HomeMy WebLinkAbout7313_CCv0001.pdf RESOLUTION NO. 7313
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
APPROVING THE SOCIO-ECONOMIC COST/BENEFIT STUDY FOR THE
REDLANDS FULFILLMENT CENTER PROJECT
WHEREAS, Hillwood Investment Properties proposes to develop the Redlands
Fulfillment Center project which consists of the construction of an approximately 1,015,740
square foot industrial building for warehouse and office uses (the "Project) on approximately
50.33 acres, and for which applications for a Planned Development and Parcel Map No. 19461
have been filed with the City of Redlands; and
WHEREAS, the City of Redlands' Planning Commission held a noticed public hearing
on August 13, 2013, and subsequently adopted a motion recommending to the City Council
approval of the Socio-Economic/Cost Benefit Study prepared for the Project; and
WHEREAS, a copy of the Socio-Economic Cost/Benefit Study and related materials for
the Project that were reviewed by the City of Redlands' Planning Commission in making its
recommendation of approval have been forwarded to the City Council;and
WHEREAS, the City Council held a duly noticed public hearing on September 3, 2013,
at which City staff and members of the public had the opportunity to provide verbal and written
testimony on the Socio-Economic Cost/Benefit Study for the Project;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF REDLANDS AS FOLLOWS:
SECTION 1. The City Council of the City of Redlands hereby approves the Socio-
Economic Cost/Benefit Study for the Project based upon the following findings:
A. THE PROJECT WILL NOT CREATE UNMITIGATED PHYSICAL BLIGHT
WITHIN THE CITY OR OVERBURDEN PUBLIC SERVICES INCLUDING, WITHOUT
LIMITATION, THE SUFFICIENCY OF POLICE AND FIRE PROTECTION SERVICES.
The Project will not create unmitigated physical blight within the City of Redlands
("City") or overburden public services, including without limitation police and fire protection
services. The Project consists of the construction of a 1,015,740 industrial building for
warehouse and office uses, utility and circulation infrastructure improvements, physical
amenities, site development amenities, and lighting.
The Project will not create physical blight. The Project's design enhances community
connectivity, provides over 330,215 square fee (7.58 acres) of site landscaping consisting of the
planting of over 800 trees, and increases pedestrian and vehicular connections between the
Project site and the surrounding community. The Project does not conflict with the pre-dominant
uses present in the surrounding are-as, and provides a development with amenities that blend in
with the surrounding community through the use of architectural features (e.g., scale, massing)
and landscaping buffers.
1,\cc1erWxReso1utions\Res 7300-7399\7313 Hillwood,SocioEconomic,doc
Although the Project does not require significant regional public infrastructure upgrades
for any utility or service, the Project developer will make improvements to facilitate
implementation of the Project. These improvements include the widening of roads and
signalization of appropriate intersections. The Project developer will also pay transportation
impact fees to the City as its fair share of cost of improvements to the roadway system.
Additionally, the Project is located in an area that includes existing residential and commercial
uses that are served by existing utility and roadway infrastructure.
The Project would upgrade water, sewer, and storm drain infrastructure and provide
connections to existing City infrastructure. Utilities will be placed underground. The Project
developer is required to fund its fair share allocation of any necessary public infrastructure
associated with development of the Project.
The Project when completed will generate a total of approximately 1,600 permanent new
jobs. The Project also provides the City with a net increase in property and sales taxes.
As determined in the Socio-Economic Cost/Benefit Study, annually, the Project will
provide an annual "new net" revenue of $190,413 to the City upon operation, and annual
ongoing costs of approximately $40,772. This equates to a revenue/cost ratio of a positive factor
of 4.67. For every dollar it spends,the City will receive$4.67 in revenue.
Because the Project will expand the City's economic base by increasing property and
sales tax revenues; provide jobs; provide the infrastructure necessary to meet Project needs in an
efficient and cost effective manner; and place an emphasis on design, landscaping and pedestrian
amenities in order to bolster a sense of community, the City finds that the Project will not create
physical blight within the City or overburden public services, including without limitation police
and fire protection services.
B. THE BENEFITS TO THE CITY RESULTING FROM DEVELOPMENT OF
THE PROJECT OUTWEIGH ANY DIRECT COST TO THE CITY THAT MAY RESULT.
The Socio-Economic Cost/Benefit Study demonstrates that, annually, the Project will
generate a"new net"revenue of approximately $190,413 and approximately $40,772 in cost and
have a positive balance of$149,641. For every dollar the City spends in providing services to
the Project,the City will receive$4.67 in"new net"revenue.
The Project would provide an industrial building that will include warehouse and office
uses, including over 330,215 square feet (7.58) acres of landscaping along street frontages and
within the center. Schools will be enhanced with the payment of school fees. Further, with the
additional revenue provided to the City through increased property tax assessment, business
license tax, sales tax and other revenue services, indirect funding will be provided for cultural
enhancements, downtown district enhancements, park enhancements, public safety (Police and
Fire)enhancements,and traffic enhancements.
The East Valley Corridor Specific Plan calls for conversion of agricultural land to
commercial and industrial development. Throughout the City and the County of San Bernardino,
agricultural land is continuing to be converted into other land uses as the economic feasibility of
-2-
1:\cc1erkVReso1utions\Res 7300-7399\7313 Hillwood.SocioEconomic,doc
farming in the area decreases. The conversion of agricultural land to alternative uses is
representative of the lack of its viability in the region due to the globalization of the industry.
Implementation of the Project will bring economic benefits to the City, including an
expanded economic base and additional sources of employment, As stated in the Mitigated
Negative Declaration and the Socio-Economic Cost/Benefit Study, implementation of the Project
will generate over 1,600 permanent new jobs.
In addition, construction employees would also be needed to construct the Project, It is
anticipated that the construction of the Project will generate a number of short-term employment
opportunities. The number of anticipated jobs associated with construction of the Redlands
Fulfillment Center Project urfl! be 379 basic jobs and 250 secondary jobs.
ADOPTED, SIGNED AND APPROVED this 3d day of September, 2013.
A
N
peter
etier Aguil gMayor
ATTEST:
Sari Irwin, it Clerk
1, San Irwin, City Clerk of the City of Redlands, hereby certify that the foregoing resolution was
adopted by the City Council at a -regular meeting thereof held on the 3rd day of September, 2013
by the following vote:
AYES: Councilmembers Foster, Gardner, Gilbreath, Mayor Aguilar
NOES- Councilmember Harrison
ABSTAID: None
ABSENT: None
Citv Clerk
-3-
l.\ccic-rk"\IZe,;oInti ',,Res7300--L399',,—;313 Hi llxvood.Soci(,I,'cono-,Pic,doc