Loading...
HomeMy WebLinkAbout8586RESOLUTION NO. 8586 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS ADOPTING A ROAD REPAIR AND ACCOUNTABILITY ACT PROJECT LIST FOR THE 2024/25 FISCAL YEAR WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensue the residents of City of Redlands (City) are aware of the projects proposed for funding in our community, andwhichprojects have been completed each fiscal year; and WHEREAS, the City must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $1,864,736 in RMRA funding in Fiscal Year 2024/25 from SB1; and WHEREAS, this is the eighth year in which the City is receiving SB1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and nobility options for the traveling public that would not have otherwise been possible without SB1; and WHEREAS, the City used the Pavement Management Program (PMP) to determine the SB 1 project list and ensure revenues are being used on the most high -priority and cost-effective projects that also meet the communities priorities for transportation investment; and WHEREAS, the funding from SB1 will supplement other funding to rehabilitate approximately thirty-six (36) lane miles throughout the City in the PMP 2024 Street Resurfacing Project; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will assist the City in continuing to fund the City's PMP program; NOW, THEREFORE, be it resolved by the City Council of the City of Redlands, as follows: Section 1. The foregoing recitals are true and correct. Section 2. The following proposed project list is attached hereto as Exhibit "A" may utilize 1 I:\Resolutions\Res 8500-8599\8586 Adopting Road Repair and Accountability Act Project List for FY24-25.docx-ms fiscal year 2024/25 Road Maintenance and Rehabilitation Account revenues in their delivery. With the listing of these projects in the adopted fiscal year resolution, the City is affirming to the public and the State its intent to fund these projects with Road Maintenance and Rehabilitation Account Revenues: PMP 2024 Street Resurfacing Project will maintain and rehabilitate approximately thirty-six (36) lane miles of various streets in the City of Redlands. The maintenance efforts include slurry sealing, crack sealing, and grinding with asphalt concrete overlay. The rehabilitation efforts includes removing and replacing existing asphalt, grinding and overlay with hot mix asphalt, and full depth reclamation. It also includes restriping, replacing traffic loops, manhole rim adjustment, etc. The project is anticipated to begin construction in fall 2024, with an estimated construction timeline of 6 months, and an estimated project life of at least 20 years where rehabilitation methods are implemented. Section 3. Adoption of this Resolution has no environmental impact and therefore such action is exempt from review under the California Environmental Quality Act ("CEQA") in accordance with State CEQA guidelines section 15061 (b)(3). ADOPTED, SIGNED AND APPROVED this 18tb day of June 2024 Eddie Tejeda, Mayor, ATTEST: e Donaldson, City Clerk 2 I:\Resolutions\Res 8500-8599\8586 Adopting Road Repair and Accountability Act Project List for FY24-25.docx-ms I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof, held on the 1 8th day of June 2024, by the following vote.: AYES : Councilmembers Barich, Davis, Guzman -Lowery; Mayor Tejeda NOES: None ABSENT: Councilmember Saucedo ABSTAINED: None e Donaldson, City Clerk 3 I:\Resolutions\Res 8500-8599\8586 Adopting Road Repair and Accountability Act Project List for FY24-25.docx-ms EXHIBIT "A" PMP 2024 STREET RESURFACING PROJECT [ATTACHED] 4 I:\Resolutions\Res 8500-8599\8586 Adopting Road Repair and Accountability Act Project List for FY24-25.docx-ms Exhibit "A" PMP 2024 STREET RESURFACING PROJECT STREET SEGMENTS No. Street Name From Street To Street 1 AMETHYST ST DEAD END END 2 ASHFORTH DR SUTHERLAND DR END 3 AVENUE N HIGHVIEW DR FLORIDA ST 4 BLUE BIRD LN BLUE JAY LN RIVERVIEW DR 5 BLUE JAY LN BLUE BIRD LN RIVERVIEW DR 6 BRYN MAWR AVE END LUGONIA AVE 7 CALIFORNIA ST LUGONIA AVE END 8 CANTANIA AVE TIVOLI DR VERONA DR 9 CASTLEGATE LN CRYSTAL SPRINGS LN PIONEER AVE 10 COLORADO ST DEODAR ST RIVERVIEW DR 11 CRYSTAL COVE CT CRYSTAL SPRINGS LN END 12 CRYSTAL SPRINGS LN TEXAS ST CASTLEGATE LN 13 DEODAR ST COLORADO ST FURLOW DR 14 DOMESTIC AVE END FURLOW DR 15 FOUNTAIN AVE KNOLL RD FOUNTAIN AVE 16 FOUNTAIN AVE END FOUNTAIN AVE 17 FOUNTAIN AVE END FOUNTAIN AVE 18 FURLOW DR PIONEER AVE DOMESTIC AVE 19 GARNET ST CONE CAMP RD NORTHERN CITY LIMIT 20 GREENSPOT RD NORTHERN CITY LIMIT SOUTHERN CITY LIMIT 21 HOWARD PL IOWA ST END 22 IOWA ST PARK CITRUS ST 23 LIVE OAK CANYON RD WESTERN CITY LIMIT EAST CITY LIMIT 24 LUGONIA AVE RESEARCH DR ALABAMA ST 25 MARIGOLD AVE SAN BERNARDINO AVE PALMETTO AVE 26 MILL ST DEAD END NEVADA ST 27 PALMETTO AVE NEVADA ST MARIGOLD AVE 28 PALOMARES RD SAN TIMOTEO CANYON RD END 29 RIVERVIEW DR BLUE BIRD LN END 30 ROOSEVELT RD ROOSEVELT RD END 31 SAN BERNARDINO AVE RESEARCH DR ALABAMA ST 32 SILVERLEAF CT ASHFORTH DR END 33 SONATA DR TIVOLI DR VERONA DR 34 SOUTH LN SUTHERLAND DR FREYA DR 35 SUTHERLAND DR ASHFORTH DR SOUTH LN 36 TENNESSEE ST SAN BERNARDINO AVE PIONEER AVE 37 TEXAS ST SANBERNARDINO AVE PIONEER AVE 38 TIVOLI DR CANTANIA AVE PIONEER AVE 39 VALLEY VIEW DR COUNTRY CLUB DR SUNSET DR 40 VERONA DR SAN BERNARDINO AVE SONATA DR 41 WABASH AVE LUGONIA AVE CAPRI AVE 42 WABASH AVE CITRUS AVE COLTON AVE 1 of 1