63%k 51 5t 318 po e Nouter 5i to 75 Ibs 55% 319 Dog-Neuter (76 100 Ibs} 44%1: 51 51 320 Cost Recovery-Delinquent Parking Citations 1031 .nae Fttteerlercent 5% oftlle"attlottntoflherCel3rk t98rs1 kaki cittroh krs4e�t(sltars<;: FERE DEPARTMENT Service Name: %Recovery Fee Year 3 at 412112615 Fee Year 3(09115115) 321 False alarm-residential 100% 144 145 322 False alarm-commercial 100%1 256 259 PLAN REVIEW 323 Plan review-camntefdal: 100°r;1 267 258: 324 Plan review-Multi family 100% 271 _ 272 325 Plan review-other(accessigrading,house moving) 10007 215 216 326 Plan review-residential tract 100% 360 362 327 Plan review-single family 100% 276 277 328 Plan review-consultationsjhoudy fee) 100% 163 164 329 Plan review-prevention engineering 10096 274275 330 Plan review-fuel dispensing 18095 296 299 331 Plan review-hood&duct 100% 262 263 332 Plan review-medical gas 10095 -- 262 263 _ _ _. 333 Ptan review-portables 10fl°R 298 m _._ _ 299 334 Plan review-spray booths i ofl la„; 262 263 STATE MANDATED FIRE MARSHALL INSPS 335 Ins care facilities/churches 100",4x' 230 231 o .:336 Ins re school I school tda care 1001x .r ... �_ Insp-P y _...._._ _ - --I _ ...,. 195 .,,.. _ .__,...,..... r_ 196:, 337 Insp-high rise 100%! 395 397 338 Insp...-daycare[`foster care(6 or less)., 100 A 159_. . .- _..,. ...... _._ 160. PREVENTION INSPECTIONS 339 Insp aprtmntfcandD 1-10 uriis 100°6', 183 184 340 Insp-apdmnVcondo 11-30 units 100% 219 220 341 Insp-aprimnlfcondo 31-50 units 100%, 225 227 842 Insp-aprtmntfcondo 57-75 units 100W 298 299 343 Insp-aprtmnticondo 75-140 units 100% 298 299 .:344 Insp.:-aprtmntdeondo 101+units.. ., 1001' 371 373... 345 Insp”oart of occupancy ordinary hazard 1001 166 167 346 Insp cert of occupancy high hazard 100% 202 203 347 Insp:-commercial B-2 100% 146 147. 348 Insp-commercial Xmas tree 100% 146147' 5 7536 Exhibit A-B-:Amended Fees 9 15.15 FIRE DEPARTMENT continued Service Name %R-overy Fee Year at 4/2112015 Fee Year (09/15115) 349 Insp-commercial high hazard 100V 202 203 350 Insp-motels 1-20 units 100%1 154 155 351 Insp--motels 21-40 units 100%s 190 191 352 Insp-motels 41-50 units 106°k, 190191 _- 353 Insp.-motels 51+units 354 Insp-commercial occupancy re Inspection ENGINE COMPANY INSPECTIONS µ355 Engird company insp•ordinary hazard 100 J 134 135 356 Engine company;insp high hazard 100%6 168 164 357 Aircraft repair hangar permit- 100W 22B 227 358 Aircraft refueling vehicle permit 100%` 23B 239 359 Compressed gasiLPG permit 100! 238 239 360 Covered mail permit 100W 290 299 361 Dry cleaning permit 100% 226 227 362 C1ust producing permit 100%/ 262 263 363 Explosives permit 100%i 322; 324 364 Fruit ripening permit100%1 298 299 365 Flammablelcombustible liquid permit10 Y 10 250 251 366 Hazardous I toxic/corrosive permit _----. --._ 10D%1: 250 251 r - - 367 High:piled combustible permit 100% 2$8 287 368 Junkyard permit -- _ 106°k', 395 397 369 Lumberyard permit 100% 322 324 _----- _.._.... ._. 370 Medical gas system permit t00% 262 263 371 Pesticides permit 100%11178 179 372 Pipeline-excavation/operation permit 100%1 256251 as permit .16636 373 Poison _ ',,_. 9 P 250 251 374 Radioactive material permit. 100°k 250 251. 375 Refrigeration equip/permit 100% 250 251' 376 Repair garage permit 100% 250 251 _ .� ..-..._.. ...,._.. ......__. ......... ..._... ...�._.... ... ... 377 Spray booth permit 100W 250 251 378 Tanks permit 100%l 250 251' 379 Welding/cutting permit 100%1 250: 251 3B0 Bonfire permit: 100%. 178 179 _......381 Carnival!fair pe .�.............rmit 100%j 250 251... 382 Fireworks permit'' 100% 743. 747... 383 Open flame permit 1DO% 226 227 384 Parade float permit 100% 154 155 385 Assembly 1000+persons w/stage 100% 322 324 386 Assembly<1000 persons wl stage 100% 322 324 387 Assembly 300+persons no stage 100% 322 324 388 Assembly 50-299 persons no stage 100% 226 227 389 Tents/canopies 100% 226 227 WEED ABATEMENT 390 Weed abatement admin 100% 104 155 391 Weed abatement disking" 100% 21 '�^1 392 Weed abatement mowing_lot'* __.. 100%j 21 2`1 393 Weed abatement hand woe* 1000 ; 21 21 394 Weed abatement re-inspection 100% 40 40 HYDPANTIHYDRQ FLQW TEST ....... —— 395 Hydrant/Hydro Flow Test=Install,I tank 100°6 310 312 396 Hydrant/Hydro 2tanks 100%''_. _..,.... .___ y 383 385 397 Hy rant/Hydro Flow Test-Install 3 tanks too%: 450 1457 _ — - -- — -.._...... _— 398 Hydrant/Hydro Flow Test-Removal,i tanks 100W 310 312 39g HydrantJHydro Flow Test-Removal,2 tanks 100%', 383 — 385 400 Hydrant/Hydro Flow Test-Removal,3 tanks 100;`0, 455 457 401 Admin fee-cost recovery 100%:: 94 44, — m . w . 402 Flow Test Fire Flow 100% 238 239 403 Miscellaneous Inspection/Permit Hourly 100",k, 136 /Hourly 137 /Hourly 404 Alarm System Plan Review,Sprinkler monitoring only 100% 144 145 405 Alarm System Plan Review„10 or less initiating devices 100%j 289 290 406 Alarm System Plan Review,11-20 initiating device 100% 433 435 407 Alarm System Plan Review,20 or more devices 100% 578 581 408 Sprinkler System Plan Review.25 heads or less 100°J 289 290 409 Sprinkler System Plan Review,26-99 heads t00% 433 435 _v... ._...,. ....... _,_.. -- 410 Sprinkler System Plan Review,100 heads or more 100% 578 581 411 Smoke Control System Plan Review,review of rational analysis 100!0 155 1,161 412 Smoke Control System Plan Review,Design Testing 100,5 1,155 1,161 413 Inspection 100,000 sq,it or less 100%1 144 145 414 Inspection 100 000 500,000 sq,it 1003x`, 217 218 6 7536 ExhibitA-B:-Amended Fees 9.15.15: FIRE DEPARTMENT continued Service Name %Recovery Fee Year 3 at 412112015 Fee Year 3(09115115) 415 Inspection 500,001 sq.It and above 100°k 289 P90 416 Const-Automatic fire-extinguishing system,25 heads or less 100°k 289 290 417 Const-Automatic fire-extinguishing system,26-99 heads 400°k 433 435 418 Const-Automatic fire-extinguishing system,100 heads or more 100% 578 581 419 Const-Kitchen Hood and Duct 1009A 289 290 420 Const-Clean Agent System 100% 289 290 421 Const-Battery Systems 100% 289 290 422 Const-Compressed Gases 100% 289 290 423 Const-Cryogenic fluids i00°6 289 290 424 Const-Alarm and defection systems/equip,sprinklers monitoring only 100% 144 145 425 Const-Alarm and detection systemslequip,10 or less initiating devices 100% 289 290 426 Const-Alarm and detection systems/equip.11-20 initialing devices 100% 578 581 427 Const-Alarm and detection systemslequip,20 or more devices 100% 867 871 428 Const-Fire pumps and related equipment 100% 578 581 429 Const-Flammable and combustible liquids 100% 289 290 430 Const-Hazardous Materials 100% 578 581 431 Const-Industrial ovens 100% 289 290 432 Const-LP-gas i00% 289 290 433 Const-Private fire hydrants f00°k 433 435 434 Const-Spraying or dipping 100% 433 435 435 Const-Standpipe systems 100% 433 435 436 Const-Temporary membrane structures and tents 100% 144 145 ` Includes 3 hours standby " The fee listed is the admninistrative processing fee. Any vendor charges will be added to the processing amount. RECREATION DIVISION Service Name Fee Year 3 at 412112015 Fee Year 3(09115115) FIELD RENTAL RATES Rental Fields: Texonia Park(Texas Street and Lugonia Ave.) Community Park(Church Street and San Bernardino Ave.) Brookside Park(Brookside Avenue) Gratton Park(Independence Avenue) Clement School Ball Fields and Tennis Courts*(Pennsylvania Avenue) Orangewood School.(Stuart Avenue) 'Joint Use Agreement with Redlands Unified School District User Groups: Group 1: City of Redlands—City operated recreation programs and activities.This group receives first priority for field use and allocations.No rental fee. Group 2: Organized Youth Sports—Registered non-profit or charitable group with registered non-profit status with the State of California,complete with tax exempt identification number,offering organized youth sports.All participants shall be under 18 years of age.Fees noted below. Group 3: Adult Sports,CommunitylBusiness Groups and/or individuals—League or organized sports or activities for participants 18 years of age or over;tournaments:and other activities requiring field reservations. Fees noted below. Rental Rates: 437 GROUP 2 Field Use S 101 hour per field S 10/hour per field Field Lighting 5 151 hour S 15/hour 438 GROUP 3 Field Use 5201 hour per field $201 hour per field Field Lighting S 301 hour S 301 hour Field Lighting at Crafton Park and Community Park is paid directly to utility provider by user. 439 Miscellaneous:Staff Call-Out fee is$40 per hour and shall be assessed when city staff S 40 per hour S 40 per hour is called to a field for any of the following reasons:confirm field reservations,tum lighting onloff,clean garbage!debris left by users,resolve complaints and/make repairs resulting from abuse by user. FACILITY RENTAL RATES Facilities: Redlands Community Center(111 W.Lugonia Avenue) Redlands Senior Center(111 W,Lugonia Avenue) Joslyn Senior Center(21 Grant Avenue) 7 7536 ExhibitA-B-Amended Fees 9.15,15 RECREATION DIVISION Service Name Fee Year 3 at 4121/2015 Fee Year 3(09115/15) User Groups: Group 1: City of Redlands/Public Agency-City personnel(for departmental,city and/or regional business),City Sponsored Groups,Council Members,Council appointed commissions, committees,and task forces:public agencies with reciprocal agreements. No fee. No Deposit Required. Group 2: Redlands Non-profit Organization and Community Groups-Registered non-profit or charitable group with registered non-profit status with the State of California,complete with tax exempt identification number:offering free membership open to the general public; groups sponsoring activities open to the public free of charge.No fee.$200 deposit required. Group 3: All non-resident individuals or groups;other community groups,businesses and/or individuals;groups soliciting donations or charging admission,groups sponsoring activities closed to the general public. Fees noted below. $200 deposit required. 440 GROUP 3-Facility/Room Rates Gym $61/hour $61/hour Racquetball Court $201 hour $20/hour Multipurpose Rooms $25!hour $25!hour Kitchens $51 Oat fee $51 flat fee Computer Class Room $30/hour $30/hour Conference Room $15 hour $15 hour Game Room(CC) $25 hour $25 hour Building $707 1-4 hours $707 1-4 hours' $51 each additional hr '$51 each additional hr 441 Miscellaneous Charges for All Groups Refundable Cleaning Deposit $200 flat fee $200 flat fee Attendant/Staff Supervision Fee $20 per attendant $20 per attendant Fees shall be prepaid to guarantee reservation. Refunds will be issued less a 10%administrative fee. A processing fee of$10 shall be assessed when applicants and/or participants request deviation from the standard processing time of five business days. All user groups shall comply with the City's established field and facility rental policies. Rental agreements may be negotiated for continuous use of the fields and/or facilities. The rates contained in these agreements may vary from the structure presented above. and shall be approved by City Council. RECREATION SERVICES/PROGRAMS/ACTIVITIES ADULT SERVICES,PROGRAMS AND ACTIVITIES 442 Adult Open gym $1/day per person $1/day per person $2/day per person non-resident $2/day per person non-resident 443 Adult Open Racquetball $1!hour per person 18 and over $1/hour per person 18 and over $2/hour per person 18 and $2!hour per person 18 and over, over,non-resident non-resident $25 annual pass-resident $25 annual pass-resident $35 annual pass-non-resident $35 annual pass-non-resident 444 Adult Classes 445 Adult Family Trips 100%Cost of Trip 100%Cost of Trip 446 Annual Pass $25/person 18 and over, $251 person 18 and over,resident I.D.,Game Room,Gym Usage, resident $351 person 18 and over,non- Racquetball and Tennis Courts $35/person 18 and over,non- resident resident $50 for group homes SENIOR SERVICES,PROGRAMS AND ACTIVITIES 447 Bingo $0.50 /card $0.50 /card 448 Senior Tournaments $201 tournament per person $20/tournament per person $100/tournament per team $1001 tournament per team 449 Senior Classes 450 Trips 100%cost of trip 100%cost of trip 451 Senior Transportation Program $ 1.75/person each way $ 1.75/person each way Bus Pass $17.50 for 10 one-way trips $17.50 for 10 one-way trips Senior Patron-A Patron is any senior making a voluntary donation in excess of$20 per year to either senior center. Patrons shall receive identification cards and shall save$5 on senior services, programs and activities. YOUTH SERVICES,PROGRAMS AND ACTIVITIES 452 Youth Annual Pass $10/person No Cherpe for use at Community Center 453 Teen Dances $3/person $3/person 454 Teen Trips Scholarships are available for all youth services,programs and activities. To qualify,scholarship recipients shall meet income requirements as established by the Department of Housing and Urban Development for San Bernardino County. 8 7536 Exhibit A-B-Amended Fees 9.15.15 MISCELLANEOUS: 455 Contract Classes City/Contractor Split=30nWfees are set by contractor 456 Special Events 100%cost of event 457 $10 f day per space without table Boutique Spaces S20/day per space with table Smiley Gardens $20/year per plot 458 Clement Gardens$30/year per plot Garden Plot Spaces Lugonia Gardens $35/year per plot 459 Program Attendant Fee $20/hour per employee 460 10%discount for individuals and teams registering a minimum of 30 days prior to the dose of registration Early Registration' (applies to all Youth,Adult,or Senior classes or programs requiring registration). 461 10%discount for multiple family members registering in the same Gass or program(applies to all Youth.Adult, Multiple Registration' or Senior classes or programs requiring registration). FINANCE DEPARTMENT Service Name %Recovery Fee Year 3 at 4/2112015 Fee Year 3(09115/15) 462 Business License-new 100%' 67 6_7 463 Business License-renewal 100%i 23 23 464 Yard Sale Permit 100%!, 3.40 3.40 465 Returned Check 100% 39 39 466 Dog licensing 100%i 23 23 467 Dog licensi09-spay/neutered 50% 11.50 11.50 468 Dog licensing-replacement tag 100% 17 17 469 State CASp Svc Fee' Statute 1 1 SB 1186,Disability Access Legislation(eff.1/1/2013-12/31/2018), imposes a$1.00 Stale fee on applicants for new and renewal business licenses with 70%retained by the City an 30%remitted to the State. LIBRARY SERVICES Service Name %Recovery Fee Year 3 at 4/2112015 Fee Year 3(09115/15) 470 Reservation of library materials _ 26% 0.75 Item 0.75 Atem 471 Non-resident fee 96% 30 30 9 7536 Exhibit A-B-Amended Fees 9.15.15 City of Redlands Construction CostCalculations Construction Types Construction Types 1.11,111,V-A rated 1,11,Ili; IV,V-B rated 2011112 Total" Mull.By Base Cost Cost for each Base Cosh Cost for each iBC Rala: Plan Check/ Inspection' Building Hrly Rale Threshold Additional Threshold Additional Class IBC Occupancy Type Project Size Process Hours Hours Time $105.40 Size 100 s:f. Size 100 s.f. 472 A-1 Assembly uses,usually with 5.000 18:2 57:0 75 $7;926 $7;926 $35.63 $5,945 526.72 Greater fined seating,intended for the 10.000 29:1 83.0 92 $9;708 $8,7Q8 $20.32 $7,281 $15.24 Than 50 production and viewing of the 20;000 36.4 75.0 111 St 1,739 ,$1,1,739 $24.90 $8,805 $18.68 Occupants performing arts or motion 30,000 48:0 87.0 135 $14,230 ,. , $34;230 $17;13 $10,672 $12-85 picutres: 50,000 59.5 108:0 168 $17,655 $.17,855 $10.44 $13,241 $7.83 100;000 85.0 132.0 217 $22,873 $27873 $10.44 $€7,155 $7;83 473 A-2 Assembly uses intended for 1.000 14:3 30x4 45 $4;690 $5,863 $38:21 54,890 530-57 food and/or drink consumption. 5;000 22.5 33.6 56 $5;913 $7,391 $39.26: $¢,943 $31.41 10,000 31.0 40.0 71 $7;484 $9;355 $21,87 $7,484 $17;50 Restaurant 20;000 411 46.4 88 $9;233 $11,542 57:03 $9;233 S5-62 50,060 46.0 57.6 104 $10,920 $13;650 $B.64'. $50;920 S6.91 100;000 66.0 704 136 St4;377 $17,971 58.84? $44377 86:91 474 A-3,A-4 Assembly uses intended for 1,000 15:2 50.5 66 $6;929 $8,662 $47,83 I: 36;929 $38.26 worship;Assembly uses .5,000 24.4 55.9 BO $8,460 $10,575 $52.02 $8;450 $41.61 intended for viewing of outdoor 10,000 33.5 66.5 100 $10;540 $13,176 $25:05 $10,548 $20.04 sporting events and activities 20,000 41.9 77,1 119 $12,545 $15,681 $11:75! „$72;545 $9-40 with spectator seating 50,00D 50.0 95.8 146 $15,364 $19,205 $11.27 $15;954 $9.02 100,000 71.5 117.0 189 $19;873 $24.8411 $11.27' ,<;$19,873 $9,02 475 S Buildings or spaces for office 1,000 12.5 24.4 37 $3,892 54,866 $33.17'; ;$3,892 $26.54 professional or service type 5,000 24:D 27.0 47 $4,954 $6,193 $33:32 .34795.4 $26,65 transacations,including storage 10,000 27.5 32.1 60 $6;287 $7,858 S15.B7; ,$6.267 $12-69 of records and accounts; 20,000 34.4 37.3 72 $7,556 $9,445 S6.135} ', $7;55,6 55:48 Restaurants with less than 50 50,000 41;0 46.3 87 S9;20D $11;500 $7.37 59;200 $5:90 occupants 10D,000 58.7 56.6 115 $12,150 $15,188 $7.37 $12150 $5.90 476 E Buildings or rooms used by 500 9;3 29,5 39 $4,088 $5,110 $56.68 ,,:5408.6 $45:34 more than 6persons for 2,500 14.8 32.6 47 54.995 $6,243 $62.22 x,995 S49-78 educational purposes up to the 5,000 20.4 38.8 59 $6,239 $7,799 $29.79: , , $8,239 $23.84 121h grade, 10,000 25;5 45.0 71 $7,431 $9;289 $17.01 ;57 4$4 $13,81 Day care for 6 or more children 25;000 34.0 55.9 90 $9;472 $11,840 $11.18:` $9,472 58:94 older than 2-112 years'of age, 50,000 42.8 68.3 113 $11,708 $14,635 $11.18 ?$i1Y708 $8.94 477 F Factory and industrial uses that 1,000 15.9 34.2 50 $5,282 $6;602 $43,30!, $5 282 $34.64 include the fabrication or 5,000 25.5 37,8 63 $6,667 $8;334 $44.13` ;,,56;667 $35.30 manufacturing of Moderate and 10,000 35.0 45.0 80 $8,432 510,540 $21.02 55432 $16.81 Low Hazard materials 20,000 43.8 52.2 96 $10;114 $12,642 S9,16 ,„ $17),114 $7:33 50,000 520 64.8 117 $12;311 515,389 $9.86[ ,;$1231 $7-88 100,000 75.0 79.2 154 $16,253 $20,317 59.86': $36:253 $7.88 478 H-1,H-2, HighHazard;Detonation hazard; 1;000 25,0 57,0 82 $8,643 _0 $55;34 $6;482 S41,50 H•3,H4. Deflagration hazard or hazard 5;OOD 40.0 63.0 103 $10;857 ,,410 A 5 7, $56.92 $8,142 S42'69 H=5 from accelerated buming; 1 D,000 55.0 75.0 130 $13;703 ;53,703 $31.62 $10,277 $23.72 Materials that readily support= 20;000 73.0 87:0 160 $16;865 Sib B&5 $10.44 $12,649 $7.83 combustion;Materials that are 50;000 81.7 108:0 190 $19;995 ;$79,995 $12.50 $14,996 $9:38 health hazards 100;000 117:0 132:0 249 $26;246 ;$26,246 512.54 519,684 59.38 479 1-1 Housing of clEents on a 24-hour 1,000 9.5 27.4 37 53,890 33 890 $22,68 $2;917 $17.01 basis in a supervised residential 5,000 15.3 30:2 46 $4;797 54797 $24.22 53,598 $18.16 environmentprovi0g personal 10,000 21:0 36.0 57 56;008 3G 6 $11.61 $4,506 56.70 care services 20,000 28:3 41:8 68 $7,169 $7,189 $5.21 $5,376 $3,91 50;000 3110 5€:8 83 $8,732 58,732 $5.34 56;549 $4.00 100,000 44.8 63.4 108 $11;401 $t`,°1 Alf, $5.34 $8,550 $4.00 480 1-2,1-3 Medical,surgical,psychiatric, 1,000 18,2 59:0 77 $8,132 , $81132 $45.10 $6,099 $33.83 nursing or custodial care on a 5,000 29:1 65:2 94 $9;936 $9,936 $49.17 $7;452 $36;88 24-hour basis for more than 6 10,000 40.0 77.6 118 $12;394 $j2394 S23.631 59,296 $17:72 persons;facilities where 20,000 80.090.0 140 $14,757 $,14 757 $10.44 $11,067 $7.83 persons are restrained 50,000 58.0 1117 170 $17,890 $57990 $10.29 _ $13,417 _ $7.72 ------------------- 100,OOD 82.0 136.6 219 $23,036 •523,03$ $10.29 $17,277 $7.72 Resolution No.7536 Exhibit A-Building and Safety Construction Cost Calculations Construction Types Construction Types I, 11, 111,V-A rated 1,It,ill;IV,V-B rated 21711!12 To1a1 Mull:By Base Cosh Cost for each Base Cost( Cost for each IBC Data! Plan Check/ Inspection Building Hrly Rate Threshold Additional Threshold Additional Class IBC Occupancy Type Project Size Process!lours Hours Time $105,40 Size 100 s,f. Size 100 s,f, 481 1-4 Day care operations of more 1,000 10,2 24.7 35 $3,681 : s3,6a.i 523.02 $2,761 $17:27 than 6 people of any age where 5,000 16.4 27.3 44 $4,602 $4,802 $23.90 $3,452 $17.92 the care is for less than 10;000 22,5 32.5 55 $5,797; _$5,79.7, $11.41 54;346 $6:56 24`-hours a day 20,000 28;1 37.7 66 S6,93B 56 9.38 5526 $5;204 $3:95 50.000 34.0 46.8 81 $6,517 $8,517 $5.14 $6,388 $3.86 100,000 1 48.0 57:2 105 $11;089 $11,ti89 $5.14 $8;316 $3.86 482 M Display and sale of 1,000 14;1 33.9 48 $5,058 $6;323 $39.562, $5 f15l3 $31.64 merchandise accessible to the 5,000 22.5 37.5 60 $8;324 $7,995 $41.06 $6,324 $32,84 public 10,000 30.9 44.6 76 $7,967 $9,958 519:60 „$7;967 515:68 21),000 38,7 51:8 90 $9:535 $11,918 58.49'd 58;535 $6:79 50,000 45:5 64.3 110 $11,572 $14,465 59.17 511`;$72. $7.33 100,400 66.0 78.6 145 515;238 $19,048 $9.17r= $15;23$ $7,33 483 R-1,R-2 Transient and nontransient 5,000 18,4 71.1 89 $9;428 $9,428 $39.00 $7;071 $29.25 lodging including hotels,motels 10,000 29.4 78;6 108 $11,378: $11;378 $27.39 58,534 $2D,54 apartments;and boarding 20,000 40.4 93.5 134 $14;117 $141.17 56.81 $10,588 $6.61 houses 50,000 50.5 108.5 159 $16,759 $16759 $7.31 $12,569 $5,48 100,000 59.0 134 7 194 $26;416 $20;4.16 $5.90 $15,312 $4.42 200,090 85.0 164:6 2501 526,311 $26,311 $5,90 $19;733 54:42 484 R-3,R-3.1, One and two-family homes; 1,000 7,7 17.5 251 52;657 53,321 $85;33 $2;857 $68:26 Ft'4 Residentially based 24-hour 2;000 12.4 19.3 32 $3;340 $4;174 $109.57 $3;341). $87.66 y 54;216 $83,59 facility for or fewer clients nT 3,000 17:0 23.4 40 54,216 55,270 $104:48 any age;Residential 4,006 21.3 26.7 48 $5;052 $6,315 $€86.96'; $5`,052 $149.57 carelassisted living for more 5;000 29.0 33:1 62 $6;548 $8,1851 $48.38 $6,548 $38,70 than 6 ambulatory clients 10,000 40:0 40.5 80 58,483 510,604 S48,3B_ „$8,483 $38.70 485 R-3 REPEAT OF MODEL 1,000 3:9 16A 20 $2;094 $2,617 $56.89r $45.52 One and two-family homes. 2,000 6.2 18.6 24 $2,549 $3,166 $56.89? , $2s49 $45,52 Repeat Plan Check set at 50% 3,000 8.5 20,0 29 $3;004 $3;755 $54,35 $3;004 $43.48 of initial plan check,per current- 4,000 10.6 22;6 33 $3;439 $4,299 $77.41 ii $3;439 $61.93 Master Fee Schedule. 5;000 14:5 24:0 39 $4,058 $5;073 $19.76 $4;658 $15,81 10,000 20.0 26.0 46 $4,849 $6,061 $19.76 54899 $15:81 486 S-1 Moderate hazard storage 500 11:6 32.8 44 $4,679 $4,879 $54.97 $3,510 $41123 2,500 18:6 36.2 55 $5,779: $5779 $58;51 $4,334 $43.89 5,000 25:6 43:1 69 $7,242 .SZ 242 $28.03 55;431 $21.02 10;000 32.0 50.0 B2 $8,643. $8,643 $15.51 $6,482 $11:63 25,000 42.0 62.1 1041 510,969 $7088.9. $10.45 $8,227 $7.84 50,000 53.6 75.9 129 $13,583 513,583 $10:45 $10,187 $7.84 487 S-2 Low hazard storage 500 11.6 32.8 44 $4,679 $4875 $54.97 $3,510 $41;23 2,500 18.6 36;2 55 $5,779 5$7,7.9 $58;51 $4;334 $43.89 5,000 25.6 43.1 69 $7;242 ,$7;242 $28.03 $5,431 $21;02 10;000 32.0 50.0 82 $8,643 $8643 $15.51 $6,482 $11.63 25;000 42.0 62,1 104 $10,969 $10,98 9 510,45 .$8,227 $7:84 50,000 53,0 75.9 123 $13;583 §73,583 510:45 510,187 $7.84 488 U Accessory and miscellaneous 1;000 7,5 16,3 24 $2,507 $3,134 $20.47: $16.38 structures not specifically 5,000 12.0 18.0 3D $3,162 $3;953 $20,89' „53;162 $16,71 classified 10,000 16.5 21.4 38 S3,99B S4,S97 58.95 53;898. $7.96 20,000 20.6 24.9 45 54,794 $5;993 54.56, 794 53:65 50,000 25x0 30;9 56 $5,888 $7;359 $4.44 $5;888 $3.55 100,000 35:0 37.7 73 $7,664 $9581 54.44 $7:864 $3,55 489 Dental 1;000 12.5 45.2 5131 $8,086 $6,066 532.31 $4,564 $24:23 Medical S;ODD 20,0 50,0 70 $7;376 $7378 $35,89 $5,534 $26:92 10;000 27:5 59.5 87 $9;173 $9113 $17.31 $6;880 $12.98 20,600 34.4 69,0 t03 $10,904 51.0 944 $8.17 58,178 $6:13 50,000 41.0 85,7 127 $13;356 $13,3b6 57,75 510,417 $5:81 100,000 .58.71 104.8 163 $17,230 $17 230 $7.751 $12,922 $5.81 Resolution No.7536 Exhibit A-Building and Safety Construction Cost Calculations Construction Types Construction Types I,II,III,V-A rated I,If,III,IV,V-B rated 2011/12 Total Mull.By Base Cost @ Cost for each Base Cost @ Cost for each lBC Data: Plan Check/ Inspection Building Hrly Rate Threshold Additional Threshold Additional Class IBC Occupancy Type Project Size Process Hours Hours Time $105.40 Size 100 s.f. Size 100 s.f. TENANTIMPROVEMENTS 490 B Medical Offices 1,000 6.4 21.3 28 $2,914 $3,642 $19.95 $2;814 $15.96 5,000 10.2 23.5 34 $3,552 $4,440 $21.87 $315$2 517.49 10,000 14.0 28.0 42 $4,427 $5,534 $10,51 $4;927 $8,41 20,000 17.5 32.5 50 55,268 $6,585 $5.64 $4.51 50,000 22.5 40.3 63 56,622 58,277 $5.92 „55;622 $4.73 106,0D0 36.01 49.3 85 $8,9891 $11,236 $5.92 $4.73 491 B Office Building 1,000 6.4 19.8 26 $2,754 53,442 $19.43 $2;754 $15.54 5,000 10.2 21.8 32 53,375 54,219 $21.02 $3 375 516.82 10,000 14.0 2B4O 40 $4,216 $5,270 $13.39„ ;,$4 2t6 $10.71 20,000 20.0 30.2 5Q $5,287 $6,609 $5.39 :55;287 $4.31 50,000 25.0 37.4 62 $6,561 $8,227 55.09 $5 58f S4.07 160,066 36.0 45,8 82 $8,618 $10,772 $5.09" 18 $4.07 492 A-2 Restaurant,more than 50 7,000 6.1 19.0 25 $2,649 53,312 $18.72 $2;648 $14.97 occupants 5,000 9.8 21.0 31 53,248 $4,060 $20,24 $3;44$ $16.19 10,000 13,5 25,0 39 54,058 $5,073 $9.72 ;$4;058 $7.77 20,000 16.9 29.0 46 $4,835 $6,044 $5.54:; $4;835 54.44 50,000 22.5 36.0 59 $6,166 $7,708 $5.67 > $6;188 $4.53 100,000 36.0 44,D 80 $8,432 $10,540 $5.67:; <58432 $4.53 493 M Store 7,000 6.6 20.9 27 $2,898 $3,622 $2027 Y $2;898 $16.22 5,000 10.5 23.1 34 $3,546 54,433 $22.02 $3;546 $17.61 10,000 14,5 27.5 42 $4,427 $5,534 $10.57:: :$4;477 $8.46 20,000 16.1 31.9 50 $5,273 $5,591 $5.96 ::$5;273 $4.77 50,000 24.0 39.6 64 $6,704 $8,380 $4.43; :;$8;70} $3.54 100,000 32,0 48,4 80 $8,475 $10,593 54.43 i' ;$6;47$ $3.54 494 BIH Lab!R&D 1,000 7.3 22.8 30 $3,170 $3,962 $22.28+ ;.;$31J0 $17.82 5,000 11.6 25.2 37 $3,883 54,853 524.15 $19.32 10,000 16.0 30,0 46 $4,849 $6,061 $17.59 $4;899 59.28 20,000 20.0 34.8 55 $5,776 $7,220 $6.D6 s '$5;776 S6.46 50,000 30.0 43.2 73 57,716 $9,645 $5.161, $4.13 160,000 40A 52.8 93 $9,782 $12,227 $5.16 $9;782 54.13 SHELL BUILDINGS 495 B,M,5 All Shell Buildings 5,0D0 21,5 11.4 33 $3,475. $12.35 $2,606 $9.26 10,000 25.3 13.5 39 $4,092 39,092 $4.36 $3,069 $3,27 25,000 29.4 15.6 45 54,746;,,, ,,,,$47+18 $11,37 $3,560 $8.53 50,000 47.0 25.0 72 $7,589: $7;589 $4.03 $5,692 $3.02 75,000 51.0 30.6 82 $8,596 ';;58;598 $4,12 $6,447 $3.09 100,000 55.0 36.3 91 $9,627 :58,627 54.47 $7,220 $3.35 125,000 60.01 41.9 102 510,744 ;;$10,744 $5.05 $8,058 $3.79 150,000 6(3.01 47,9 114 $12,008 008 $5.051 $9,006 $3.79 Resolution No.7536 Exhibit A-Building and Safety Construction Cost Calculations City of Redlands FEE SCHEDULE FOR MISCELLANEOUS ITEMS Work Item Unit Time Hourly Permit Fee Estimate Rate Standard Hourly Rate $105.40 496 Standard Hourly Rate per hour 1 $105.40 $105 Antenna 497 Equipment Container each 2 $105.40 $211 498 0-30 ft each 2 $105.40 $211 499 31+ft each 2.5 $105.40 $264 500 Cellular/Mobile Phone,free-standing each 3 $105.40 $316 501 Cellular/Mobile Phone,co-location each 2 $105.40 $211 502 Balcony addition each 4 $105.40 $422 503 Carport MINOR(<or=200 sq ft.) each 2.5 $105.40 $264 504 Carport MAJOR(>200 sq ft.) each 3.5 $105.40 $369 505 Change of Occupancy each 4 $105.40 $422 Close Existing Openings 506 Interior wall each 2 $105.40 $211 507 Exterior wall each 3 $105.40 $316 508 Trailers,mobile homes, and house cars(per unit) each unit 3.5 $105.40 $369 509 Compliance Inspections/Reinspections each 3.5 $105.40 $369 510 Deck(wood)-up to 200 sq ft. each 2 $105.40 $211 511 Each additional 100 sq ft. each 100 sf 0.5 $105.40 $53 512 Deck(wood)(with calcs)-up to 200 sq ft. each 3 $105.40 $316 513 Over 200 sq ft. each 3.5 $105.40 $369 514 Demolition-Single Family Dwelling each 2 $105.40 $211 515 Demolition-Multi Family/Commercial each 3 $105.40 $316 Door 516 New door(residential) each 2 $105.40 $211 517 New door(Commercial/Industrial) each 4 $105.40 $422 Fence or Freestanding Wall(non-masonry) 518 6-8 feet in height, first 100 If up to 100 If 2 $105.40 $211 519 8- 10 feet in height,first 100 If _up to 100 If -2.5 $105.40 $264 520 Each additional 100 If each 100 If 1 $105.40 $105 521 Over 10 feet in height up to 100 If 3 $105.40 $316 522 Over 10 feet in height(with calcs) up to 100 If 3 $105.40 $316 523 Each additional 100 If each 100 If 1 $105.40 $105 Fence or Freestanding Wall(masonry) 524 Masonry,(6-8 feet high), pre-engineered up to 100 If 3 $105.40 $316 525 Each additional 100 If each 100 If 1.5 $105.40 $158 526 Masonry,Special Design(6-10' high) up to 100 If 4 $105.40 $422 527 Each additional 100 If each 100 If 1.5 $105.40 $158 528 Masonry, Special Design(over 10'high) up to 100 If 5 $105.40 $527 529 Each additional 100 If each 100 If 1,5 $105.40 $158 Fireplace 530 Masonry each 3 $105.40 $316 531 Masonry(with calcs) each 3 $105.40 $316 532 Pre-Fabricated/Metal each 2 1$105.40 $211 533 Flag pole(over 30 feet in height) each 2 $105.40 $211 Garage(detached) Resolution No. 7536-Building and Safety Miscellaneous Items Work Item Unit Time HourlyPermit Fee Estimate Rate 534 Wood frame up to 1,000 sf each 4 $105.40 $422 535 MasonEy ue to 1,000 sf each 5 $105.40 $527 Grading(Cut and Fill) 536 0-100 Cubic Yards(Cut and Fill) 1.5 $105.40 $158 537 101-1,000 CY 2 $105.40 $211 538 1,000-10,000 CY 3 $105.40 $316 539 10,001 -100,000 CY 3.5 $105.40 $369 540 100,001 -200,000 CY 5 $105.40 $527 541 Each Add'I 10,000 CY or portion thereof 0.6 $105.40 $63 542 Greenhouse(non-commercial) each 3 $105.40 $316 543 Greenhouse(non-commercial)(with calcs) each 3 $105.40 $316 544 Lighting Pole each 2 $105.40 $211 545 Each Add'I Pole each 2 $105.40 $211 546 Partition-Commercial, Interior(up to 30 11) up to 30 Lf. 2 $105.40 $211 547 Additional partition each 30 Lf. 2 $105.40 $211 548 Partition-Residential, Interior(up to 30 Lf.) up to 30 Lf. 2 $105.40 $211 549 Additional partition each 30 Lf. 2 $105.40 $211 Patio Cover,Awning,Canopy,Trellis and Arbors 550 Wood frame up to 300 s,f. 2 $105.40 $211 551 Wood frame(with calcs) up to 300 s.f. 2.5 $105.40 $264 552 Other frame up to 300 s.f. 3 $105.40 $316 553 Additional Patio up to 300 s.f. 1 $105.40 $105 554 Solar Energy Systems Residential 0-15 kW 3 $105.40 $316 Residential each additional kW> 15kW 0.1 $105.40 $10.54 ._ _ - ---- -- - - .----- -- --------- - --- -- - - Non-Residential 0-50 kW 8 $105.40 $843 Non-Residential 51-250 kW 0.067 $105.40 $7.06 Non-Residential >250kW 0.042 $105.40 $4.43 555 Stucco Applications up to 400 s.f. 1.5 $105.40 $158 556 Additional Stucco Application each 400 s.f. 2 $105.40 $211 557 Repairs(For Fire,Water, Decay& Pests) <$10,000 1.5 $105.40 $158 558 Repairs(For Fire,Water, Decay& Pests) $10,000-25,000 2.5 $105.40 $264 559 Repairs(For Fire,Water, Decay& Pests) $25,001 -100,000 4.5 $105.40 $474 560 Repairs(For Fire,Water,Decay&Pests) >$100,000 5.5 $105.40 $580 Retaining Wall(concrete or masonry) 561 First 50 If up to 50 Lf. 3 $105.40 $316 562 Additional retaining wall each 50 Lf. 1.5 $105.40 $158 563 Special Design, 3-10'high (up to 50 If) up to 50 I.f. 3.5 $105.40 $369 564 Additional retaining wall each 50 Lf. 1.5 $105.40 $158 565 Special Design, over 10'high (up to 50 If) up to 50 11 5.5 $105.40 $580 566 Additional retaining wall each 50 Lf. 1.5 $105.40 $158 Remodel-Residential 567 500 s.f.Single Story up to 500 s.f. 3.5 $105.40 $369 568 501 -1,000 s.f. 501 to 1,000 s.f. 4 $105.40 $422 569 Additional remodel each add'I 500 sq ft) each 500 s.f. 1.5 $105.40 $158 Re-roof Single Family Dwelling/Duplex 570 Minor Repair<200 sq ft up to 200 s.f. 1 $105.40 $105 571 201 -3,000 sq ft 201 to 3,000 s.f. 2 $105.40 $211 572 >3,001 sq ft 3,001+s.f. 2.5 $105.40 $264 Re-roof Multi-Family/Comm./Ind. Resolution No. 7536-Building and Safety Miscellaneous Items Work Item Unit Time Hourly Permit Fee Estimate Rate 573 Minor Repair<200 sq ft up to 200 s.f. 1.5 $105.40 $158 574 201 -3,000 sq ft 201 to 3,000 s.f. 2.5 $105.40 $264 575 3,001 -10,000 sq ft 3,001 to 10k s.f. 3.5 $105.40 $369 576 > 10,001 sq ft 10k+s.f. 4 $105.40 $422 577 Roof Structure Replacement up to 500 s.f. 5 $105.40 $527 578 Additional roof structure replacement each 500 s.f. 1.5 $105.40 $158 Residential Additions 579 One Story up to 500 s.f. 4.5 $105.40 $474 580 One Story 501 -1,000 s.f. 6 $105.40 $632 581 One Story >1,000 s.f. 7 $105.40 $738 582 Multi-Story up to 500 s.f. 5 $105.40 $527 583 Multi-Story 501 -1,000$.f, 6 1$105.40 $632 584 Multi-Story >1,000 s.f. 8 $105.40 $843 585 Sauna-steam each 5 $105.40 $527 586 Shed (up to 200 s.f.) each 3 $105.40 $316 587 Each additional 100 s.f. each 100 s.f. 0.5 $105.40 $53 Siding 588 Stone and Brick Veneer(interior or exterior) up to 400 s.f. 2 $105.40 $211 589 All Other up to 400 s.f. 2 $105.40 $211 590 Additional siding up to 400 s.f. 2 1$105.40 $211 Signs 591 Monument each 2.5 $105.40 $264 592 Wall-mounted Fixture each 3 $105.40 $316 593 Free-standing each 4 $105.40 $422 594 Repairs/Replacement each 1 $105.40 $105 -- -------- -- -------------- - -- -- - --- - -- - ---- Skylight 595 Less than 10 sf each 1.5 $105.40 $158 596 Greater than 10 sf or structural each 2 $105.40 $211 Spa or Hot Tub 597 Above Ground each 2 $105.40 $211 598 In-ground Private each 2.5 $105.40 $264 599 In-ground Public each 3 $105.40 $316 Storage Racks 600 0-8'high (up to 100 ID first 100 If 3 $105.40 $316 601 each additional 100 If each 100 If 1.5 $105.40 $158 602 over 8'high (up to 100 If) first 100 If 4 $105.40 $422 603 each additional 100 If each 100 If 1.5 $105.40 $158 Swimming Pool/Spa 604 Private <800 s.f. 5 $105.40 $527 605 Private >800 s.f. 5.5 $105.40 $580 606 Public <800 s.f. 5.5 $105.40 $580 607 Public >800 s.f. 6 $105.40 $632 608 Swimming Pool Houses each 4 $105.40 $422 609 Temporary Utility Connection or Occupancy 1 $105.40 $105 Window or Sliding Glass door 610 Residential Replacement qty. 1-4 1.5 $105.40 $158 611 Residential Replacement qty.5 or more 2.5 $105.40 $264 612 New Window(non structural) each 2 $105.40 $211 613 New window structural shear wall/masonry) each 2 $105.40 $211 614 Bay Window(structural) each 2 $105.40 $211 Resolution No.7536-Building and Safety Miscellaneous Items Work Item Unit Time Hourly permit Fee> Estimate Rate 615 Service Reuiq red in Excess of Standard per hour 1 $100.40 $105 66 Re-inspection der hour 1 $105.40 $105 617 Plan Re-Check perhour 1 $105,40 $105 618 Researchper hour 1 $105.40 $105 ...................... _ 619 Residential Building Reports each 0:5 105.40 _._._ 53 $105.40 or Consultant Fee Plus 620 Expedited plan review and inspection service perwhour_ 10%Administrative Charge 621 Off-hours inspection (min 3 hours) 3 $105.40 $316 622 Ctrp g-Moth Instfu entati n and eisrnic Hazards dapping Feel valuation ',Group,kbbcuparkciss,ono,to tare stories excluding hot iemot is suooi ill bthr uillongs valudtion 'st 44;12.. .All ocuu anoies sirtilrurrs`fee 0$5 y lisafio , 6123 alifr�rhia He Eth safety ead , ptibn 1801'.6 build'n p? it fey $Oa 000 rrtrrilrn�arn:fe " $ Imp 1 Cl3s.:"ra new, " oontior�"or additidgs, S .uf 624 erlal Planiratenan Fie istan fl6or"`atea` 625 I ic'i fii i nnin A1C 2y a e 1 Pursuant to Californa Public Resources Cade Section 2705 2 In accordance with the January 1,;1996 Valuation Data Resolution No.7536-Buiiding and Safety Miscellaneous Items City of Redlands Mechanical, Plumbing and Electrical Standard Hourly Rate: $ 105.40 Fee Types-Mechanical Time Estimate Fee 626 Permit Issuance (one time fee for each mechanical permit issued) 0.32 $34 627 Stand Alone Mechanical Plan Check 1.00 $105 628 Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance. 0.75 $79 629 Installation or relocation of each floor furnace, including vent 0.75 $79 630 Installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater 0.75 $79 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, 631 absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code 0.75 $79 632 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system. 1.25 $132 Each air-handling unit, including ducts attached thereto:This fee shall not apply to an air- 633 handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. 1.25 $132 634 Each evaporative cooler other than portable type 0.75 $79 635 For each ventilation fan connected to a single duct 0.75 $79 636 Each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit 1.25 $132 637 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood 1.25 $132 638 Installation ar relocation of each commercial or industrial-type incinerator 1.00 $105 639 Miscellaneous: For each appliance or piece of equipment regulated by this code but not classed in other appliance categories,or for which no other fee is listed in the code 0.75 $79 640 Installation or relocation of any ducts stem 0.75 $79 641 For each process piping system of 1 to 2 outlets 0.75 $79 642 For each additional process piping outlet 0.25 $26 643 ether Mechanical Inspections(per hour) 1.00 $105 Fee Types-Plumbing Time Estimate Fee 644 Permit Issuance one time fee for each plumbing permit issued) 0.32 $34 645 Stand Alone Plumbing Plan Check 1.00 $105 646 For each plumbing fxture or trap or set of fixtures on trap(including water, drainage piping, and backfiow protection therefor) 0.75 $79 647 For each building sewer 0.75 $79 648 Rainwater systems per drain(inside building) 0.75 $79 648 Underground utilities (sewer, storm,water) Exception: Single Family Dwellings 0.75 $79 Resolution No.7536 Exhibit A-Mechanical, Pluming, Electrical Fee Types-Plumbing continued Time Estimate Fee 650 For each private sewage disposal system 0.75 $79 651 Water heater(no issuance fee assessed) 0.30 $32 652 For each industrial waste pretreatment interceptor including its trap and vent,excepting kitchen-type grease interceptors functioning as fixture traps 1.00 $105 653 For installation, alteration,or repair of water piping and/or water-treating equipment, each 1.00 $105 654 For repair or alteration of drainage or vent piping, each fixture 0.75 $79 For each lawn sprinkler system on any one meter, including backflow protection devices 655 therefor 0.75 $79 656 For atmospheric-type vacuum breakers 0.75 $79 657 1 to 5 0.50 $53 658 over 5 (each) 0.25 $26 659 For each backflow protective device other than atmospheric-type vacuum breakers: 0.50 $53 660 For each gas piping system of one to four outlets 1.00 $105 661 For each gas piping system of five or more outlets 0.75 $79 662 Other Plumbing and Gas Inspections(per hour) 1.00 $105 Fee Types -Electrical Time Estimate Fee 663 permit Issuance (one time fee for each electrical permit issued) 0.32 $34 664 Stand Alone Electrical Plan Check 1.00 $105 665 Swimming pools,therapeutic whirlpools, spas and alterations to existing swimming pools. Use unit fee schedule for itemized work. 0.75 $79 Temporary power(ea);Temporary power to a permanent location(ea); Temporary service 666 power pole or pedestal including all pole or pedestal-mounted receptacle outlets and appurtenances(ea) 0.50 $53 667 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas tree lots, firework stands, etc. 0.75 $79 Unit Fee Schedule Receptacle, Switch,and Light Outlets 668 Receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters: First 20 1.00 $105 669 Each Additional 20 Outlets 0.331 35 Resolution No. 7536 Exhibit A- Mechanical, Pluming, Electrical Fee Types-Electrical Continued Time Estimate Fee Lighting Fixtures 670 For lighting fixtures,sockets or other lamp-holding devices First 20 1.00 $105 671 Each Additional Outlet 0.10 $11 672 For pole or platform-mounted lighting fixtures 0.25 $26 673 For theatrical-type lighting fixtures or assemblies 0.50 $53 Residential Appliances For fixed residential appliances or receptacle outlets for same,including wall-mounted electric ovens;counter-mounted cooking tops; electrical ranges,self-contained room, console, or through-wall air conditioners; space heaters;food waste grinders; dishwashers; 674 washing machines;water heaters; clothes dryers or other motor-operated appliances not exceeding 1 horsepower(HP)in rating each. For other types of air conditioners and other motor-driven appliances having large electrical rating,see POWER APPARATUS. 0.75 $79 Non-Residential Appliances For residential appliances and self-contained factory-wired, non-residential appliances not exceeding 1 horsepower(HP), kilowatt(K",or kilovolt-ampere(KVA), in rating including 675 medical and dental devices;food, beverage,and ice cream cabinets;illuminated show cases;drinking fountains; vending machines; laundry machines;or other similar types of equipment, each. For other types of air conditioners and other motor-driven appliances having large electrical rating,see POWER APPARATUS 1.50 $158 Power Apparatus For motors, generators,transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus, as follows: Rating in horsepower(HP), kilowatts(KVV), kilovolt-amperes(KVA), or kilovolt-amperes-reactive(KVAR): 676 Up to and including 1 0.75 $79 677 Over 1 and not over 10 1.00 $105 678 Over 10 and not over 50 1.25 $132 679 Over 50 and not over 100 1.75 $184 680 Over 100, each 2.25 $237 Panelboards 681 Installation or relocation of panelboard (ea) 1.00 $105 Busways 682 For trolley and plug-in-type busways, each 100 feet or fraction thereof. An additional fee will be required for lighting fixtures,motors and other appliances that are connected Ko trolley and plug-in7type busways.No fee is required for portable tools 1.00 $105 Resolution No. 7536 Exhibit A-Mechanical,Pluming, Electrical Time Fee Types -Electrical Continued Estimate Fee Signs,Outline Lighting, and Marquees 683 For signs, outline lighting systems or marquees supplies from one branch circuit,each 0.75 $79 Electrical Services 684 For services of 600 volts or less; up to 1,OOOamperes in rating,each 1.00 $105 685 For services over 600 volts or over 1,000 amperes in rating, each 1.25 $132 Miscellaneous For electrical apparatus, conduits and conductors for which a permit is required but for 686 which no fee is herein set forth. This fee is not applicable when a fee is paid for one or more services, outlets,fixtures, appliances,power apparatus, busways,signs or other equipment. 0.75 $79 687 Other Electrical Inspections (per hour) 1.00 $105 Resolution No.7536 Exhibit A-Mechanical, Pluming, Electrical Exhibit"B" 1.01 Fee schedule applicable to development projects for which a completed application was filed with the City on or before January 31, 2093 BUILDING DIVISION Service Name Fee 1 Plan check microfilm $10+$21page 2 State mandated General Plan review $0.10/sq.ft. (on new construction or greater than 50%increase in floor area) 3 Building plan checking.......... Repeated plan checks at 50%of cost 4 Building Permits(Currently using 1994 Uniform Administrative Code with 1196 Building Valuation Data) (a)the Strong-Motion Instrumentation and Seismic Hazards Mapping Fee(pursuant to California Public Resources Code section 2705) Group R Occupancies: one to three stories excluding hotels/motels: valuation x$0.0001 All other buildings: valuation x$0.00021 All occupancies-minimum fee: $ .50 (b)the California Health&Safety Cade section 18931.6 buidling permit fee valuation x$0.00004 minimum fee $ 1 5 Paving, permit and inspection 1,000 sq.ft.or less $ 26 1,001 -5,000 sq.ft. $ 31 5,001 -20,000 sq. ft. $ 41 20,001 - 100,000 sq.ft. $ 52 100,001 sq. ft.and over $ 77 6 Certificate of occupancy inspection Non-Residential $ 88 Single family dwelling $ 31 Multifamily(2-10 units)or Commercial(under 1 acre) $ 62 Multifamily(11+units) or Commercial(1 acre+) $ 186 7 Swimming Pools $ 215 8 Hot tubs or spas $ 96 9 Roof recover Tile $ 3.05 per sq. ft. Composition Shingle $ 2.43 per sq. ft. 10 Signs $ 30.99 per sq. ft. PLANNING DIVISION Service Name Fee 11 Concept plan $ 6,429 12 Art and Public spaces review $ 1,838 13 Concept plan amendment $ 2,732 14 Specific plan _ $ 6,052 15 Specific plan amendment $ 2,840 16 CUP-new construction $ 5,055 17 CUP-no new construction $ 1,621 18 CUP-time extension $ 155 19 Revised CUP-construction $ 2,339 20 Revised CUP-no construction $ 1,177 21 CUP-daycare home(13+clients) $ 1,787 22 Variance-fence committee $ 413 23 Variance-SFR $ 1,549 24 Variance-comm, multi family $ 2,313 Resolution No.7536-Exhibit B PLANNING DIVISION Continued Service Name Fee 25 Variance-parking modification $ 1,312 26 Building moving-main structure $ 1,244 27 Building moving-garage/secondary structure $ 1,167 28 CRA-major>1 acre $ 5,639 29 CRA-minor 1 acre or less $ 4,317 30 CRA-time extension $ 155 31 Minor commission review $ 1,461 32 CRA-revised major $ 4,523 33 CRA-revised minor $ 3,868 34 Parcel map $ 3,769 35 Revised parcel map $ 2,964 36 Reversion to acreage/merger $ 2,076 37 Tentative tract map $ 9,439 38 Revised tentative tract map $ 6,263 39 Subdivision time extension $ 155 40 Lot line adjustment $ 480 41 Certificate of compliance $ 532 42 Negative declaration $ 4,306 43 Environmental project assessment $ 578 44 Residential Development Allocation (RDA) $ 2,184 45 RDA-alteration of approved project $ 444 46 RDA-transfer of development allocation $ 398 47 Home occupation permit-review $ 29 48 Zone Change-commission determination $ 1,725 49 Zone Change-ordinance text amendment $ 2,029 50 Zone Change $ 2,783 51 One sign review $ 506 52 Sign program $ 1,151 53 Flag test $ 1,105 54 Sign review by staff $ 72 55 Sign program amendment $ 620 56 Annual banner permit $ 83 57 Additional banner display $ 52 58 Searchlights $ 98 59 CUP-signs>120 SF $ 1,627 60 Demolition-SFR(>50 yr old) $ 723 61 Demolition-MF,Comm, Indstrl(>50 yr old) $ 713 62 Demolition-accessory bldg (>50 yr old) $ 496 63 Demolition-SFR(<50 yr old) $ 320 64 Demolition-MF,Comm, Indstrl(<50 yr old) $ 330 65 Demolition-accessory bldg(<50 yr old) $ 351 66 Annexation $ 8,474 67 Service plan for annexation $ 1,012 68 Pre annexation agreement $ 1,874 69 Agriculture preserve removal $ 1,787 70 General plan amendment $ 3,723 71 Street vacation $ 2,040 72 Appeal-Various Fees Paid $ 1,601 73 Addendum to planning commission $ 785 74 Continued item by applicant $ 232 75 Verification letter-basic $ 289 76 Verification letter-research $ 516 Resolution No.7536-Exhibit B PLANNING DIVISION Continued Service Name Fee 77 Temporary occupancy $ 155 78 News rack impound fee $ 284 79 Development agreement $ 4,461 80 Williamson Act contract removal $ 2,086 81 Socio Economic Study $ 2,386 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Service Name Fee 82 Environmental Impact Review $ 194 83 Environmental Impact Report Review $ 570 84 Tentative Tract Map $ 586 85 Revised Tract Map $ 293 86 Final Tract Map $ 511 87 Tentative Parcel M_ap_ $ 568 88 Revised Parcel Ma $ 293 89 Final Parcel Map $ 467 90 Conditional Use Permit $ 629 91 Commission Review and Approval $ 611 92 Building Moving Permit $ 502 93 Lot Line Adjustment $ 269 94 Certificate of Compliance $ 166 95 Street Vacation $ 564 96 Subordination Agreement/Lien Release $ 406 97 Building Permit-Residential $ 330 98 Building Permit-Commercial/industrial $ 330 99 Building Permit-Room Addition $ 115 100 Plan Check-Precise Grading-SFR $ 1,399 101 Plan Check-Precise Grading-Subdivision Base Fee $ 1,675 102 Plan Check-Precise Grading-Subdivision Lot fee $ 74 /lot 103 Plan Check-Precise Grading-Subdivision Acre Fee $ 89 /acre 104 Plan Check-SWPPP-SFR $ 1,173 105 Plan Check-SWPPP-Project Base Fee $ 1,175 106 Plan Check-SWPPP-Subdivision Lot Fee $ 91 /lot 107 Plan Check-SWPPP-Subdivision Acre Fee $ 131 /acre 108 WQMP BMP Inspection-Complex Projects $ 680 109 WQMP BMP Inspection-Standard Projects $ 453 110 WQMP BMP Inspection-Basic Projects $ 408 111 Plan Check-Final WQMP-SFR $ 1,009 112 Plan Check-Final WQMP-Project Base Fee $ 762 113 Plan Check-Final WQMP-Subdivision Lot Fee $ 257 /lot 114 Plan Check-Final WQMP-Subdivision Acre Fee $ 134 /acre 115 Plan Check-Parcel Map-Base Fee $ 1,529 116 Plan Check-Parcel Map-Lot Fee $ 84 /lot 117 Plan Check-Parcel Map-Acre Fee $ 84 /acre 118 Plan Check-Tract Map-Base Fee $ 1,413 119 Plan Check-Tract Map-Lot Fee $ 84 /lot 120 Plan Check-Tract Map-Acre Fee $ 84 /acre 121 Plan Check-Street Construction $ 276 122 Plan Check-Storm Drains $ 256 123 Plan Check-Street Lights $ 164 Resolution No. 7536-Exhibit B MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Service Name Fee 124 Plan Check-Traffic Signals-New Installations $ 887 125 Plan Check-Traffic Signals-Modifications $ 887 126 Plan Check-Street Trees $ 272 127 Plan Check-Signs and Striping $ 262 128Encroachment Permit-Driveway Approach $ 49 _ ___-- ---- -. ------------------------------------ ...,__..- - 129 Encroachment Permit-Sidewalk $ 0.09 /sq.ft. 130 Encroachment Permit-Gross Gutter/Spandrel $ 0.58 /sq.ft. 131 Encroachment Permit-Curb and Gutter $ 2.19 /fin.ft. 132 Encroachment Permit-Curb/Berm $ 2.62 /lin.ft. 133 Encroachment Permit-Crushed Aggregate Base $ 0.04 /sq.ft. 134 Encroachment Permit-Asphalt Pavement $ 0.04 /sq,ft. 135 Encroachment Permit-Street Light $ 81 136 Encroachment Permit-Traffic Signal-New $ 2,152 137 Encroachment Permit-Traffic Signal-Modification $ 1,737 138 Encroachment Permit-Reinforced Concrete $ 89 /cu.yd. 139 Encroachment Permit-Storm Drain Pipe $ 8 /lin.ft. 140 Encroachment Permit-Curb Inlet/Outlet Structures $ 67 141 Encroachment Permit-Storm Drain Manhole/Junction Box $ 67 142 Encroachment Permit-Curb Core $ 62 143 Encroachment Permit-Sewer Main $ 0.95 An.ft. 144 Encroachment Permit-Sewer Manhole $ 67 145 Encroachment Permit-Sewer Cleanout $ 134 146 Encroachment Permit-Sewer Lateral $ 67 147 Encroachment Permit-Water Main-Potable $ 1.09 /lin_ft. 148 Encroachment Permit-Water Main-Nan-potable $ 1.09 /lin.ft. 149 Encroachment Permit-Water Service Lateral $ 26 150 Encroachment Permit-Fire Hydrant Assembly $ 67 151 Encroachment Permit-Water Shutdown $ 67 152 Encroachment Permit-Fire Service $ 58 153 Encroachment Permit-Excavation,Trench,Street Cut $ 1.25 /fin.ft. 154 Encroachment Permit-Street Patch $ 0.67 /sq.ft. 155 Encroachment Permit- Processing Fee $ 219 156 Grading Permit-SFR $ 381 157 Grading Permit-Subdivision Base Fee $ 319 158 Grading Permit-Subdivision Lot Fee $ 45 /lot 159 Grading Permit-Subdivision Acre Fee $ 72 /acre 160 Permit-Truck Route $ 67 161 Permit-Wide Load $ 16 162 Permit-Outdoor Dining-New $ 186 163 Permit-Outdoor Dining-Annual Renewal $ 91 164 Permit-Outdoor Display-New $ 186 165 Permit-Outdoor Display-Annual Renewal $ 91 166 Street Name Sign Installation $ 312 167 Stop Sign Installation $ 535 168 NPDES Commercial Inspection-Law Risk $ 57 169 NPDES Commercial Inspection-High Risk $ 347 170 NPDES Commercial Inspection-Medium Risk $ 139 171 NPDES Industrial Inspection-Low Risk $ 63 172 NPDES Industrial Inspection-High Risk $ 382 _., _ _... ._. ----.__.. _.._ ------------- 173 ---- - --— 173 NPDES Industrial Inspection-Medium Risk $ 174 Resolution No.7536-Exhibit B FIRE DEPARTMENT Service Name Fee PLAN REVIEW 218 Plan review-commercial $ 207 219 Plan review-Multi family $ 62 220 Plan review-other(access,grading, house moving) $ 78 221 Plan review-residential tract $ 78 222 Plan review-single family $ 38 PLAN CHECK 223 Plan check-consultations (hourly fee) $ 207 224 Plan check-fire alarm $ 207 225 Plan check-sprinklers $ 207 226 Plan check-prevention engineering $ 207 227 Plan check-fuel dispensing $ 207 228 Plan check-hood &duct $ 207 229 Plan check-medical gas $ 207 230 Plan check-portables $ 207 231 Plan check-spray booths $ 207 HYDRANT/HYDRO FLOW TEST 290 Hydrant/Hydro Flow Test-Install, 1 tank $ 103 291 Hydrant/Hydro Flow Test-Install,2 tanks $ 207 292 Hydrant/Hydro Flow Test-Install,3 tanks $ 310 293 Hydrant/Hydro Flow Test-Removal, 1 tanks $ 103 294 Hydrant/Hydro Flow Test-Removal, 2 tanks $ 207 295 Hydrant/Hydro Flow Test-Removal, 3 tanks $ 310 293 Admin fee-cost recovery $ 62 297 Flow Test Fire Flow $ 41 Resolution No.7535-Exhibit B