Loading...
HomeMy WebLinkAboutContracts & Agreements_29-2026Docusign Envelope ID: AD62629A-650A-4CDE-8472-3A47EAB124F7 FIRST AMENDMENT TO AGREEMENT TO PERFORM PROFESSIONAL SERVICES This First amendment ("First Amendment") to the agreement for Master Construction Management Services ("Agreement"), dated December 17, 2024, by and between the City of Redlands, a municipal corporation and a general law city ("City"), and Tilden -Coil Constructors, Inc., a California Corporation ("Consultant"), is made and entered into this 17th day of March, 2026. RECITALS WHEREAS, it is the desire of the City and Consultant to amend their existing Agreement, specifically to include additional preconstruction costs and amended Constriction Management fees associated with the development of facility located at 300 E. State Street, Redlands, CA 92373. NOW, THEREFORE, for good and valuable consideration in the receipt of which is hereby acknowledged City and Consultant agree as follows: AGREEMENT Section 1. Article 5 of the Agreement, entitled "Payments to Consultant," Section 5.1 is hereby amended to read as follows: "5.1 Compensation: Total compensation for Consultant's performance of the Services shall be in an amount not to exceed Two Million One Hundred Eight Thousand Five Hundred Ten Dollars ($2,108,510) without written authorization by the City. City shall pay Consultant in accordance with Exhibit `B," titled "Fee Schedule and Hourly Rates," which is attached hereto and incorporated herein by this reference. The compensation due the Consultant for Basic Services for each Assigned Project shall be as set forth in the Task Order for each Assigned Project. Payment of the Task Order Contract Price for an Assigned Project will be made by the City in accordance with the terms hereof. The Contract Price includes the fee of the Consultant, and personnel expenses of the Consultant and sub -consultants, inclusive of all benefits and burdens, travel for personnel of the Consultant and sub -consultants to and from the Site, travel within the Counties of Los Angeles, Orange, Riverside and San Bernardino, insurance and other overhead costs associated with or arising out of performance and completion of Basic Services for an Assigned Project. The Contract Price due the Consultant for an Assigned Project shall be established by mutual agreement of the Consultant and the City, and shall be determined using the following: Consultant Fee. Consultant Fee shall be calculated based on the anticipated sum of prime contracts for the Assigned Project at the rates identified in Exhibit `B." Preconstruction Labor. A not to exceed budget based upon Consultant's rates listed in Exhibit "B." General Conditions. A not to exceed budget base upon Consultant's rates listed in Exhibit "B" and agreed upon reimbursable expenses to support the Assigned Project." Section 2. The "Fee Schedule and Hourly Rates" set forth in Exhibit `B" of the Agreement is hereby replaced in its entirety with Exhibit `B," which is included hereto as Attachment 1 and incorporated herein by this reference. 1 1:\cmo\Agreements\1st Amendment Agreement Tilden-Coil.bm.03,052026.FY2526-133.doex Docusign Envelope ID: AD62629A-650A-4CDE-8472-3A47EAB124F7 Section 3. All other provisions of the Agreement shall remain unchanged by this First Amendment and in effect. IN WITNESS WHEREOF, the parties have executed this First Amendment, to be effective as of March 17, 2026. CITY OF REDLANDS TILDEN-COIL CONSTRUCTORS, INC. Docu5lgned by: In,� �'aSSAY'd, By. By: �� n�FRArnn�as Mario Sauced , Mayor Dayne Brassard, President & CEO ATTEST: e Donaldson, City Clerk 2 I:Icmo\Agreementsl l st Amendment Agreement Tilden-Coi1.6m.03.05.2026. FY2526--133.doex Docusign Envelope ID: AD62629A-650A-4CDE-8472-3A47EAB124F7 ATTACHMENT I EXHIBIT `B" FEE SCHEDULE & HOURLY RATES Preconstruction Phase Services: Services shall be billed on a time and materials basis based upon the hourly rates below. All materials shall be reimbursed at a cost plus a 10% markup. The preconstruction phase services budget shall not exceed $187,000 without prior written authorization by the City. 2. Construction Phase Services: Compensation for construction phase services includes Construction Manager's Fee (CM Fee) and General Conditions as described below: i. CM Fee: CM Fee shall be 5% of the sum of prime contracts (construction costs). The CM Fee shall be adjusted based upon the final construction costs. ii. General Conditions: General conditions/requirements are project site support expenses that are incurred by the construction manager (or by the general contractor in the case of a design -bid -bid delivery method) and are required for the project. These expenses are not associated with a particular subcontractor trade, but are required for the entire site as a whole such as fencing, trash, toilets, etc. General Conditions are billed at the established hourly rates and costs and are reimbursed without markup. The estimated General Conditions based upon our understanding of the construction schedule outlined above is $81,336 per month, or $1,220,040 for 15 months. iii. This preliminary general conditions estimate as set forth below: Compensation Summary Billed During Precon Billed During Construction Total Preconstruction Services $187,000 $187,000 CM Fee $701,470 $701,470 General Conditions $1,220,040 $1,220,040 Total 187,000 $1,921,510 $2,108,510 G\cmo\Agreemeubs\I st Amendment Agreement Tilden-Coil.bm.03.05.2026.FY2526-133.doex Docusign Envelope ID: AD62629A-650A-4CDE-8472-3A47EAB124F7 Uden Coil lirJAmR:afF lv�.Kri�r c�nm �935 Billable Hourly Rates Billable Hourly rates include escalation through 2026 and shall be subject to annual adjustments thereafter. Billable Hourly Position Rate Project Executive $187.00 Production Director $187A0 Safety Director $139.00 Sr. Project Manager $161.00 Sr. Superintendent $156.00 Project Manager $139,00 Assistant Project Manager $129.00 Superintendent $139.00 Area/Assistant Superintendent $127.00 Sr. Project Engineer $124.00 Project Engineer $108.00 Scheduler $158.00 BIM Manager $175.00 BIM Specialist $151.00 BIM Technician $135.00 TCC Survey $151.00 Preconstruction Manager $136.00 Estimator $106.00 Preconstruction Coordinator $70.00 Labor Compliance Coordinator $70.00 Accountant $108.00 Sr. Project Administrator $79.00 Project Administrator $70.00 Project Engineer Intern $32.00 Field Labor $103.00 4 1:1cTuulAgrecmentsl1st Amendment AgrecmentTilden-Coil.bm.03.05.2026.FY2526-133.docx