CEQA FINDINGS OF FACT AND
STATEMENT OF OVERRIDING CONSIDERATIONS
KAISER PERMANENTE REDLANDS MEDICAL CENTER
FINAL ENVIRONMENTAL IMPACT REPORT (FEIR)
(SCH # 2025010666)
Prepared for:
City of Redlands
City of Redlands
Kevin Beery, Senior Planner
35 Cajon Street, Suite 20
Redlands, CA 92373
Prepared by:
UltraSystems Environmental Inc.
16431 Scientific Way
Irvine, CA 92618
Telephone: 949.788.4900
Fax: 949.788.4901
January 2026
Project: 7214
TABLE OF CONTENTS
7214/Kaiser Permanente Redlands Medical Center Page i
Findings of Fact and Statement of Overriding Considerations January 2026
TABLE OF CONTENTS
1.0 INTRODUCTION .................................................................................................................................... 1-1
1.1 Organization and Format of Findings .......................................................................................... 1-1
1.2 Statutory Requirements for Findings and Statement of Overriding
Considerations ...................................................................................................................................... 1-2
2.0 PROJECT OBJECTIVES ......................................................................................................................... 2-1
3.0 PROJECT DESCRIPTION ..................................................................................................................... 3-2
3.1 Program Environmental Impact Report And Discretionary Actions .............................. 3-2
4.0 EFFECTS DETERMINED TO BE LESS THAN SIGNIFICANT IN THE INITIAL
STUDY AND DURING THE SCOPING PROCESS ............................................................................ 4-1
4.1 Aesthetics ................................................................................................................................................ 4-1
4.2 Agriculture and Forestry Resources ............................................................................................ 4-1
4.3 Air Quality ............................................................................................................................................... 4-2
4.4 Biological Resources ........................................................................................................................... 4-3
4.5 Geology and Soils ................................................................................................................................. 4-3
4.6 Hazards and Hazardous Materials ................................................................................................ 4-3
4.7 Hydrology and Water Quality ......................................................................................................... 4-4
4.8 Land Use and Planning ...................................................................................................................... 4-5
4.9 Mineral Resources ............................................................................................................................... 4-6
4.10 Noise .......................................................................................................................................................... 4-6
4.11 Population and Housing .................................................................................................................... 4-6
4.12 Public Services ...................................................................................................................................... 4-7
4.13 Recreation ............................................................................................................................................... 4-7
4.14 Transportation ...................................................................................................................................... 4-7
4.15 Tribal Cultural Resources ................................................................................................................. 4-8
4.16 Utilities and Services Systems ........................................................................................................ 4-8
4.17 Wildfire .................................................................................................................................................... 4-9
5.0 EFFECTS FOUND IN THE PEIR TO CREATE NO IMPACT OR A LESS THAN
SIGNIFICANT IMPACT WITHOUT MITIGATION ......................................................................... 5-1
5.1 Aesthetics ................................................................................................................................................ 5-1
5.2 Air Quality ............................................................................................................................................... 5-1
5.3 Biological Resources ........................................................................................................................... 5-2
5.4 Energy ....................................................................................................................................................... 5-2
5.5 Geology and Soils ................................................................................................................................. 5-2
5.6 Hazards and Hazardous Materials ................................................................................................ 5-4
5.7 Hydrology and Water Quality ......................................................................................................... 5-4
5.8 Noise .......................................................................................................................................................... 5-5
5.9 Public Services ...................................................................................................................................... 5-5
5.10 Utilities and Service Systems .......................................................................................................... 5-6
6.0 POTENTIALLY SIGNIFICANT ENVIRONMENTAL IMPACTS DETERMINED TO
BE MITIGATED TO A LESS THAN SIGNIFICANT LEVEL ........................................................... 6-1
6.1 Air Quality ............................................................................................................................................... 6-1
6.2 Biological Resources ........................................................................................................................... 6-4
6.3 Cultural Resources ............................................................................................................................6-14
TABLE OF CONTENTS
7214/Kaiser Permanente Redlands Medical Center Page ii
Findings of Fact and Statement of Overriding Considerations January 2026
6.4 Geology and Soils ...............................................................................................................................6-19
6.5 Greenhouse Gas Emissions ............................................................................................................6-21
6.6 Tribal Cultural Resources ...............................................................................................................6-25
7.0 ENVIRONMENTAL EFFECTS THAT REMAIN SIGNIFICANT AND
UNAVOIDABLE AFTER MITIGATION ............................................................................................. 7-1
7.1 Greenhouse Gas (GHG) Emissions ................................................................................................ 7-1
7.2 Transportation – Vehicle Miles Traveled (VMT) .................................................................... 7-4
8.0 FINDINGS REGARDING PROJECT ALTERNATIVES .................................................................... 8-1
8.1 Alternative 1: No Project Alternative .......................................................................................... 8-1
8.2 Alternative 2: No Project/General Plan Buildout Alternative ........................................... 8-2
8.3 Alternative 3: Reduced Intensity Alternative ........................................................................... 8-3
8.4 Alternative 4: Dispersed Facilities Alternative ........................................................................ 8-4
9.0 GENERAL CEQA FINDINGS ................................................................................................................ 9-1
9.1 Procedural Compliance With California Environmental Quality Act ............................. 9-1
9.2 Environmental Mitigation Monitoring Program ..................................................................... 9-2
9.3 CEQA Guidelines Section 15091 and 15092 Findings .......................................................... 9-2
9.4 City of Redland’s Independent Judgment................................................................................... 9-3
9.5 Reliance on Record .............................................................................................................................. 9-3
9.6 Recirculation Not Required ............................................................................................................. 9-4
9.7 Certification Of The Final Program Environmental Impact Report ................................ 9-6
10.0 ADOPTION OF STATEMENT OF OVERRIDING CONSIDERATIONS .................................... 10-1
ATTACHMENTS
Attachment A Final Mitigation Monitoring and Reporting Program (MMRP)
1.0–INTRODUCTION
7214/Kaiser Permanente Redlands Medical Center Page 1-1
Findings of Fact and Statement of Overriding Considerations January 2026
1.0 INTRODUCTION
The California Environmental Quality Act (CEQA) requires that a number of written findings be made
by the lead agency in connection with certification of an environmental impact report (EIR) prior to
approval of the project pursuant to Sections 15091 (Findings) and 15093 (Statement of Overriding
Considerations) of the CEQA Guidelines and Section 21081 of the California Public Resources Code.
This document provides the findings required by CEQA for the Lead Agency City of Redland’s (City)
approval of the proposed Project.
The potential environmental effects of the proposed Kaiser Permanente Redlands Medical Center
project (project or proposed project) have been analyzed in a Draft Program Environmental Impact
Report (Draft PEIR) (State Clearinghouse (SCH) 2025010666) dated November 2025. A Final PEIR
has also been prepared that incorporates the Draft PEIR, including supporting technical reports and
appendices, and contains comments received on the Draft PEIR, responses to the individual
comments, errata to the Draft PEIR, revisions to the Draft PEIR including any clarifications based on
the comments and the responses to the comments, and a Mitigation Monitoring and Reporting
Program (MMRP) for the proposed project. These findings are based upon all of the foregoing, as
well as reports and presentations by City staff and consultants and all written and oral evidence
contained in the administrative record of these proceedings.
1.1 Organization and Format of Findings
Section 1, Introduction, contains the general purpose of this Findings of Fact (Findings) and
Statement of Overriding Considerations, organization of this document, and a description of the
statutory requirements for the Findings and the Statement of Overriding Considerations.
Section 2 describes the project objectives.
Section 3 contains a summary project description, including the discretionary actions that support
and are a part of the project.
Sections 4 – 7 describe the City’s independently judged CEQA findings. Section 4 identifies the
proposed project's potential environmental effects that were determined to be less than significant
in the Initial Study and during the scoping process. Section 5 identifies the proposed project’s
environmental effects found in the PEIR to create no impact or a less than significant impact without
mitigation. Section 6 identifies the proposed project’s potentially significant environmental impacts
determined in the PEIR to be mitigated to a less than significant level. Section 7 identifies
environmental effects that cannot be mitigated to a less than significant level, even though all feasible
mitigation measures have been identified and incorporated into the project.
Section 8 identifies the proposed project alternatives that were studied in the PEIR and findings
regarding same.
Section 9 discusses the general CEQA findings in support of project approval including findings
regarding the project’s procedural and substantive compliance with CEQA..
Section 10 includes the Statement of Overriding Considerations providing the City’s views on the
balance between the project’s significant environmental effects and the merits and objectives of the
proposed project.
1.0–INTRODUCTION
7214/Kaiser Permanente Redlands Medical Center Page 1-2
Findings of Fact and Statement of Overriding Considerations January 2026
1.2 Statutory Requirements for Findings and Statement of Overriding
Considerations
CEQA (CA. Pub. Res. Code §§ 21000, et seq.) and the State CEQA Guidelines (Guidelines) (14 CA. Code
Regs §§ 15000, et seq.) promulgated thereunder, require the environmental impacts of a project to
be examined before a project is approved.
Guidelines Section 15043 (Authority to Approve Projects Despite Significant Effects) provides:
A public agency may approve a project even though the project would cause a
significant effect on the environment if the agency makes a fully informed and
publicly disclosed decision that:
(a) There is no feasible way to lessen or avoid the significant effect (see Section
15091); and
(b) Specifically identified expected benefits from the project outweigh the policy of
reducing or avoiding significant environmental impacts of the project. (See Section
15093.)
In relevant part, Guidelines Section 15090 (Certification of the Final EIR) provides:
(a) Prior to approving a project the lead agency shall certify that:
(1) The final EIR has been completed in compliance with CEQA;
(2) The final EIR was presented to the decision making body of the lead
agency and that the decision making body reviewed and considered the
information contained in the final EIR prior to approving the project; and
(3) The final EIR reflects the lead agency's independent judgment and
analysis.
Regarding findings, Guidelines Section 15091 (Findings) provides:
(a) No public agency shall approve or carry out a project for which an EIR has been
certified which identifies one or more significant environmental effects of the project,
unless the public agency makes one or more written findings for each of those
significant effects, accompanied by a brief explanation of the rationale for each
finding. The possible findings are:
1. Changes or alterations have been required in, or incorporated into, the
project, which avoid or substantially lessen the significant environmental
effect as identified in the final EIR.
2. Such changes or alterations are within the responsibility and jurisdiction of
another public agency and not the agency making the finding. Such changes
have been adopted by such other agency or can and should be adopted by
such other agency.
1.0–INTRODUCTION
7214/Kaiser Permanente Redlands Medical Center Page 1-3
Findings of Fact and Statement of Overriding Considerations January 2026
3. Specific economic, legal, social, technological, or other considerations,
including provision of employment opportunities for highly trained workers,
make infeasible the mitigation measures or project alternatives identified in
the final EIR.
(b) The findings required by subsection (a) shall be supported by substantial
evidence in the record.
(c) The finding in subdivision (a)(2) shall not be made if the agency making the
finding has concurrent jurisdiction with another agency to deal with identified
feasible mitigation measures or alternatives. The finding in subsection (a)(3) shall
describe the specific reasons for rejecting identified mitigation measures and project
alternatives.
(d) When making the findings required in subdivision (a)(1), the agency shall also
adopt a program for reporting on or monitoring the changes which it has either
required in the project or made a condition of approval to avoid or substantially
lessen significant environmental effects. These measures must be fully enforceable
through permit conditions, agreements, or other measures.
(e) The public agency shall specify the location and custodian of the documents or
other material which constitute the record of the proceedings upon which its decision
is based.
(f) A statement made pursuant to Section 15093 does not substitute for the findings
required by this section.
The “changes or alterations” referred to in Section 15091(a)(1) above, that are required in, or
incorporated into, the project which mitigate or avoid the significant environmental effects of the
project, may include a wide variety of measures or actions as set forth in Guidelines Section 15370
(Mitigation), including:
(a) Avoiding the impact altogether by not taking a certain action or parts of an action.
(b) Minimizing impacts by limiting the degree or magnitude of the action and its
implementation.
(c) Rectifying the impact by repairing, rehabilitating, or restoring the impacted
environment.
(d) Reducing or eliminating the impact over time by preservation and maintenance
operations during the life of the action.
(e) Compensating for the impact by replacing or providing substitute resources or
environments.
Guidelines Section 15092 (Approval) provides, in relevant part:
1.0–INTRODUCTION
7214/Kaiser Permanente Redlands Medical Center Page 1-4
Findings of Fact and Statement of Overriding Considerations January 2026
(a) After considering the final EIR and in conjunction with making findings under
Section 15091, the lead agency may decide whether or how to approve or carry out
the project.
(b) A public agency shall not decide to approve or carry out a project for which an EIR
was prepared unless either:
(1) The project as approved will not have a significant effect on the environment, or
(2) The agency has:
(A) Eliminated or substantially lessened all significant effects on the environment
where feasible as shown in findings under Section 15091, and
(B) Determined that any remaining significant effects on the environment found to be
unavoidable under Section 15091 are acceptable due to overriding concerns as
described in Section 15093. …
Regarding a Statement of Overriding Considerations, Guidelines Section 15093 (Statement of
Overriding Considerations) provides:
(a) CEQA requires the decision-making agency to balance, as applicable, the
economic, legal, social, technological, or other benefits, including region-wide or
statewide environmental benefits, of a proposed project against its unavoidable
environmental risks when determining whether to approve the project. If the specific
economic, legal, social, technological, or other benefits, including region-wide or
statewide environmental benefits, of a proposal project outweigh the unavoidable
adverse environmental effects, the adverse environmental effects may be considered
"acceptable."
(b) When the lead agency approves a project which will result in the occurrence of
significant effects which are identified in the final EIR but are not substantially
lessened, the agency shall state in writing the specific reasons to support its action
based on the final EIR and/or other information in the record. The statement of
overriding considerations shall be supported by substantial evidence in the record.
(c) If an agency makes a statement of overriding considerations, the statement should
be included in the record of the project approval and should be mentioned in the
notice of determination. This statement does not substitute for, and shall be in
addition to, findings required pursuant to Section 15091.
2.0–PROJECT OBJECTIVES
7214/Kaiser Permanente Redlands Medical Center Page 2-1
Findings of Fact and Statement of Overriding Considerations January 2026
2.0 PROJECT OBJECTIVES
As described in the Project Description in Chapter 2.0 of the PEIR, the proposed Kaiser Permanente
Redlands Medical Center project aims to achieve the following primary objectives:
1. Provide health care capacity for Kaiser Permanente members in the San Bernardino -
Redlands region.
2. Incorporate numerous sustainability features such as vegetated swales, tree-based
infiltration, and inert bioswales; high-performance building enclosure systems, external
shading, energy efficient and carbon neutral building systems and equipment selections, and
solar panels. The buildings will meet or exceed Leadership in Energy and Environmental
Design (LEED) Gold certification.
3. Develop the project site in accordance with the Medical Facilities designation in Redlands
Business Center Concept Plan No. 1.
4. Phase development over 25 years to keep pace with projected increase in Kaiser Permanente
membership in the facility’s service area over that period.
3.0–PROJECT DESCRIPTION
7214/Kaiser Permanente Redlands Medical Center Page 3-2
Findings of Fact and Statement of Overriding Considerations January 2026
3.0 PROJECT DESCRIPTION
The Kaiser Permanente Redlands Medical Center project involves the expansion and full buildout of
an approximately 37-acre healthcare campus located at 1301 California Street in the City of Redlands,
within Concept Plan No. 1 of the East Valley Corridor Specific Plan. The campus is currently developed
with a 120,000-square-foot medical office building and associated parking on the eastern portion of
the site; the remaining area consists of undeveloped land. The site is bounded by Almond Avenue to
the north, California Street to the east, and West Lugonia Avenue to the south, with a trailer parking
area to the west. Interstate 10 lies approximately 0.25 mile to the south, and the San Bernardino
International Airport runway system is approximately 1.4 miles to the northwest.
The project requires City approval of Amendment No. 8 to Concept Plan 1 to create a Development
Plan entitlement procedure under the East Valley Corridor Specific Plan, and Planned Development
No. 6, which establishes a phased development plan for future construction of the proposed facility.
The proposed project is consistent with the “Commercial Industrial” General Plan designation and
the CP-1 Medical Facilities District zoning.
Development would occur in four phases extending through approximately 2050 and ultimately
establish a regional medical center anchored by a 213-bed acute care hospital with the ability for
future expansion. Key facility components include:
• Phase 1 – Ambulatory Services Center/Medical Office Building No. 2
• Phase 2 – 213-Bed Acute Care Hospital, parking structure, and Central Utility Plant
• Phase 3 – Medical Office Building No. 3
• Phase 4 – Hospital expansion adding 108 beds
Upon completion, the campus would include approximately 948,000 square feet of medical facilities,
structured parking, designated patient and emergency access, photovoltaic systems, and a micro -
grid-enabled central utility plant. The project would provide 2,803 parking spaces, exceeding City
requirements.
The project includes external roadway and utility improvements to support hospital operations,
including widening of Almond Avenue and installation of new and upgraded utility connections.
Construction would be phased to maintain existing medical office operations on the campus and
would comply with City development standards as well as State hospital licensing requirements
under the California Department of Health Care Access and Information (HCAI). Additional CEQA
review will be conducted as required prior to approval of subsequent phases pursuant to CEQA
Guidelines §§15162–15164.
3.1 Program Environmental Report And Discretionary Actions
The Final PEIR addresses the direct, indirect, and cumulative environmental effects associated with
the adoption of the project. The Final PEIR provides the environmental information necessary for the
City to make a final decision on the requested discretionary actions. Discretionary actions to be
considered by the City may include, but are not limited to, the following:
• Certification of the Kaiser Permanente Redlands Medical Center project Program
Environmental Impact Report (SCH 2025010666)
3.0–PROJECT DESCRIPTION
7214/Kaiser Permanente Redlands Medical Center Page 3-3
Findings of Fact and Statement of Overriding Considerations January 2026
• The proposed project will require the City of Redlands Planning Commission and City Council
approval of:
o Amendment No. 8 to Concept Plan 1, which would amend the permitting procedure
in Concept Plan No. 1, Section IV, Part A (Discretionary Actions) under the East Valley
Corridor Specific Plan; and
o Planned Development No. 6.
• All mitigation measures identified for earlier phases of the project must be fully implemented
to the satisfaction of the City of Redlands Planning Division prior to Planning Commission
consideration or approval of any subsequent phases.
• Each phase of the project will require a development permit from the City of Redlands
Planning Commission, pursuant to East Valley Corridor Specific Plan § EV1.0405(c), and in
accordance with the City’s Commission Review and Approval Process set forth in City of
Redlands Municipal Code chapter 18.12 (amlegal.com, 2025). In addition, any work within
the public right-of-way, including required off-site improvements, will require issuance of an
encroachment permit by the City of Redlands Municipal Utilities & Engineering Department.
Further, prior to approval of subsequent project phases, the City will evaluate whether
additional environmental analysis is required under CEQA to address project changes,
updated conditions, or new information; such review would occur in compliance with CEQA
Guidelines §§ 15162–15164.
Other Permits and Approvals
Following the City’s approval of the PEIR, the following permits/approvals would be required prior
to the start of construction.
• City of Redlands: Grading Permit, Building Permits, and Encroachment Permits.
• City of Redlands and/or Caltrans: Street closure(s)/traffic controls.
• California Department of Health Care Access and Information (HCAI): Hospital permitting.
• SCAQMD: Permit to Construct and Permit to Operate central utility plant under Rule 203 and
other SCAQMD rules.
• Santa Ana Regional Water Quality Control Board: Will be determined through a jurisdictional
delineation conducted in accordance with applicable mitigation measures.
• United States Army Corps of Engineers: Will be determined through a jurisdictional
delineation conducted in accordance with applicable mitigation measures.
• California Department of Fish and Wildlife: Will be determined through a jurisdictional
delineation conducted in accordance with applicable mitigation measures.
• Southern California Edison Co.: Approval of application for interconnection and operation of
microgrid.
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-1
Findings of Fact and Statement of Overriding Considerations January 2026
4.0 EFFECTS DETERMINED TO BE LESS THAN SIGNIFICANT IN THE INITIAL STUDY
AND DURING THE SCOPING PROCESS
The City of Redlands, acting as Lead Agency under CEQA, issued a Notice of Preparation (NOP)
pursuant to State CEQA Guidelines §15082 to initiate preparation of the Draft Program
Environmental Impact Report.
CEQA Guidelines Section 15128 (Effects Not Found to be Significant) requires an EIR to contain a
statement briefly indicating the reasons that various possible significant effects of a project were
determined not to be significant and were, therefore, not discussed in detail in the EIR. Based on
substantial evidence in the record, including the environmental evaluation presented in the Initial
Study (Appendix A) and further analyzed in Chapter 4.0 of the EIR, the City determined and now
finds that the project would result in either no impact or less than significant impacts for the
environmental topics listed below and no mitigation measures are required for these topics pursuant
to Public Resources Code section 21081(a) and CEQA Guidelines section 15091(a).
4.1 Aesthetics
Except as provided in public resources code Section 21099, would the project:
Threshold b): Would the project substantially damage scenic resources, including, but not limited
to, trees, rock outcroppings, and historic buildings within a state scenic highway?
The City finds no state-designated scenic highways are located in the project vicinity; therefore, the
project would not damage scenic resources such as trees, rock outcroppings, or historic buildings
along a state scenic highway and the project would have no significant impacts. (see Appendix A —
§4.1).
Threshold d): Would the project create a new source of substantial light or glare which would
adversely affect day or nighttime views in the area?
Exterior lighting would comply with applicable City standards requiring shielding and downward-
direction, minimizing light spill and glare onto surrounding areas. Building materials would not
create substantial reflective glare. Further, the areas surrounding the project site are already
developed and any additional light or glare from the project is anticipated to be consistent with levels
already present in the vicinity of the project site. The surrounding commercial businesses operate as
logistical warehousing with semi tractor trailer trucks operating with large light beams continuously
as well as many installations of security lighting. The City finds that the project would not create a
new source of substantial light or glare which would adversely affect day or nighttime views in the
area and the project would have no significant impacts. (see Appendix A — §4.1).
4.2 Agriculture and Forestry Resources
In determining whether impacts on agricultural resources are significant environmental effects, lead
agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997)
prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on
agriculture and farmland. In determining whether impacts to forest resources, including timberland,
are significant environmental effects, lead agencies may refer to information compiled by the
California Department of Forestry and Fire Protection regarding the state’s inventory of forest land,
including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-2
Findings of Fact and Statement of Overriding Considerations January 2026
forest carbon measurement methodology provided in Forest Protocols adopted by the California Air
Resources Board. Would the project:
Threshold a): Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring
Program of the California Resources Agency, to non-agricultural use?
While regional mapping identifies limited Important Farmland in the area, the project site is
urbanized and designated for non-agricultural use. The City finds that the project would not directly
convert active farmland or disrupt agricultural production and would have no significant impacts.
(see Appendix A — §4.2).
Threshold b): Would the project conflict with existing zoning for agricultural use, or a Williamson
Act contract?
The site is not zoned for agricultural use and is not under a Williamson Act contract. Therefore, City
finds that the project would not result in any conflicts with agricultural zoning or contracted
agricultural lands and would have no significant impacts. (see Appendix A — §4.2).
Threshold c): Would the project conflict with existing zoning for, or cause rezoning of, forest land
(as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources
Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code
Section 51104(g))?
No portion of the site or surrounding area is designated or zoned as forest land, timberland, or
Timberland Production Zone. Therefore, the City finds that no such conflicts would occur and the
project would have no significant impacts. (see Appendix A — §4.2).
Threshold d): Would the project result in the loss of forest land or conversion of forest land to non-
forest use?
The City finds that the project area is fully urbanized and contains no forest lands, timber resources,
or comparable natural vegetation communities that could be converted or removed and the project
would have no significant impacts. (see Appendix A — §4.2).
Threshold e): Would the project involve other changes in the existing environment which, due to
their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion
of forest land to non-forest use?
The City finds that the project’s development would not introduce land use changes that could
indirectly convert farmland located off-site and the project would have no significant impacts. The
surrounding setting is urban, and no agricultural operations are present that could be affected by
project-related land use incompatibility. (see Appendix A — §4.2).
4.3 Air Quality
Where available, the significance criteria established by the applicable air quality management
district or air pollution control district may be relied upon to make the following determinations.
Would the project:
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-3
Findings of Fact and Statement of Overriding Considerations January 2026
Threshold d): Would the project result in other emissions (such as those leading to odors) adversely
affecting a substantial number of people?
The largest potential source of odors during construction is equipment exhaust. Odors from these
sources would be localized and generally confined to the immediate project area. The project would
use typical construction techniques, and the odors would be typical of most construction sites, would
be temporary in nature, and would not be sufficient to impact a substantial number of people or
result in a nuisance per SCAQMD Rule 402. According to the SCAQMD CEQA Air Quality Handbook
(SCAQMD, 1993), land uses and industrial operations that are associated with odor complaints
include agricultural uses, wastewater treatment plants, food processing plants, chemical plants,
composting, refineries, landfills, dairies and fiberglass molding. The project involves no i ndustrial
elements, so no long-term operational objectionable odors are anticipated. The City finds that the
project would not result in other emissions (such as those leading to odors) that would adversely
affect a substantial number of people. (see Appendix A — §4.3).
4.4 Biological Resources
Would the project:
Threshold f): Would the project conflict with the provisions of an adopted Habitat Conservation
Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat
conservation plan?
The project would not affect any protected trees, habitat conservation areas, or other sensitive
biological resources subject to local ordinances or adopted conservation plans. The City finds that
the project would remain consistent with the City’s land use regulations , does not conflict with any
biological resource protection policies and would have no significant impacts. (see Appendix A —
§4.4).
4.5 Geology and Soils
Would the project:
Threshold e): Would the project have soils incapable of adequately supporting the use of septic
tanks or alternative wastewater disposal systems where sewers are not available for the disposal of
waste water?
The project site would connect to the local sewer system and would not use septic tanks or
alternative wastewater disposal systems. Therefore, the City finds that no significant impacts
associated with septic tanks or alternative wastewater disposal systems would occur. (see Appendix
A — §4.7).
4.6 Hazards and Hazardous Materials
Would the project:
Threshold c): Would the project emit hazardous emissions or handle hazardous or acutely
hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-4
Findings of Fact and Statement of Overriding Considerations January 2026
There are no existing or proposed schools within 0.25 miles of the project site. Construction activities
and medical operations would comply with applicable federal and state hazardous materials
regulations. The City finds that the project would not emit hazardous emissions or handle hazardous
or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or
proposed school and would have no significant impacts. (see Appendix A — §4.9).
Threshold e): For a project located within an airport land use plan or, where such a plan has not
been adopted, within two miles of a public airport or public use airport, would the project result in a
safety hazard or excessive noise for people residing or working in the project area?
The project site is outside of noise contours for San Bernardino International Airport (SBIA)
approximately 1.3 miles to the north and there are no applicable zoning regulations relating to
aviation-related hazards to persons on the ground. As such, the City finds that the project
development would not cause airport-related hazards, or excessive noise, to people occupying the
project area and would have no significant impacts. (see Appendix A — §4.9).
Threshold f): Would the project impair implementation of or physically interfere with an adopted
emergency response plan or emergency evacuation plan?
The project would comply with City emergency access requirements and maintain adequate
emergency vehicle circulation during construction and operation. Coordination with fire and
emergency services and standard traffic control measures would ensure that si te access remains
available. The City finds that the project would not impair implementation of or physically interfere
with an adopted emergency response plan or emergency evacuation plan and would have no
significant impacts. (see Appendix A — §4.9).
Threshold g): Would the project expose people or structures, either directly or indirectly, to a
significant risk of loss, injury or death involving wildland fires?
The site is located within a developed urban area and is not within or adjacent to a Very High Fire
Hazard Severity Zone or other wildland interface area. Construction and operational compliance with
fire codes and building safety standards would further reduce any risk. The City finds that the project
would not expose people or structures, either directly or indirectly, to a significant risk of loss, injury
or death involving wildland fires and would have no significant impacts. (see Appendix A — §4.9).
4.7 Hydrology and Water Quality
Would the project:
Threshold a): Would the project violate any water quality standards or waste discharge
requirements or otherwise substantially degrade surface or ground water quality?
Construction stormwater controls and post-construction best management practices (BMPs)
consistent with the City’s WQMP requirements and the NPDES Construction General Permit would
prevent pollutants from entering stormwater runoff. The City finds the project would not violate any
water quality standards or waste discharge requirements or otherwise substantially degrade surface
or ground water quality and would have no significant impacts. (see Appendix A — §4.10).
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-5
Findings of Fact and Statement of Overriding Considerations January 2026
Threshold c): Would the project substantially alter the existing drainage pattern of the site or area,
including through the alteration of the course of a stream or river or through the addition of
impervious surfaces, in a manner which would:
i) result in substantial erosion or siltation on- or off-site;
ii) substantially increase the rate or amount of surface runoff in a manner which would result in
flooding on- or offsite;
iii) create or contribute runoff water which would exceed the capacity of existing or planned
stormwater drainage systems or provide substantial additional sources of polluted runoff; or
iv) impede or redirect flood flows?
Project drainage systems would maintain overall drainage flows to existing discharge points.
Engineering design and erosion control measures would prevent off-site erosion and avoid increased
on- or off-site flood hazards. Accordingly, the City finds that the project would not substantially alter
the existing drainage pattern of the site or area, including through the alteration of the course of a
stream or river or through the addition of impervious surfaces, in a manner which would result in
any of significant impacts of the types listed above. (see Appendix A — §4.10).
Threshold d): Would the project, in flood hazard, tsunami, or seiche zones, risk release of pollutants
due to project inundation?
The City finds that the project would not modify or redirect a stream or river, nor is it located in a
flood hazard area or subject to tsunami, seiche, or mudflow risk and would have no significant
impacts. (see Appendix A — §4.10).
Threshold e): Would the project conflict with or obstruct implementation of a water quality control
plan or sustainable groundwater management plan?
The City finds that stormwater design and operational requirements are fully consistent with the
applicable water quality control plan or sustainable groundwater management plan, including the
Santa Ana RWQCB Basin Plan and City stormwater management programs and the project would
have no significant impacts. (see Appendix A — §4.10).
4.8 Land Use and Planning
Threshold a): Would the project physically divide an established community?
The site is already urbanized and surrounded by roadway infrastructure. The City finds that the
project would be contained within existing parcels and would not create barriers , alter established
neighborhood circulation patterns, or physically divide an established community and the project
would have no significant impacts. (see Appendix A — §4.11).
Threshold b): Would the project cause a significant environmental impact due to a conflict with any
land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an
environmental effect?
The project is consistent with the City’s General Plan land use designation and zoning provisions for
medical center development. The City finds that there are no adopted regional, community, or
environmental land use plans that the project would conflict with and thus, the project would have
no significant impacts. (see Appendix A — §4.11).
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-6
Findings of Fact and Statement of Overriding Considerations January 2026
4.9 Mineral Resources
Threshold a): Would the project result in the loss of availability of a known mineral resource that
would be of value to the region and the residents of the state?
The project site is located within a fully developed urban area and is not mapped by the California
Geological Survey as containing any known regionally significant mineral resource deposits. The City
finds that the project’s development would not restrict access to mineral resources and would have
no significant impacts. (see Appendix A — §4.12).
Threshold b): Would the project result in the loss of availability of a locally important mineral
resource recovery site delineated on a local general plan, specific plan, or other land use plan?
There are no designated or active mineral extraction operations on or adjacent to the site, nor is the
site identified in any local mineral resource management plans. Accordingly, the City finds that the
project’s implementation would not interfere with mineral extraction or reserve availability and
would have no significant impacts. (see Appendix A — §4.12).
4.10 Noise
Threshold c): For a project located within the vicinity of a private airstrip or an airport land use plan
or, where such a plan has not been adopted, within two miles of a public airport or public use airport,
would the project expose people residing or working in the project area to excessive noise levels?
The nearest public-use airport to the project site is San Bernardino International Airport (SBIA)
approximately 1.3 miles to the north. The project site is outside of noise contours for SBIA. The San
Bernardino International Airport Authority Airport Layout Plan Narrative Report does not designate
zones surrounding SBIA where land uses are regulated to minimize aviation-related hazards to
persons on the ground (SBIA, 2010). Project development would not cause airport-related hazards,
or excessive noise, to persons at the project site. No impacts would occur, and no mitigation is
required. The City finds that the will not expose people residing or working in the project area to
excessive noise levels and would have no significant impacts. (see Appendix A — §4.13).
4.11 Population and Housing
Threshold a): Would the project induce substantial unplanned population growth in an area, either
directly (for example, by proposing new homes and businesses) or indirectly (for example, through
extension of roads or other infrastructure)?
The project would generate employment associated with hospital and medical office operations;
however, staffing needs are consistent with regional growth forecasts and are not expected to
directly result in substantial unplanned residential development. The project is located within a
planned urban area with infrastructure to support anticipated growth. The City finds that the project
will not induce substantial unplanned housing growth and that the project would have no significant
impacts. (see Appendix A — §4.14).
Threshold b): Would the project displace substantial numbers of existing people or housing,
necessitating the construction of replacement housing elsewhere?
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-7
Findings of Fact and Statement of Overriding Considerations January 2026
The City finds that the project site does not contain residential units or housing-supportive uses, that
no off-site displacement would occur as a result of construction or operation, and the project would
have no significant impacts. (see Appendix A — §4.14).
4.12 Public Services
Threshold a): Would the project result in substantial adverse physical impacts associated with the
provision of new or physically altered governmental facilities, need for new or physically altered
governmental facilities, the construction of which could cause significant environmental impacts, in
order to maintain acceptable service ratios, response times, or other performance objectives for any
of the public services:
• Schools? The project involves medical, and hospital uses that do not generate student
enrollment. Therefore, the City finds that there would be no demand for new school facilities
or expansion of existing facilities and that the project would have no significant impacts. (see
Appendix A — §4.15).
• Parks? Hospitals and medical offices do not induce recreational use in the same manner as
residential development. The City finds that the project would not increase demand for parks
or require development or expansion of recreational facilities and that the project would have
no significant impacts. (see Appendix A — §4.15).
• Other public facilities? The City finds that the project would not generate new population that
would require construction or expansion of libraries or other governmental service facilities,
that existing public facilities adequately serve the site, and the project would have no
significant impacts. (see Appendix A — §4.15).
4.13 Recreation
Threshold a): Would the project increase the use of existing neighborhood and regional parks or
other recreational facilities such that substantial physical deterioration of the facility would occur or
be accelerated?
The City finds that the project would have no significant impacts as it would not increase demand for
recreational amenities because it includes no residential uses and does not contribute to population
growth that drives park usage. (see Appendix A — §4.16).
Threshold b): Would the project include recreational facilities or require the construction or
expansion of recreational facilities which might have an adverse physical effect on the environment?
The City finds that the project would have no significant impacts as no recreational facilities are
included in the project, none are required to support medical operations, and the project would not
necessitate new or expanded park facilities. (see Appendix A — §4.16).
4.14 Transportation
Threshold a): Would the project conflict with a program, plan, ordinance, or policy addressing the
circulation system, including transit, roadway, bicycle, and pedestrian facilities?
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-8
Findings of Fact and Statement of Overriding Considerations January 2026
.The City finds that the project would have no significant impacts as it would not conflict with any
relevant transportation plans, ordinances and policies, including California’s Statewide
Transportation Improvement Program (STIP), San Bernardino County Congestion Management
Program (CMP), City of Redlands General Plan – Connected City Chapter, City of Redlands Sustainable
Mobility Plan, or the City of Redlands Bicycle Master Plan. (see Appendix A — §4.17).
Threshold c): Would the project substantially increase hazards due to a geometric design feature
(e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
The City finds that the project would have no significant impacts as project driveways and circulation
patterns are designed to City standards and adequate sight distance and access controls ensure safe
vehicle, pedestrian, and emergency circulation. (see Appendix A — §4.17).
Threshold d): Would the project result in inadequate emergency access?
Emergency vehicle access would be maintained during both construction and operation.
Coordination with fire and medical response agencies would ensure compliance with emergency
access requirements. The City finds that the project would not result in inadequate emergency access
and would have no significant impacts. (see Appendix A — §4.17).
4.15 Tribal Cultural Resources
Threshold a): Would the project cause a substantial adverse change in the significance of a tribal
cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural
landscape that is geographically defined in terms of the size and scope of the landscape, sacred place,
or object with cultural value to a California Native American tribe, and that is:
i) Listed or eligible for listing in the California Register of Historical Resources, or in a local
register of historical resources as defined in Public Resources Code section 5020.1(k), or
The project site is highly disturbed, and no tribal cultural resources were identified during
consultation and record review. Therefore, City finds that no impact to recognized tribal resources
would occur. (see Appendix A — §4.18).
4.16 Utilities and Services Systems
Would the project:
Threshold c): Would the project result in a determination by the wastewater treatment provider,
which serves or may serve the project that it has adequate capacity to serve the project’s projected
demand in addition to the provider’s existing commitments?
The City finds that the project would be served by the City’s existing wastewater treatment plant
which has adequate wastewater treatment capacity. and ensures impacts would remain less than
significant. (see Appendix A — §4.19; Draft and Final PEIR §4.14).
Threshold d): Would the project generate solid waste in excess of State or local standards, or in
excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste
reduction goals?
4.0–EFFECTS LESS THAN SIGNIFICANT IN INITIAL STUDY/SCOPING
7214/Kaiser Permanente Redlands Medical Center Page 4-9
Findings of Fact and Statement of Overriding Considerations January 2026
The project would be served by existing solid waste providers with adequate permitted landfill
capacity. The City finds that compliance with state waste reduction requirements ensures impacts
would remain less than significant. (see Appendix A — §4.19; Draft and Final PEIR §4.14).
Threshold e): Would the project comply with federal, state, and local management and reduction
statutes and regulations related to solid waste?
The project would comply with the applicable local, state, and federal standards for solid waste
disposal standards, including the California Integrated Waste Management Act (Assembly Bill (AB)
939 (1989)), AB 341 (2011), AB 1826 (2014), Senate Bill (SB) 1383 (2016), and Section 5.408
(Construction Waste Reduction, Disposal, and Recycling) of the 2022 California Green Building
Standards Code, and therefore, the City finds that the impacts would be less than significant.. (see
Appendix A — §4.19; Draft and Final PEIR §4.14).
4.17 Wildfire
If located in or near state responsibility areas or lands classified as very high fire hazard severity
zones:
Thresholds a): Would the project substantially impair an adopted emergency response plan or
emergency evacuation plan?
Thresholds b): Would the project, due to slope, prevailing winds, and other factors, exacerbate
wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
Thresholds c): Would the project require the installation or maintenance of associated
infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities)
that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
Thresholds d): Would the project expose people or structures to significant risks, including
downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or
drainage changes?
The site is located within an urbanized area and is not within or adjacent to a State-designated Very
High Fire Hazard Severity Zone. The City finds that Compliance with the California Fire Code,
defensible space requirements, and emergency access standards would ensure fire-related risks
remain less than significant. (see Appendix A — §4.20).
5.0-EFFECTS IN THE PEIR-NO IMPACT/LESS THAN SIGNIFICANT -WO MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 5-1
Findings of Fact and Statement of Overriding Considerations January 2026
5.0 EFFECTS FOUND IN THE PEIR TO CREATE NO IMPACT OR A LESS THAN
SIGNIFICANT IMPACT WITHOUT MITIGATION
The City of Redlands, as Lead Agency, evaluated the Kaiser Permanente Redlands Medical Center
project in the Final PEIR. CEQA Guidelines Section 15128 (Effects Not Found to be Significant)
requires an EIR to contain a statement briefly indicating the reasons that various possible significant
effects of a project were determined not to be significant and were, therefore, not discussed in detail
in the EIR.
Based on substantial evidence in the administrative record, including the environmental evaluation
presented in the Initial Study, (Appendix A) and further analyzed in Chapter 4.0 of the Final PEIR,
among others, the PEIR determined and the City now finds the following environmental topics would
result in No Impact or a Less Than Significant impact without mitigation. Therefore, no mitigation
measures are required for these topics pursuant to Public Resources Code section 21081(a) and
CEQA Guidelines section 15091(a).
5.1 Aesthetics
Except as provided in public resources code Section 21099:
Threshold a): Would the project have a substantial adverse effect on a scenic vista?
The project is in an urbanized area without designated scenic vistas. Although distant mountain
views exist, surrounding buildings already partially obstruct those views. Visual simulations confirm
and the City finds that the project would not significantly alter scenic vistas or designated scenic
corridors.
(see Draft and Final PEIR — §4.1).
Threshold c): Would the project substantially degrade the existing visual character or quality of
public views of the site and its surroundings? If the project is in an urbanized area, would the project
conflict with applicable zoning and other regulations governing scenic quality?
The project is located in an urbanized area and would adhere to and not conflict with applicable
zoning and other regulations governing scenic quality, including under the City’s General Plan,
development and design guidelines of the East Valley Corridor Specific Plan, and Redlands Business
Plan Concept Plan No. 1. Accordingly, the City finds that the project’s impacts would be less than
significant as the project would not substantially degrade the existing visual character or quality of
public views of the site and its surroundings and would not conflict with applicable zoning and other
regulations governing scenic quality.(see Draft and Final PEIR — §4.1).
5.2 Air Quality
Where available, the significance criteria established by the applicable air quality management
district or air pollution control district may be relied upon to make the following determinations.
Threshold a): Would the project conflict with or obstruct implementation of the applicable air
quality plan?
The project is consistent with the City’s General Plan and with SCAG regional growth assumptions
utilized in the South Coast AQMD 2022 Air Quality Management Plan (AQMP). Additionally,
5.0-EFFECTS IN THE PEIR-NO IMPACT/LESS THAN SIGNIFICANT -WO MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 5-2
Findings of Fact and Statement of Overriding Considerations January 2026
construction- and operational-phase emissions would not exceed SCAQMD regional significance
thresholds. Therefore, the City finds that the project would not conflict with or obstruct
implementation of the applicable air quality plan and the impact would be less than significant. (see
Draft and Final PEIR — §4.2).
Threshold c): Would the project expose sensitive receptors to substantial pollutant concentrations?
Localized construction emissions would remain below SCAQMD screening thresholds at the nearest
sensitive receptors, including onsite medical facilities. Emergency generator screening also shows
cancer and non-cancer risks below SCAQMD significance criteria. Therefore, the City finds that the
project would not expose sensitive receptors to substantial pollutant concentrations and the impact
would be less than significant. (see Draft and Final PEIR — §4.2).
5.3 Biological Resources
Threshold e): Would the Project conflict with any local policies or ordinances protecting biological
resources, such as a tree preservation policy or ordinance?
No trees regulated by the City of Redland’s Trees and Tree Protection Along Street and Public Places
Ordinance (Chapter 12.52) were documented onsite during the biological surveys. Therefore, no
impact on trees regulated by the City of Redlands would occur (Cadre Environmental, 2025, p. 48).
The City finds that the project would not conflict with any local policies or ordinances protecting
biological resources, such as the City’s General Plan and City Tree Ordinance, thus no impacts would
occur. (see Appendix A — §4.4; Draft and Final PEIR — §4.3).
5.4 Energy
Threshold a): Would the project result in potentially significant environmental impact due to
wasteful, inefficient, or unnecessary consumption of energy resources, during project construction
or operation?
Threshold b): Would the project conflict with or obstruct a state or local plan for renewable energy
or energy efficiency?
Construction and operation of the project would result in the use of electricity, transportation fuel,
and minimal diesel; however, all activities would comply with applicable state efficiency regulations,
including California Energy Code (Title 24) and CARB fuel-use requirements. The project includes a
fuel cell micro-grid and on-site solar generation, which substantially reduces long-term reliance on
the electrical grid and avoids inefficient energy consumption. The City finds that project would not
require new off-site energy infrastructure nor interfere with adopted state or local renewable energy
and energy-efficiency plans, including SB 100 and the City of Redlands Climate Action Plan and that
the project’s impacts would be less than significant. (see Draft and Final PEIR — §4.5).
5.5 Geology and Soils
Thresholds a) Would the project directly or indirectly cause potential substantial adverse effects,
including the risk of loss, injury, or death involving:
5.0-EFFECTS IN THE PEIR-NO IMPACT/LESS THAN SIGNIFICANT -WO MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 5-3
Findings of Fact and Statement of Overriding Considerations January 2026
i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map, issued by the State Geologist for the area or based on other
substantial evidence of a known fault? Refer to Division of Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including liquefaction?
iv) Landslides?
The project site is not located within an Alquist-Priolo Earthquake Fault Zone, and the likelihood of
surface fault rupture onsite is considered remote. Although the region is subject to seismic ground
shaking, all proposed structures would be designed and constructed in compliance with the
California Building Code seismic safety standards, which ensures appropriate structural protection.
Site-specific geotechnical investigations confirm that groundwater is located at depths greater than
50 feet and the site is not mapped within a liquefaction hazard area, resulting in negligible
liquefaction risk. The site is also situated on generally level terrain outside mapped landslide hazard
areas. Therefore, the City finds that the project would have a less than significant impact regarding
the rupture of a known earthquake fault, strong seismic groundshaking, seismic-related ground
failure, or landslides, and that the project’s impacts would be less than significant. (see Draft and Final
PEIR — §4.6).
Threshold b): Would the project result in substantial soil erosion or the loss of topsoil?
Construction activities would temporarily expose soils and create potential for erosion; however, the
project must comply with the State Water Resources Control Board’s General Construction Permit,
including preparation and implementation of a Storm Water Pollution Prevention Plan (SWPPP) and
use of required BMPs to control runoff and stabilize disturbed soils. Upon completion, the
development would include permanent paving, structures, and landscaping that would minimize
ongoing erosion potential. Therefore, the City finds that the project would not result in substantial
soil erosion or loss of topsoil and therefore, impacts would be less than significant. (see Draft and
Final PEIR — §4.6).
Threshold c): Would the project be located on a geologic unit or soil that is unstable, or that would
become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral
spreading, subsidence, liquefaction, or collapse?
Site-specific geotechnical investigations confirm the project site is not located within an area of
known geologic instability, nor is it susceptible to landslides, liquefaction, lateral spreading, or
collapse. Groundwater depth is greater than 50 feet, further reducing liquefaction potential.
Compliance with the California Building Code and implementation of the geotechnical
recommendations provided for project design and construction ensure soil stability. The City finds
that the project would not be located on a geologic unit or soil that is unstable, or that would become
unstable as a result of the project and that impacts would be less than significant. (see Draft and Final
PEIR — §4.6).
Threshold d): Would the project be located on expansive soil, as defined in Table 18-1-B of the
Uniform Building Code (1994), creating substantial direct or indirect risks to life or property?
Geotechnical laboratory testing indicates that on-site soils exhibit a very low expansion potential.
Standard engineering design and construction practices required by the California Building Code will
be implemented to ensure foundation stability. Based on the results of these potential expansion
5.0-EFFECTS IN THE PEIR-NO IMPACT/LESS THAN SIGNIFICANT -WO MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 5-4
Findings of Fact and Statement of Overriding Considerations January 2026
index tests, the City finds that surficial soils have a very low expansion potential and the project
would have a less than significant impact. (see Draft and Final PEIR — §4.6).
5.6 Hazards and Hazardous Materials
Threshold a): Would the project create a significant hazard to the public or the environment through
the routine transport, use, or disposal of hazardous materials?
Routine transport, handling, and disposal of hazardous materials during construction and hospital
operations would comply with applicable federal, state, and local requirements, including those
governing medical waste. As a result, the City finds that the project would not create a significant
hazard to the public or the environment and that the project’s impacts would be less than significant.
(see Draft and Final PEIR — §4.8).
Threshold b): Would the project create a significant hazard to the public or the environment through
reasonably foreseeable upset and accident conditions involving the release of hazardous materials
into the environment?
The project will comply with applicable hazardous materials regulations during construction and
operation, including requirements for containment, spill response, and medical waste management.
The City finds that these regulatory controls will ensure that reasonably foreseeable upset or
accidental release of hazardous materials does not pose a significant hazard to the public or
environment.
and that the project’s impacts would be less than significant. (see Draft and Final PEIR — §4.8).
Threshold d): Would the project be located on a site which is included on a list of hazardous
materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a
significant hazard to the public or the environment?
The project site is not identified on the Cortese List of hazardous materials sites under Government
Code §65962.5. Nearby listed facilities are closed cases or otherwise managed under regulatory
oversight and do not present a significant risk to future occupants or the environment. Therefore, the
City finds that the project would not create a significant hazard due to its location and that the
project’s impacts would be less than significant. (see Draft and Final PEIR — §4.8).
5.7 Hydrology and Water Quality
Threshold b): Would the project substantially decrease groundwater supplies or interfere
substantially with groundwater recharge such that the project may impede sustainable groundwater
management of the basin?
Water use by project operation would not substantially decrease groundwater supplies. The
proposed project would use approximately 107,594 gallons of water per day (0.33 af) or annual
water demand of 120.5 af which is accounted for in the City of Redlands Municipal Utilities &
Engineering Department (MUED) water demand forecasts. Further, low impact development (LID)
BMPs (e.g., infiltration basin and bioretention basins) would retain most stormwater generated on
the project site, remove trash and other contaminants specified in the project-specific Water Quality
Management Plan, and allow stormwater to infiltrate the soil and contribute to, and not interfere
with groundwater recharge. The City finds that the project would not substantially decrease
groundwater supplies or substantially interfere with groundwater recharge such that the project
5.0-EFFECTS IN THE PEIR-NO IMPACT/LESS THAN SIGNIFICANT -WO MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 5-5
Findings of Fact and Statement of Overriding Considerations January 2026
impedes sustainable groundwater management and that the project’s impacts would be less than
significant. (see Draft and Final PEIR — §4.9).
5.8 Noise
Threshold a): Would the project cause the generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the
local general plan or noise ordinance, or applicable standards of other agencies?
Unless an exception permit is granted, construction would be confined to City-allowed hours, and
equipment would meet manufacturer muffler standards. Modeled maximum construction exposure
at the nearest sensitive receiver is 80 dBA Leq (Phase 3 fine grading), which meets the FTA
construction threshold. To ensure that the threshold is not exceeded, BMP NOISE-1 shall be
implemented with the review and approval of Phase 3. The City finds that the project would not cause
a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project
in excess of applicable noise standards and that impacts would be less than significant. (see Draft and
Final PEIR — §4.10).
Threshold b): Would the project cause the generation of excessive groundborne vibration or
groundborne noise levels?
Construction-related groundborne vibration would result from intermittent use of heavy equipment,
jackhammers, and haul trucks. Vibration levels were modeled at distances to the nearest sensitive
receptor (existing or newly built medical buildings). The highest predicted vibration, from large
bulldozers at 342 feet, is 0.005 in/sec PPV and 53 VdB—well below the FTA thresholds of 0.12 in/sec
PPV for potential structural damage and 80 VdB for human annoyance. Haul truck vibration on
California Street is also below impact thresholds. No pile driving or other high-vibration methods are
proposed. Thus, the City finds that construction activities would not generate excessive groundborne
vibration, and impacts would be less than significant. Best Management Practice BMP NOISE-1 will
ensure noise levels during Phase 3 are verified and do not result in new or greater impacts. (see Draft
and Final PEIR — §4.10).
5.9 Public Services
Threshold a): Would the project result in substantial adverse physical impacts associated with the
provision of new or physically altered governmental facilities, the need for new or physically altered
governmental facilities, construction of which could cause significant environmental impacts, in
order to maintain acceptable service ratios, response times or other performance objectives for any
of the public services: a) and b) Fire Protection, and Police Protection.
The project would be served by existing City of Redlands fire and police facilities. Development would
comply with the California Building Code, California Fire Code, and City access and emergency
response requirements, ensuring adequate fire and life safety protection. The project will also pay
required Fire Protection Facilities Fees and Police Facilities Fees pursuant to Municipal Ordinance
No. 2968, which fund capital improvements necessary to maintain acceptable service ratios and
response performance. As such, the City finds that the project would not result in substantial adverse
physical impacts associated with the provision of new or physically altered governmental facilities
or need for new or physically altered governmental facilities and impacts would be less than
significant. (see Draft and Final PEIR — §4.11).
5.0-EFFECTS IN THE PEIR-NO IMPACT/LESS THAN SIGNIFICANT -WO MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 5-6
Findings of Fact and Statement of Overriding Considerations January 2026
5.10 Utilities and Service Systems
Threshold a): Would the project require or result in the relocation or construction of new or
expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or
telecommunications facilities, the construction or relocation of which could cause significant
environmental effects?
Project buildout will occur over four distinct phases, each generating incremental increases in water
demand. Infrastructure upgrades and coordination with the City of Redlands Municipal Utilities &
Engineering Department (MUED) will ensure service reliability, compliance with water quality
standards, system adequacy, pressure zone performance, and consistency with the City’s 2020 Urban
Water Management Plan (UWMP). The City of Redlands Water Reclamation Plant (WRP) has a
permitted capacity of 9.5 mgd and treats about 5.9 mgd on average, leaving substantial reserve
capacity. Project wastewater generation is estimated at ~86,075 gpd (0.086 mgd), which can be
accommodated within existing treatment and collection system capacities via standard on-site
laterals to the Lugonia/Almond sewer mains. No off-site expansion of treatment facilities is required,
and service will continue under existing Santa Ana Regional Water Quality Control Board (RWQCB)
waste discharge requirements (WDRs). Compliance with National Poll utant Discharge Elimination
System (NPDES) and municipal separate storm water system (MS4s, or storm drains) permit
requirements would prevent exceedance of drainage system capacity and minimize pollutant
discharges. The project would not conflict with or obstruct any state or local plan for renewable
energy or energy efficiency. The project would not interfere with the operation of telecommunication
facilities. Thus, the City finds project would have less than significant impacts as it would not require
or result in the relocation or construction of new or expanded water, wastewater treatment or storm
water drainage, electric power, natural gas, or telecommunications facilities, the construction or
relocation of which could cause significant environmental effects. (see Appendix A §4.19; Appendix
D11 (Water Supply Assessment); Draft and Final PEIR — §§4.5, 4.9, 4.14).
Threshold b): Would the project have sufficient water supplies available to serve the project and
reasonably foreseeable future development during normal, dry, and multiple dry years?
The City of Redlands Municipal Utilities & Engineering Department (MUED) projects water supply
ranging from 31,039 AFY in 2025 to 35,544 AFY in 2045 under normal conditions, with comparable
reliability during single-dry and multiple-dry years. The project demand of approximately 185 AFY
(114.7 gpm average) represents less than 0.6 percent of total available supply and is already included
in the City’s 2020 Urban Water Management Plan. Water will be delivered through existing
infrastructure in the Primary Pressure Zone, with phased connections to 16-inch and 12-inch mains
in California Street and Lugonia Avenue, respectively. No new or expanded water supply facilities are
required, and service will remain consistent with SB 610 WSA findings and City planning documents.
Thus, the City finds project would have a less than significant impact on water supplies available to
serve the project. (see Appendix D11 (Water Supply Assessment); Draft and Final PEIR — §§ 4.9, 4.14).
Threshold c): Would the project result in a determination by the wastewater treatment provider
which serves or may serve the project that it has adequate capacity to serve the project’s projected
demand in addition to the provider’s existing commitments?
As examined and explained with respect to thresholds a) and b), the WRP has substantial reserve
capacity and the existing treatment and collection system capacities can accommodate the Project.
The City finds that it has adequate wastewater treatment capacity to meet project wastewater
generation and impacts would be less than significant. (see Draft and Final PEIR — §4.14).
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-1
Findings of Fact and Statement of Overriding Considerations January 2026
6.0 POTENTIALLY SIGNIFICANT ENVIRONMENTAL IMPACTS DETERMINED TO BE
MITIGATED TO A LESS THAN SIGNIFICANT LEVEL
The City of Redlands, as Lead Agency, evaluated the Kaiser Permanente Redlands Medical Center
project in the Final PEIR. The PEIR identified the potential for the project to cause significant
environmental impacts in the areas of Air Quality, Biological Resources, Cultural Resources, Geology
and Soils, Greenhouse Gas Emissions, and Tribal Cultural Resources.
With the exception of those unmitigable impacts discussed in Section 7.0, pursuant to Section
21081(a) of the Public Resources Code and Section 15091(a)(1) of the CEQA Guidelines, the City finds
that for each of these significant effects identified in the Final PEIR, changes or alterations have been
required in, or incorporated into, the proposed project which mitigate or avoid the identified
significant effects on the environment to less than significant levels. Specifically, measures have been
identified that would mitigate the specific impacts in each area to a less than significant level. The
City adopts all of the feasible mitigation measures for the project described in the Final PEIR and as
set forth in the Mitigation Monitoring and Reporting Program (MMRP) as conditions of approval of
the project and incorporates those into the project.
These findings are explained below and are supported by substantial evidence in the administrative
record, including but not limited to the environmental evaluation presented in the Initial Study
(Appendix A) and further analyzed in Chapter 4.0 of the Final PEIR, among others.
6.1 Air Quality
The proposed Project would have a potentially significant impact related to air quality as follows:
▪ Air Quality Threshold B (net increase of any criteria pollutant)
6.1.1 Mitigation Measures
The following mitigation measures were included in the Draft PEIR and the Final PEIR, are applicable
to the proposed project and would reduce potential project impacts related to air quality emissions
to less than significant levels. These measures as provided include any revisions incorporated in the
Final PEIR.
Mitigation Measure AQ-1:
Include in a Plan or Policy that Gas Powered Landscape Equipment must be replaced with Zero-
Emission Landscape Equipment (listed at A-1 in the aforementioned CAPCOA Handbook, and LL-1 in
CalEEMod). If feasible, landscape and maintenance contracts shall require only Zero-Emission
Landscape Equipment be used.
Mitigation Measure AQ-2: Provide Electric Vehicle Charging Infrastructure (listed as T-14 in
CalEEMod).
Mitigation Measure TRANS-1: Prior to issuance of a certificate of occupancy for each phase of the
project, the project proponent will implement a commute trip reduction program consisting of
information sharing and marketing to promote and educate employees about their travel choic es to
the project site beyond driving such as carpooling, taking transit, walking, and biking, thereby
reducing VMT and GHG emissions.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-2
Findings of Fact and Statement of Overriding Considerations January 2026
Mitigation Measure TRANS-2: Prior to issuance of a certificate of occupancy for each phase of the
project, the project proponent will implement a ridesharing program for employees with similar
commutes with funding requirements for employers. Ridesharing encourages carpooled vehicle trips
in place of single-occupied vehicle trips, thereby reducing the number of trips, VMT, and GHG
emissions. Existing programs including IE Commuter can be leveraged for this measure.
Mitigation Measure TRANS-3: Prior to issuance of a certificate of occupancy for each phase of the
project, the project proponent will install and maintain end-of-trip facilities for employee use. End-
of-trip facilities include bike parking, bike lockers, showers, and personal lockers. The provision and
maintenance of secure bike parking and related facilities encourages commuting by bicycle, thereby
reducing VMT and GHG emissions.
Mitigation Measure TRANS-4: Prior to issuance of a certificate of occupancy for each phase of the
project, the project proponent will implement an employer-sponsored vanpool service. Vanpooling
is a flexible form of public transportation that provides groups of 5 to 15 people with a cost-effective
and convenient rideshare option for commuting. The mode shift from long-distance, single-occupied
vehicles to shared vehicles reduces overall commute VMT, thereby reducing GHG emissions. It was
assumed that up to 2% of employees would participate in the vanpool program.
(see Draft and Final PEIR — §§4.2, 4.12, 11).
6.1.2 Air Quality Threshold B (net increase of any criteria pollutant)
Where available, the significance criteria established by the applicable air quality management
district or air pollution control district may be relied upon to make the following determinations.
Threshold b): Would the project result in a cumulatively considerable net increase of any criteria
pollutant for which the project region is non-attainment under an applicable federal or state ambient
air quality standard?
As demonstrated by CalEEMod modeling in Draft PEIR Tables 4.2-6 through 4.2-15, project-
generated criteria pollutant emissions from both construction and operation would remain below
South Coast AQMD regional significance thresholds with implementation of required mitigation
measures (MM AQ-1, MM AQ-2, and MM TRANS 1 through 4). Because emissions do not exceed these
thresholds and the project is consistent with the regional Air Quality Management Plan, the project’s
incremental contribution to cumulative air quality conditions in the South Coast Air Basin would not
be cumulatively considerable. (see Draft and Final PEIR — §4.2).
6.1.2.1 Findings
Based on substantial evidence in the administrative record (including PEIR Section 4.2; Tables 4.2-6
through 4.2-15), the City finds that:
• With implementation of MM AQ-1, MM AQ-2, and MM TRANS-1 through MM TRANS-4, both
construction and operational emissions of criteria pollutants and precursors would remain
below South Coast AQMD regional significance thresholds.
• The project would not conflict with or obstruct implementation of the applicable Air Quality
Management Plan.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-3
Findings of Fact and Statement of Overriding Considerations January 2026
• Accordingly, the project’s incremental contribution to cumulative regional air quality impacts
in the South Coast Air Basin would not be cumulatively considerable.
Therefore, air quality impacts under CEQA Guidelines Appendix G Threshold (b) would be less than
significant with mitigation incorporated.
The City finds that MM AQ-1, MM AQ-2, and MM TRANS-1 through MM TRANS-4 are feasible, will
reduce the potential air quality-related impacts of the proposed project to less-than-significant levels,
and are adopted by the City. Accordingly, the City finds, that pursuant to PRC Section 21081(a)(1),
and the CEQA Guidelines Section 15091(a)(1), changes or alterations have been required in, or
incorporated into, the proposed project, which avoid or substantially lessen the significant
environmental effect as identified in the Final PEIR.
6.1.2.2 Facts in Support of Findings
As demonstrated by CalEEMod modeling results in Tables 4.2-6 through 4.2-15 of the Draft PEIR,
implementation of mitigation measures MM AQ-1 (enhanced dust control per SCAQMD Rule 403),
MM AQ-2 (use of Tier 4 Final diesel construction equipment), and MM TRANS-4 (Transportation
Demand Management to reduce vehicle trips) ensures that construction and operational emissions
of criteria air pollutants remain below SCAQMD regional significance thresholds. Additional
measures that were not incorporated in the emissions calculations but further reduce VMT-related
emissions will also be implemented: MM TRANS-1 (Implement Commute Trip Reduction Marketing),
MM TRANS-2 (Provide Employee Rideshare Program), and MM TRANS-3 (Provide End-of-Trip
Bicycle Facilities).
The project’s consistency with the applicable Air Quality Management Plan further supports the
conclusion that it would not result in a cumulatively considerable contribution to air quality impacts
within the South Coast Air Basin. These facts provide substantial evidence that the project’s air
quality impacts under CEQA Guidelines Appendix G Threshold (b) would be less than significant with
mitigation. (see Draft and Final PEIR — §§4.2, 4.12).
6.1.2.3 Cumulative Impacts
As addressed in Section 6.1.1 and substantiated by emissions modeling in Draft PEIR Tables 4.2 -6
through 4.2-15, the Kaiser Permanente Redlands Medical Center project would not generate
construction or operational emissions that exceed the South Coast Air Quality Management District
(SCAQMD) regional significance thresholds. The South Coast Air Basin (SCAB), where the project is
located, is currently designated as non-attainment for ozone (O₃) and particulate matter (PM₁₀ and
PM₂.₅) under both federal and state standards.
The cumulative impact assessment incorporates both project-level emissions and region-wide
sources of criteria pollutants. The project’s consistency with the 2016 Air Quality Management Plan
(AQMP), as well as its compliance with SCAQMD regulations and implementation of mitigation
measures MM AQ-1 (enhanced dust control), MM AQ-2 (Tier 4 Final diesel equipment), MM TRANS-
1 (Implement Commute Trip Reduction Marketing), MM TRANS-2 (Provide Employee Rideshare
Program), MM TRANS-3 (Provide End-of-Trip Bicycle Facilities), and MM TRANS-4 (trip reduction
through Transportation Demand Management), ensures that its incremental emissions do not make
a cumulatively considerable contribution to regional non-attainment conditions.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-4
Findings of Fact and Statement of Overriding Considerations January 2026
6.2 Biological Resources
The proposed Project would have a potentially significant impact related to biological resources as
follows:
▪ Biological Resource Threshold A (special status species)
▪ Biological Resource Threshold B (sensitive natural community)
▪ Biological Resource Threshold C (protected wetlands)
▪ Biological Resource Threshold D (wildlife corridors)
6.2.1 Mitigation Measures
The following mitigation measures were included in the Draft PEIR and the Final PEIR, are applicable
to the proposed project and would reduce potential project impacts related to biological resources
to less than significant levels. These measures as provided include any revisions incorporated in the
Final PEIR.
Mitigation Measure BIO-1: Crotch’s Bumble Bee Surveys. To ensure the proposed project does
not result in direct or indirect impacts to the Crotch’s bumble bee, focused presence/absence surveys
shall be conducted based on the CDFW Survey Considerations for California Endangered Species Act
(CESA) Candidate Bumble Bee Species Guidelines (June 6th, 2023), (CDFW, 2023). Focused surveys
shall be started during the colony active period and when floral resources are present for the species
by a qualified entomologist. Specifically, three surveys shall be conducted with at least two weeks
between surveys from April to June. All regions within the project site where suitable floral resources
are present shall be surveyed by walking meandering transects at least one hour after sunrise and/or
at least two hours before sunset (ideally between 9am and 1pm) on warm sunny days with winds
below eight miles per hour.
Focused surveys shall be conducted for a minimum of one person-hour of searching per three acres
of suitable habitat. Bumble bees shall be captured with a net from blooms, avoiding destruction of
the flower when possible. Each bee shall be carefully transferred into a sterile vial and moved to a
cooler with only one bee per vial to avoid disease spread. The bee shall be kept in the vial for no more
than 10 minutes in ambient temperature before being placed in a cooler as they have a tendency to
over-heat (the amount of time will be decreased on hotter days). The vial shall be placed in a cooler
at a temperature above 25 degrees Fahrenheit, as lower temperatures could freeze and kill the bee.
The results of the focused surveys shall be summarized in a letter report including graphics and
recommendations. At a minimum, the survey letter report shall provide the following:
1. A description and map of the survey area, focusing on areas that could provide suitable
habitat for Crotch’s bumble bee.
2. Field survey conditions that shall include name(s) of qualified entomologist(s) and brief
qualifications; date and time of survey; survey duration; general weather conditions; survey
goals, and species searched.
3. Map(s) showing the location of nests/colonies; and,
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-5
Findings of Fact and Statement of Overriding Considerations January 2026
4. A description of physical (e.g., soil, moisture, slope) and biological (e.g., plant composition)
conditions where each nest/colony is found. A sufficient description of biological conditions,
primarily impacted habitat, shall include native plant composition (e.g., density, cover, and
abundance) within impacted habitat (e.g., species list separated by vegetation class; density,
cover, and abundance of each species).
If the species is detected onsite, the CDFW shall be contacted to determine appropriate conservation
measures to prevent direct/indirect impacts to the species, or acquisition of an Incidental Take
Permit (ITP). To initiate the ITP process, the applicant or representative shall contact the appropriate
CDFW Regional Office and submit a completed ITP application.
Mitigation Measure BIO-2: Focused and Preconstruction Burrowing Owl Surveys. To ensure the
proposed project does not result in direct or indirect impacts to the burrowing owl, focused surveys
shall be conducted in accordance with the March 7, 2012 Staff Report on Burrowing Owl Mitigation
(CDFG, 2012) which recommends both a breeding and non-breeding season survey. Specifically, a
total of four surveys shall be conducted by a qualified avian biologist during the breeding season: 1)
at least one site visit between February 15 and April 15, and 2) a minimum of three surveys, at least
three weeks apart, between April 15 and July 15, with at least one visit after June 15. Non-breeding
season surveys shall include four surveys spread out evenly from July 15 to February 15. A report of
the findings prepared by a qualified biologist shall be submitted to the City of Redlands prior to any
permit or approval for ground disturbing activities.
Regardless of the findings of the focused surveys, a burrowing owl preconstruction survey shall be
conducted no less than 14 days prior to the initiation of ground-disturbing activities to ensure
protection for this species including a survey conducted with 24 hours of start of work. The
preconstruction surveys shall be conducted in compliance with CDFW guidelines (CDFG, 2012). A
report of the findings prepared by a qualified biologist shall be submitted to the City of Redlands
prior to any permit or approval for ground disturbing activities. If burrowing owls are not detected
onsite, the proposed project may proceed. However, if project initiation is delayed more than 14 days,
updated preconstruction surveys may be required.
If burrowing owls are detected onsite during the focused or preconstruction surveys, a burrowing
owl monitoring and/or relocation plan shall be developed and approved by the City of Redlands,
CDFW and USFWS prior to any permit or approval for ground disturbing activities. At a minimum,
the plan shall include the following:
1. Burrowing owl status, distribution, and habitat utilization within and adjacent to the project
site.
2. Conservation objectives and goals developed in cooperation with CDFW and USFWS.
3. Results of burrowing owl monitoring activities.
a. 350-foot minimum protective (no work) zone shall be designated around each of the
occupied burrow sites and delineated by orange silt fencing. The installation of the
fencing shall be monitored by a qualified biologist to ensure owls are not directly or
indirectly impacted as a result of fence installation. The monitoring biologist will also be
responsible for directing where the fencing shall be installed.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-6
Findings of Fact and Statement of Overriding Considerations January 2026
b. A qualified monitoring biologist shall monitor the owls weekly during the non-breeding
season to determine if the 350-foot protective zone is adequate for their protection. The
weekly monitoring events will also provide critical information regarding the status of
the species onsite for purposes of developing a relocation plan.
c. A qualified monitoring biologist shall conduct an initial environmental briefing with any
contractors which will be working onsite. The briefing shall include a discussion of
burrowing owl natural history, identification of burrowing owl non-breeding season
protection zones, and summary of penalties for directly and/or indirectly impacting the
species.
d. A qualified monitoring biologist shall be authorized to stop all work activities in the event
potential direct and/or indirect impacts to burrowing owl may occur as a result of
proposed staging activities.
e. Monthly updates on the monitoring efforts including recommendations, as warranted,
shall be submitted to the City of Redlands, CDFW and USFWS.
4. Passive and/or active relocation activities.
5. Burrowing owl management activities for active relocation sites.
Based on the candidacy or listing status of the species at the time of surveys, if detected, acquisition
of an Incidental Take Permit may also be required.
Mitigation Measure BIO-3: Pre-Construction Breeding Bird Survey. To maintain compliance with
the MBTA and California Fish and Game Code §§ 3503, 3503.5, and 3513, and to avoid impacts or
take of migratory non-game breeding birds and other native birds, their nests, young, and eggs, the
following measures shall be implemented.
Site preparation activities (ground disturbance, construction activities, staging equipment, and/or
removal of trees and vegetation) for the project shall be avoided, to the greatest extent possible,
during the nesting season of potentially occurring native and migratory bird species (generally
September 15 to February 15 for songbirds; September 1 to January 14 for raptors, although the
nesting season may be extended due to weather and drought conditions).
If site preparation activities are proposed during the nesting/breeding season, the project proponent
shall retain a qualified avian biologist to conduct a pre-activity field survey prior to the issuance of
grading permits for the project to determine if active nests of species protected by the MBTA or the
California Fish and Game Codes are present in the construction zone. The nest surveys shall include
the project site where project activities have the potential to cause nest failure. The survey results
shall be provided to the City of Redlands for review and approval. The project applicant shall adhere
to the following:
1. The project applicant shall retain a qualified biologist experienced in: identifying local and
migratory bird species of special concern; conducting bird surveys using appropriate survey
methodology; nesting surveying techniques, recognizing breeding and nesting behaviors,
locating nests and breeding territories, and identifying nesting stages and nest success;
determining/establishing appropriate avoidance and minimization measures; and
monitoring the efficacy of implemented avoidance and minimization measures.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-7
Findings of Fact and Statement of Overriding Considerations January 2026
2. Pre-activity field surveys shall be conducted at the appropriate time of day/night, during
appropriate weather conditions, no more than three days prior to the initiation of project
activities. Surveys shall encompass all suitable areas including trees, shrubs, bare ground,
burrows, cavities, and structures. Survey duration shall take into consideration the size of the
property; density, and complexity of the habitat; number of survey participants; survey
techniques employed; and shall be sufficient to ensure the data collected is complete and
accurate.
If no nesting birds are observed during the survey, site preparation and construction activities may
begin. However, if active nests (including nesting raptors) are located, then avoidance or
minimization measures shall be undertaken in consultation with the City of Redlands, CDFW and
USFW, as warranted. Measures shall include immediate establishment of an appropriate buffer zone
to be established by a qualified biologist based on their best professional judgement and experience.
The buffer around the nest shall be delineated and flagged, and no construction activity shall occur
within the buffer area until a qualified biologist determines nesting species have fledged and the nest
is no longer active, or the nest has failed. The biologist shall monitor the nest at the onset of project
activities and at the onset of any changes in such project activities (e.g., increase in number or type
of equipment, change in equipment usage, etc.) to determine the efficacy of the buffer. If the biologist
determines that such project activities may be causing an adverse reaction, the biologist shall adjust
the buffer accordingly or implement alternative avoidance and minimization measures, such as
redirecting or rescheduling construction or erecting sound barriers. All work within these buffers
will be halted until the nesting effort is finished (i.e., the juveniles are surviving independent from
the nest). The onsite biologist shall review and verify compliance with these nesting avoidance
buffers and shall verify the nesting effort has finished. Work can resume within these avoidance areas
when no other active nests are found.
Birds or their active nests will not be disturbed, captured, handled, or moved. Active nests cannot be
removed or disturbed; however, nests can be removed or disturbed if determined inactive by a
qualified biologist.
If listed bird species are observed within a project site during the preconstruction survey, the
biologist will immediately map the area and notify the appropriate resource agency to determine
suitable protection measures and/or mitigation measures and to determine if additional mitigation
is necessary. Project activities may begin within the area only when concurrence is received from the
appropriate resource agency.
Upon completion of the survey and nesting bird monitoring, a report shall be prepared and submitted
to City of Redlands for review and approval prior to initiation of construction activities.
Mitigation Measure BIO-4: Preconstruction Bat Survey. Prior to implementation of project
activities, a qualified bat biologist shall be retained to determine whether potential roosting sites for
yellow bats may be affected. For large ornamental trees and palms suitable for bat roosting/nursery,
exit counts and acoustic surveys shall be performed prior to initial ground disturbance, vegetation,
or structure removal to determine whether the project site and a 300-foot buffer supports a nursery
or roost. This work will occur between late -spring and late summer and/or in the fall (generally mid-
March through late October).
If the results of the bat survey find a total of a single roosting individual of a special status bat species
or 25 or more individuals of a non-special status bat species with potential to be present in the project
site, a Bat Management Plan shall be developed by a qualified bat biologist to ensure mortality to bats
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-8
Findings of Fact and Statement of Overriding Considerations January 2026
does not occur. For each location confirmed to be occupied by bats, the Bat Management Plan must
provide details both in text and graphically where exclusion devices/and or staged tree/palm
removal will need to occur, the timing for exclusion work and the timeline and methodology needed
to exclude the bats. The plan will need to be reviewed and approved by the City of Redlands and
CDFW prior to disturbance of the roosts. The Bat Management Plan shall include:
1. Bat status, distribution, and habitat information within and adjacent to the project site.
2. Results of the bat surveys.
3. Project-specific measures for noise attenuation devices, acoustic and visual monitoring
during high-vibration and sound activities (such as saw cutting, jackhammering, and pile
driving), visual disturbance buffers, and the installation of bat exclusion devices to safely and
humanely evict bats outside of the maternity season, in the event they are needed.
4. Exclusion methods may include use of one-way doors at roost entrances (bats may leave, but
not reenter), or sealing roost entrances when the site can be confirmed to contain no bats.
Exclusion efforts may be restricted during periods of sensitive activity (e.g., during
hibernation or while females in maternity colonies are nursing young).
5. If roosts cannot be avoided or it is determined that construction activities may cause roost
abandonment, such activities may not commence until permanent, elevated bat houses have
been installed outside of, but near the construction area. Placement and he ight will be
determined by a qualified wildlife biologist, but the height of bat house will be at least 15 feet.
Bat houses will be multi-chambered and be purchased or constructed in accordance with
CDFW standards. The number of bat houses required will be dependent upon the size and
number of colonies found, but at least one bat house will be installed for each pair of bats (if
occurring individually), or of sufficient number to accommodate each colony of bats to be
relocated.
6. Consultation with the California Department of Fish and Wildlife would occur to finalize
preparation of the Bat Management Plan for inclusion in other permits that are required from
the CDFW, such as a Lake or Streambed Alteration Agreement (LSAA) under Section 1600-
1616 of the Fish and Game Code. Each LSAA usually contains a section titled Measures to
Protect Fish and Wildlife Resources, for which this plan would be incorporated.
7. A description of incidental monitoring and reporting that will take place during construction.
8. Details for post-construction monitoring.
9. Note that the Bat Management Plan is triggered only if the project requires high-vibration
and sound activities causing shaking or vibration, generally resulting from saw cutting,
jackhammering, pile driving, or similar activities (within 150 feet of a bat colony).
Mitigation Measure BIO-5: Jurisdictional Delineation and Permitting. Prior to approval of
grading permits and initiation of project activities, a qualified biologist shall conduct a formal
jurisdictional delineation on the project site to determine the presence/absence of jurisdictional
resources, extent of jurisdictional areas, and impacts to resources regulated by the USACE, RWQCB,
and CDFW. The delineation shall be conducted using the current USACE methods and definition
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-9
Findings of Fact and Statement of Overriding Considerations January 2026
of “waters of the U.S.” (most current as of this writing is March 2025 notice and data sheets) and the
methods and wetland definitions specified in the California State Wetland Definition and Procedures
for Discharges of Dredged or Fill Material to Waters of the State (Procedures) (SWRCB, 2019) to
delineate waters of the state.
Upon completion of the jurisdictional delineation survey, a jurisdictional delineation report shall be
prepared according to the Minimum Standards for Acceptance of Aquatic Resources Delineation
Reports for the USACE, Los Angeles Regulatory District (USACE-LA, 2017). This report shall be
submitted to City of Redlands for review and approval.
If jurisdictional areas are present on the project site, the project applicant shall obtain a Clean Water
Act Section 404 permit, California Fish and Game Code Section 1602 Lake or Streambed Alteration
Agreement from CDFW and a CWA 401 or WDR permit issued by the RWQCB (Santa Ana RWQCB-
Region 8) pursuant to the California Water Code § 13260, as warranted. If required, these permits
shall be obtained prior to issuance of a grading permit. Construction activities (including but not
limited to fencing, staging, and clearing) will not commence unless all requirements of the USACE,
CDFW, RWQCB have been met and the RWQCB has issued a WDR permit, letter of permission, or
other project-specific approval. All conditions of these permits shall be adhered to during pr oject
development.
(see Draft and Final PEIR — §§4.3, 11).
6.2.2 Biological Resource Threshold A (special status species)
Threshold a): Would the project have a substantial adverse effect, either directly or through habitat
modifications, on any species identified as a candidate, sensitive, or special status species in local or
regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S.
Fish and Wildlife Service?
The site is largely disturbed, with only small areas of marginal habitat that could support certain
special-status wildlife species such as burrowing owl, nesting birds/raptors, bats, and Crotch’s
bumble bee. No federal or state listed species or critical habitat occur onsite. With implementation of
required biological pre-construction surveys, avoidance buffers, seasonal timing, and species-
specific protection measures (MM BIO-1 through MM BIO-4), the project would avoid or minimize
potential direct disturbance to special-status species. Therefore, impacts would be less than
significant with mitigation. (see Draft and Final PEIR — §4.3).
6.2.2.1 Findings
Substantial evidence in the administrative record, including the Draft PEIR (Section 4.3) supports the
conclusion that special-status species may occur in limited disturbed habitats; however,
implementation of MM BIO-1 through MM BIO-4 would ensure avoidance of individuals, active
nests, or roosting/breeding sites, such that potential impacts would be reduced to less than
significant levels and the project would not result in a substantial adverse effect on special-status
species. The City finds that the MM BIO-1 through MM BIO-4 are feasible, will reduce the potential
biological resource impacts of the proposed project to less-than-significant levels, and are adopted
by the City. Accordingly, the City finds, that pursuant to PRC Section 21081(a)(1), and the CEQA
Guidelines Section 15091(a)(1), changes or alterations have been required in, or incorporated into,
the proposed project, which avoid or substantially lessen the significant environmental effect as
identified in the Final PEIR.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-10
Findings of Fact and Statement of Overriding Considerations January 2026
6.2.2.2 Facts in Support of Findings
The project site consists primarily of previously developed and disturbed land, with only small
patches of marginal habitat that could potentially support special-status species such as burrowing
owl, nesting birds and raptors, bats, and Crotch’s bumble be e. Biological field surveys conducted for
the Draft PEIR did not detect any federally or state-listed species or designated critical habitat on-
site. However, to address the potential for presence of other sensitive species, the project includes
implementation of MM BIO-1 through MM BIO-4, which require pre-construction biological surveys,
establishment of species-appropriate avoidance buffers, restrictions on timing of construction to
avoid nesting or breeding seasons, and protective measures if individuals or habitat use is confirmed.
These mitigation measures ensure that the project would avoid or substantially reduce the risk of
direct or indirect disturbance to any special-status wildlife, resulting in less than significant impacts.
(see Draft and Final PEIR — §4.3).
6.2.2.3 Cumulative Impacts
The South Coast region has experienced widespread urbanization and habitat fragmentation,
contributing cumulatively to the decline of native biological resources. The proposed project is
located on a previously disturbed site within an urbanized context and does not contain critical
habitat or high-value ecological corridors. As documented in the Draft PEIR (Section 4.3), the project
site supports only marginal and patchy habitat for special-status species such as burrowing owl,
nesting birds/raptors, bats, and Crotch’s bumble bee.
The project would not substantially contribute to regional cumulative biological impacts because:
• No federal- or state-listed species or designated critical habitat would be affected.
• The project’s impacts are localized and avoidable with implementation of mitigation
measures MM BIO-1 through MM BIO-4, which require pre-construction surveys, avoidance
buffers, seasonal timing restrictions, and protection protocols if species are encountered.
Therefore, the project’s incremental contribution to cumulative biological resource degradation is
not considered cumulatively considerable under CEQA.
6.2.3 Biological Resource Threshold B (sensitive natural community)
Threshold b): Would the project have a substantial adverse effect on any riparian habitat or other
sensitive natural community identified in local or regional plans, policies, regulations or by the
California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
The project would remove disturbed land and a small area of mule fat scrub within an existing
detention basin that may qualify as riparian habitat. No other sensitive natural communities are
present. To ensure protection and compliance with resource agency requirements, a jurisdictional
delineation and permitting will be completed, and avoidance/minimization measures implemented
as necessary (MM BIO-5). With these measures, potential adverse effects on riparian habitat would
be reduced to less than significant. (see Draft and Final PEIR — §4.3).
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-11
Findings of Fact and Statement of Overriding Considerations January 2026
6.2.3.1 Findings
Substantial evidence in the administrative record demonstrates that any riparian vegetation impacts
would be minimized, resource compliance requirements would be implemented through MM BIO-5,
and impacts to sensitive natural communities would be less than significant with mitigation. The City
finds that the MM BIO-5 is feasible, will reduce the potential biological resource impacts of the
proposed project to less-than-significant levels, and is adopted by the City. Accordingly, the City finds,
that pursuant to PRC Section 21081(a)(1), and the CEQA Guidelines Section 15091(a)(1), changes or
alterations have been required in, or incorporated into, the proposed project, which avoid or
substantially lessen the significant environmental effect as identified in the Final PEIR.
6.2.3.2 Facts in Support of Findings
The project would remove a small area of mule fat scrub located within a disturbed detention basin
that may qualify as riparian habitat, although no other sensitive natural communities are present on-
site. As required by MM BIO-5, a formal jurisdictional delineation will be conducted to confirm the
extent of any riparian features. Based on the results, the project will obtain all applicable regulatory
permits and implement avoidance and minimization measures consistent with agency requirements.
These actions will ensure compliance with federal and state resource protection laws and avoid or
minimize impacts to riparian vegetation. Therefore, potential adverse effects on sensitive natural
communities, including riparian habitat, would be reduced to less than significant. (see Draft and
Final PEIR — §4.3).
6.2.3.3 Cumulative Impacts
Cumulative impacts to riparian habitat and sensitive natural communities in the South Coast region
are generally associated with continued land conversion, stream channelization, and loss of
hydrologically connected features due to urban development. These effects can degrade watershed
function and reduce regional habitat connectivity.
The Kaiser Permanente Redlands Medical Center project would result in removal of a small area of
disturbed mule fat scrub within a detention basin that may qualify as riparian habitat. No other
sensitive natural communities are present on-site. This localized impact, while minimal, is addressed
by MM BIO-5, which requires jurisdictional delineation, regulatory permitting (e.g., Clean Water Act
Section 404 or Fish and Game Code §1602), and implementation of avoidance or compensatory
mitigation as needed.
6.2.4 Biological Resource Threshold C (protected wetlands)
Threshold c): Would the project have a substantial adverse effect on state or federally protected
wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal,
filling, hydrological interruption, or other means?
Limited areas on-site may meet federal and/or State jurisdictional definitions. Any disturbance could
result in a potentially significant impact absent mitigation. A formal jurisdictional delineation and
any necessary regulatory permits (e.g., Clean Water Act §§ 404/401, Fish and Game Code §1602) will
be secured prior to grading (MM BIO-5). With implementation of required regulatory approvals and
compliance measures, impacts to jurisdictional waters would be reduced to less than significant. (see
Draft and Final PEIR — §4.3).
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-12
Findings of Fact and Statement of Overriding Considerations January 2026
6.2.4.1 Findings
Substantial evidence in the administrative record, including the Draft PEIR (Section 4.3) confirms
that jurisdictional resources may occur within the proposed construction footprint; however, MM
BIO-5 ensures agency coordination, regulatory compliance, and implementation of required best
practices. With mitigation, impacts would be less than significant. The City finds that the MM BIO-5
is feasible, will reduce the potential biological resource impacts of the proposed project to less-than-
significant levels, and is adopted by the City. Accordingly, the City finds, that pursuant to PRC Section
21081(a)(1), and the CEQA Guidelines Section 15091(a)(1), changes or alterations have been
required in, or incorporated into, the proposed project, which avoid or substantially lessen the
significant environmental effect as identified in the Final PEIR.
6.2.4.2 Facts in Support of Findings
The Draft PEIR identifies that limited portions of the project site may contain features that meet
federal or state definitions of jurisdictional waters, such as those regulated under Clean Water Act §§
404 or 401 or § 1602 of the California Fish and Game Code. To address potential impacts, MM BIO-5
requires the preparation of a formal jurisdictional delineation prior to any ground-disturbing
activities. If jurisdictional features are confirmed, the project must obtain applicable permits from
the U.S. Army Corps of Engineers, Regional Water Quality Control Board, and/or California
Department of Fish and Wildlife. These permits will include conditions for avoidance, minimization,
and mitigation of impacts. Compliance with these regulatory requirements ensures that potential
effects to jurisdictional waters are reduced to less than significant. (see Draft and Final PEIR — §4.3).
6.2.4.3 Cumulative Impacts
At the regional scale, the cumulative loss of wetlands and other jurisdictional waters has significantly
reduced hydrologic function, biodiversity, and flood control capacity in Southern California. Urban
expansion, infrastructure development, and channel modification continue to fragment or degrade
aquatic resources despite existing regulatory frameworks.
The Kaiser Permanente Redlands Medical Center project could potentially affect limited areas that
may qualify as federally or state-protected jurisdictional waters. These features, if present, are
expected to be small, degraded, and isolated within a detention basin setting. As required by MM BIO-
5, the project will complete a formal jurisdictional delineation and obtain all necessary permits under
Clean Water Act Sections 404/401 and California Fish and Game Code Section 1602 prior to grading.
Any adverse effects will be mitigated in accordance with permit conditions, including avoidance,
minimization, or compensatory mitigation measures.
Given the confined scale of potential impacts and the full implementation of regulatory compliance
procedures, the project would not contribute meaningfully to cumulative wetland loss or
hydrological disruption in the region.
6.2.5 Biological Resource Threshold D (wildlife corridors)
Threshold d): Would the project interfere substantially with the movement of any native resident
or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-13
Findings of Fact and Statement of Overriding Considerations January 2026
The project site is surrounded by existing urban development and does not function as a regional
wildlife movement corridor or support wildlife nursery areas. However, vegetation on-site may
provide nesting habitat for Migratory Bird Treaty Act (MBTA)- and Fish and Game Code-protected
birds. To prevent disturbance of active nests, pre-construction nesting bird surveys and avoidance
buffers will be implemented (MM BIO-3). With these measures, potential impacts would be reduced
to a less-than-significant level. (see Draft and Final PEIR — §4.3).
6.2.5.1 Findings
Substantial evidence in the administrative record, including the Draft PEIR’s analyses (Section 4.3),
verifies no essential wildlife corridors or wildlife nursery areas would be affected. With MM BIO-3
ensuring avoidance of take of active nests, impacts to wildlife movement and nursery features would
be less than significant with mitigation. The City finds that the MM BIO-3 is feasible, will reduce the
potential biological resource impacts of the proposed project to less-than-significant levels, and is
adopted by the City. Accordingly, the City finds, that pursuant to PRC Section 21081(a)(1), and the
CEQA Guidelines Section 15091(a)(1), changes or alterations have been required in, or incorporated
into, the proposed project, which avoid or substantially lessen the significant environmental effect as
identified in the Final PEIR.
6.2.5.2 Facts in Support of Findings
Although the project site is within a developed urban area and does not function as a regional wildlife
corridor or support wildlife nursery areas, the existing vegetation could provide suitable nesting
habitat for bird species protected under the MBTA and California Fish and Game Code. To avoid
potential disturbance to active nests, MM BIO-3 requires that a qualified biologist conduct nesting
bird surveys within the appropriate seasonal window prior to any construction activities. If active
nests are found, species-specific no-disturbance buffers will be established and maintained until the
young have fledged. These measures ensure compliance with state and federal protections for
nesting birds and reduce potential impacts to less than significant. (see Draft and Final PEIR — §4.3).
6.2.5.3 Cumulative Impacts
Across the South Coast region, cumulative impacts to wildlife movement corridors and nursery sites
result from progressive habitat fragmentation, roadway expansion, and intensifying urban
development. These pressures limit habitat connectivity and can disrupt critical life-stage behaviors,
particularly for wide-ranging mammals and nesting bird populations.
The Kaiser Permanente Redlands Medical Center site does not contribute to regional wildlife
connectivity due to its urban setting and isolation from natural open space. No designated corridors
or essential linkages traverse or adjoin the site. While some existing vegetation could provide nesting
habitat for birds protected under the Migratory Bird Treaty Act and California Fish and Game Code,
this potential is localized and common in the urban landscape.
With implementation of MM BIO-3—which requires pre-construction nesting bird surveys and
protective no-disturbance buffers—any potential nesting disturbance will be avoided. Given the
site’s developed context and the application of best practices, the project’s contribution to cumulative
disruption of wildlife movement or nursery habitat would be less than cumulatively considerable.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-14
Findings of Fact and Statement of Overriding Considerations January 2026
6.3 Cultural Resources
The proposed Project would have a potentially significant impact related to cultural resources as
follows:
▪ Cultural Resources Threshold A (historical resources)
▪ Cultural Resources Threshold B (archeological resources)
▪ Cultural Resources Threshold C (human remains)
6.3.1 Mitigation Measures
The following mitigation measures were included in the Draft PEIR and the Final PEIR, are applicable
to the proposed project and would reduce potential project impacts related to cultural resources to
less than significant levels. These measures as provided include any revisions incorporated in the
Final PEIR.
Mitigation Measure CUL-1. The project applicant shall retain an archaeologist who meets the
Secretary of the Interior’s Professional Qualifications Standards for Archaeology to conduct
monitoring of subsurface ground disturbance during construction activities. The archaeologist s hall
also take the opportunity to re-survey the parcel’s ground surface as the vegetation is cleared for
construction work. If unanticipated cultural resource discoveries are made the archaeologist will be
afforded the necessary time to recover, analyze, and curate the find(s). The qualified archaeologist
will recommend the extent of archaeological monitoring necessary to ensure the protection of any
other resources that may be in the area. Any identified cultural resources shall be recorded on the
appropriate DPR 523 (A-L) form and filed with the Eastern Information Center.
Mitigation Measure CUL-2. If historical or unique archaeological resources are discovered during
construction activities, the contractor shall halt construction activities in a 50-foot radius and notify
the project proponent and the City of Redlands. A Secretary of the Interior qualified archaeologist
(Principal Archaeologist) shall be notified and afforded the necessary time to recover, analyze, and
curate the find(s). The Principal Archaeologist shall recommend the extent of archaeological
monitoring necessary to ensure the protection of any other resources that may be in the area.
Construction activities may continue on other parts of the project site while evaluation and treatment
of historical or unique archaeological resources takes place.
The Principal Archaeologist, depending on the type and extent of the finds, may prepare an
Archaeological Resources Treatment Plan (ARTP) to guide future monitoring, the recovery of cultural
resources, analysis and reporting of the finds, and curation of the finds. The ARTP shall be submitted
to the City and the project proponent for approval. The ARTP shall include the following:
1. Results of the Cultural Resources Inventory: archaeological resources and their condition
and threats on the project site.
2. Impact assessment.
3. Mitigation strategies, which may include:
a. Potential avoidance measures.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-15
Findings of Fact and Statement of Overriding Considerations January 2026
b. Data recovery steps such as excavation and analysis of an archaeological site to collect
information before it is destroyed.
c. Conservation measures such as cleaning, conserving, studying, cataloging, and storing
recovered archaeological materials and associated records.
4. Procedures for archaeological monitoring during construction to record exposed resources.
5. Protocols for unanticipated discoveries: what construction workers should do if they find
cultural resources unexpectedly, including ceasing work and contacting a qualified
archaeologist.
6. Consultation with relevant groups, such as Native American tribes, historians, and regulatory
agencies, to determine the value of resources and appropriate treatment measures.
7. Documenting and reporting format and procedures.
Mitigation Measure CUL-3. If human remains are encountered during excavations associated with
this project, all work shall stop within a 30-foot radius of the discovery, and the San Bernardino
County Coroner will be notified (§ 5097.98 of the Public Resources Code). The Coroner will determine
whether the remains are recent human origin or older Native American ancestry. If the coroner, with
the aid of the supervising archaeologist, determines that the remains are prehistoric, they will contact
the Native American Heritage Commission (NAHC). The NAHC will be responsible for designating the
Most Likely Descendant (MLD). The MLDS (either an individual or sometimes a committee) will be
responsible for the ultimate disposition of the remains, as required by § 705 0.5 of the California
Health and Safety Code. The MLD will make recommendations within 24 hours of their notification
by the NAHC. These recommendations may include scientific removal and nondestructive analysis of
human remains and items associated with Native American burials (§ 7050.5 of the Health and Safety
Code).
(see Draft and Final PEIR — §§4.4, 11).
6.3.2 Cultural Resources Threshold A (historical resources)
Would the project:
Threshold a): Would the project cause a substantial adverse change in the significance of a historical
resource pursuant to § 15064.5?
Buildings or features onsite qualify as historical resources under CEQA. Although the potential for
previously unknown subsurface materials is low, ground disturbance could encounter buried
resources. MM CUL-1 and MM CUL-2 require qualified monitoring and treatment of unanticipated
discoveries consistent with CEQA and professional preservation standards. (see Draft and Final PEIR
— §4.4).
6.3.2.1 Findings
Substantial evidence in the administrative record demonstrates that although no historical resources
are present on the site, inadvertent discovery of buried resources remains possible. Implementation
of MM CUL-1 and MM CUL-2 would ensure qualified oversight and compliance with established
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-16
Findings of Fact and Statement of Overriding Considerations January 2026
discovery and treatment procedures, reducing impacts to less than significant with mitigation
incorporated. The City finds that the MM CUL-1 and MM CUL-2 are feasible, will reduce the potential
cultural resource impacts of the proposed project to less-than-significant levels, and are adopted by
the City. Accordingly, the City finds, that pursuant to PRC Section 21081(a)(1), and the CEQA
Guidelines Section 15091(a)(1), changes or alterations have been required in, or incorporated into,
the proposed project, which avoid or substantially lessen the significant environmental effect as
identified in the Final PEIR.
6.3.2.2 Facts in Support of Findings
The Draft PEIR confirms that no buildings or surface features on the project site qualify as historical
resources under CEQA. However, due to the possibility of encountering previously unknown buried
cultural materials during ground disturbance, the project includes MM CUL-1, requiring
archaeological monitoring by a qualified professional during initial grading, and MM CUL -2, which
outlines procedures for the evaluation and treatment of any inadvertent discoveries. These measures
are consistent with CEQA Guidelines and Secretary of the Interior’s Standards for Archaeological
Documentation and ensure that any potential impacts to cultural resources are properly managed
and mitigated to a less-than-significant level. (see Draft and Final PEIR — §4.4).
6.3.2.3 Cumulative Impacts
Cumulative impacts to historical resources may occur when multiple projects in a region result in the
collective loss of built environment features or buried cultural deposits that contribute to local or
regional heritage. In older urbanizing areas such as Redlands, cumulative degradation is of concern
where historic structures or archaeological contexts are not adequately identified, preserved, or
documented.
The Kaiser Permanente Redlands Medical Center project site contains no identified historical
resources as defined under CEQA Guidelines §15064.5. However, due to the potential for
undiscovered subsurface cultural materials, mitigation measures MM CUL-1 and MM CUL-2 require
archaeological monitoring and establish procedures for treatment of inadvertent finds.
Because the project does not remove or alter any documented historical resources and includes
measures to ensure proper handling of any buried materials that may be revealed during ground
disturbance, it would not contribute to a cumulatively considerable loss of historical resources in the
region.
6.3.3 Cultural Resources Threshold B (archeological resources)
Threshold b): Would the project cause a substantial adverse change in the significance of an
archaeological resource pursuant to § 15064.5?
Background research indicates a low likelihood of encountering archaeological resources due to
prior disturbance on the site. However, unknown subsurface archaeological materials could be
uncovered during excavation. The project includes MM CUL-1 and MM CUL-2, which require
archaeological monitoring where warranted, work stoppage procedures, and appropriate treatment
if resources are discovered. (see Draft and Final PEIR — §4.4).
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-17
Findings of Fact and Statement of Overriding Considerations January 2026
6.3.3.1 Findings
Substantial evidence in the administrative record demonstrates that while the probability of
archaeological finds is low, inadvertent discovery remains possible during excavation. MM CUL-1
and MM CUL-2 ensure proper evaluation and preservation measures consistent with CEQA
Guidelines §15064.5, reducing potential impacts to less than significant with mitigation
incorporated. The City finds that the MM CUL-1 and MM CUL-2 are feasible, will reduce the potential
cultural resource impacts of the proposed project to less-than-significant levels, and are adopted by
the City. Accordingly, the City finds, that pursuant to PRC Section 21081(a)(1), and the CEQA
Guidelines Section 15091(a)(1), changes or alterations have been required in, or incorporated into,
the proposed project, which avoid or substantially lessen the significant environmental effect as
identified in the Final PEIR.
6.3.3.2 Facts in Support of Findings
Although previous disturbance reduces the likelihood of encountering archaeological resources on
the project site, the Draft PEIR acknowledges the potential for inadvertent discovery of buried
materials during excavation and grading activities. MM CUL-1 requires archaeological monitoring by
a qualified professional in areas where excavation could encounter native soils, while MM CUL-2
mandates immediate work stoppage, evaluation by a qualified archaeologist, and implementation of
appropriate treatment measures if cultural resources are found. These protocols align with CEQA
Guidelines §15064.5 and ensure any discovered archaeological materials are handled in a manner
that avoids or substantially lessens impacts, resulting in a less-than-significant impact with
mitigation incorporated. (see Draft and Final PEIR — §4.4).
6.3.3.3 Cumulative Impacts
Cumulative impacts to archaeological resources may result when successive development across a
region disturbs or destroys subsurface cultural materials without adequate identification or
treatment. This is particularly critical in areas where archaeological sensitivity is not fully mapped
or where project-specific assessments fail to include appropriate discovery protocols.
For the Kaiser Permanente Redlands Medical Center project, although prior disturbance reduces the
likelihood of encountering intact archaeological resources, there remains potential for inadvertent
discovery during excavation. Mitigation Measures MM CUL-1 and MM CUL-2 require archaeological
monitoring and treatment protocols in accordance with CEQA Guidelines §15064.5.
Because the project incorporates industry-standard discovery procedures and professional
oversight, it ensures that any inadvertent finds will be managed in a way that avoids substantial loss
of archaeological context. Therefore, the project would not make a cumulatively considerable
contribution to regional archaeological resource degradation.
6.3.4 Cultural Resources Threshold C (human remains)
Threshold c): Would the project disturb any human remains, including those interred outside of
dedicated cemeteries?
There are no known burial sites or cemeteries within the project boundaries, and the site has been
previously disturbed. However, the possibility of encountering unknown human remains during
ground-disturbing activities cannot be fully dismissed. MM CUL-3 requires that if human remains
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-18
Findings of Fact and Statement of Overriding Considerations January 2026
are discovered, work shall immediately cease, a qualified archaeologist shall evaluate the find, and
the County Coroner and Native American Heritage Commission shall be notified and procedures
under state law followed. (see Draft and Final PEIR — §4.4).
6.3.4.1 Findings
Based on substantial evidence in the administrative record, implementation of MM CUL-3 ensures
that, if any human remains are encountered, proper respectful handling and statutory requirements
are followed. Therefore, impacts related to disturbance of human remains would be less than
significant with mitigation incorporated. The City finds that the MM CUL-3 is feasible, will reduce the
potential cultural resource impacts of the proposed project to less-than-significant levels, and is
adopted by the City. Accordingly, the City finds, that pursuant to PRC Section 21081(a)(1), and the
CEQA Guidelines Section 15091(a)(1), changes or alterations have been required in, or incorporated
into, the proposed project, which avoid or substantially lessen the significant environmental effect as
identified in the Final PEIR.
6.3.4.2 Facts in Support of Findings
The Draft PEIR confirms that there are no known cemeteries or documented burial sites within the
project area and that the site has been subject to prior disturbance, reducing the likelihood of
encountering human remains. However, given the inherent uncertainty in subsurface conditions, MM
CUL-3 has been included to address the potential discovery of human remains during ground-
disturbing activities. This measure requires that all work stop immediately if remains are found, a
qualified archaeologist evaluate the discovery, and that the San Bernardino County Coroner and, if
necessary, the Native American Heritage Commission (NAHC) be notified. Procedures outlined in
California Health and Safety Code §7050.5 and Public Resources Code §5097.98 will be followed to
ensure respectful and lawful treatment of any human remains. These actions reduce the potential for
significant impacts to less than significant with mitigation incorporated. (see Draft and Final PEIR —
§4.4).
6.3.4.3 Cumulative Impacts
Cumulative impacts related to the disturbance of human remains can occur when development
activities across a region increase the risk of unintentional discoveries, particularly in areas with
undocumented or ancestral burial sites. Without adequate protocols, such discoveries can result in
the irreversible loss of cultural knowledge and violate statutory and cultural obligations.
The Kaiser Permanente Redlands Medical Center project site contains no known cemeteries or
mapped burial locations and has undergone previous ground disturbance. However, because the
potential for encountering unknown human remains cannot be entirely ruled out, the project
includes MM CUL-3, which requires compliance with California Health and Safety Code §7050.5 and
Public Resources Code §5097.98 in the event of a discovery.
With these safeguards in place including immediate work stoppage, evaluation by a qualified
archaeologist, and coordination with the County Coroner and the Native American Heritage
Commission as appropriate the project would not contribute to a cumulatively considerable impact
on cultural resources involving human remains.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-19
Findings of Fact and Statement of Overriding Considerations January 2026
6.4 Geology and Soils
The proposed Project would have a potentially significant impact related to geology and soils as
follows:
▪ Geology and Soils Threshold F (paleontological resources)
6.4.1 Mitigation Measures
The following mitigation measures were included in the Draft PEIR and the Final PEIR, are applicable
to the proposed project and would reduce potential project impacts related to geology and soils to
less than significant levels. The measures as provided include any revisions incorporated in the Final
PEIR.
Mitigation Measure GEO-1. A qualified paleontologist, approved by the City of Redlands and the
Western Science Center, must be retained prior to excavation and grading activities at the project
site.
Prior to the earth-moving activities, the paleontologist shall develop a site-specific Paleontological
Resources Impact Mitigation Program (PRIMP) to be implemented in support of the Project in order
to mitigate potential adverse impacts to paleontological resources. The PRIMP shall follow guidelines
developed by the Society for Vertebrate Paleontology and include monitoring of ground disturbance
activities in sediments that are likely to include paleontological resources, specimen recovery, and
screen washing; preparation of any collected specimens to the point of identification; curation of any
collected specimens to a museum repository with permanent, retrievable storage; and preparation
of a final paleontological survey report that would provide details of monitoring, fossil identification,
and repository arrangements. The Project Applicant shall then comply with the recommendations of
the Project Paleontologist and requirements of the PRIMP. At a minimum, the PRIMP shall include
the following:
1. Project and location
2. Regulatory setting
3. Geology of the site
4. Paleontological resources and survey results
5. Paleontological sensitivity of the site
6. Paleontological resources mitigation and monitoring measures such as:
a. Coordination with construction personnel and training
b. Details of training and materials
c. Frequency and location of inspections
d. When and how grading/excavation activities will be diverted
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-20
Findings of Fact and Statement of Overriding Considerations January 2026
e. Procedures of fossil recovery, removal, treatment, transport, and deposition facility
f. Recording, documentation, and reporting procedures
Before the mitigation program begins, the paleontologist or monitor must coordinate with the
appropriate construction contractor personnel to provide information regarding the requirements
of the City or Redlands, as applicable, for the protection of paleontological resources. Contractor
personnel shall be briefed on the procedures to follow in the event that fossil remains, and a
previously unrecorded fossil site are encountered by earth-moving activities, particularly when the
monitor is not on site.
The qualified paleontologist shall perform periodic inspections of excavation and grading activities
at the project site to determine the presence of fossiliferous soils. The frequency and location of
inspections shall be specified in the PRIMP and will depend on the depth of excavation and grading
activities and the materials being excavated. If paleontological materials are encountered, the
paleontologist must temporarily divert or redirect the grading and excavation activities in the area
of the exposed material to facilitate evaluation and, if necessary, salvage. The authority of the
paleontologist to temporarily halt construction in part of the project site must be included in the
project grading and construction plans. A copy of the report of the paleo ntological survey is
submitted to the Western Science Center. Any fossils recovered during mitigation shall be deposited
in an accredited and permanent scientific institution for the benefit of current and future generations.
(see Draft and Final PEIR — §§4.6, 11).
6.4.2 Geology and Soils Threshold F (paleontological resources)
Would the Project:
Threshold f): Would the project directly or indirectly destroy a unique paleontological resource or
site or unique geologic feature?
The project site is underlain primarily by Holocene alluvial deposits with low potential for
paleontological resources; however, deeper ground disturbance could encounter older, scientifically
significant materials. The project incorporates project design feature (PDF) PDF-GEO-1, requiring
adherence to all recommendations in the Geotechnical Investigation Report, and MM-GEO-1, which
mandates professional paleontological monitoring, fossil recovery, and curation if resources are
uncovered. Implementation of these measures will ensure that any unanticipated discoveries are
properly managed and preserved, reducing potential impacts to less than significant. (see Draft and
Final PEIR — §4.6).
6.4.2.1 Findings
Substantial evidence in the administrative record supports that although the potential for
encountering paleontological resources is low at shallow depths, deeper excavation could encounter
older, potentially significant fossil-bearing strata. Implementation of PDF-GEO-1 and MM GEO-1
requires professional monitoring, discovery protocols, and curation of fossil material consistent with
CEQA Guidelines Appendix G, ensuring that any unanticipated discoveries are properly protected and
managed. Therefore, impacts to paleontological resources under CEQA Geology and Soils Threshold
(f) would be less than significant with mitigation incorporated. The City finds that MM GEO-1 is
feasible, will reduce the potential geology and soils-related impacts of the proposed project to less-
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-21
Findings of Fact and Statement of Overriding Considerations January 2026
than-significant levels, and is adopted by the City. Accordingly, the City finds, that pursuant to PRC
Section 21081(a)(1), and the CEQA Guidelines Section 15091(a)(1), changes or alterations have been
required in, or incorporated into, the proposed project, which avoid or substantially lessen the
significant environmental effect as identified in the Final PEIR.
6.4.2.2 Facts in Support of Findings
The Draft PEIR identifies that while the project site is primarily underlain by recent Holocene alluvial
deposits with low potential for paleontological sensitivity, deeper excavations may reach older
geologic units that could contain scientifically significant fossil resources. To address this, PDF-GEO-
1 ensures appropriate excavation and safety practices. by requiring the following:
PDF-GEO-1: The project would implement all geotechnical recommendations for the development
of the site, including earthwork, seismic design, retaining walls, shoring, and foundation design as
specified in the Geotechnical Investigation Report prepared for the Medical Office Building 2 (MOB
2) project at the Kaiser Redlands site located at 1301 California Street in Redlands. Prepared by
Twining, dated March 31, 2023; provided in Appendix D7 of the PEIR.
Additionally, MM GEO-1 requires monitoring by a qualified paleontologist during ground-disturbing
activities below the upper disturbed layers, with provisions for the recovery, documentation, and
curation of any fossil materials encountered. These measures align with CEQA Guidelines Appendix
G and professional standards, ensuring that any unanticipated paleontological discoveries are
adequately managed and protected, thereby reducing potential impacts to less than significant. (see
Draft and Final PEIR — §§ 1, 4.6).
6.4.2.3 Cumulative Impacts
Cumulative impacts to paleontological resources can arise when multiple development projects
across a region involve deep excavation in fossil-bearing geologic formations without proper
monitoring or recovery protocols. Over time, such activities can lead to the incremental loss of
scientifically important paleontological data and specimens, particularly in areas with known or
potential fossil sensitivity.
The Kaiser Permanente Redlands Medical Center project site has low paleontological sensitivity at
shallow depths due to Holocene alluvium but may encounter deeper fossil-bearing strata during
grading or trenching. Mitigation Measure MM GEO-1 requires paleontological monitoring, fossil
salvage, documentation, and curation if significant resources are discovered. Project Design Feature
PDF-GEO-1 also ensures adherence to geotechnical recommendations that guide excavation
procedures.
Because the project includes proactive and professionally guided measures to avoid, minimize, and
manage any paleontological discoveries, it would not contribute to a cumulatively considerable loss
of paleontological resources in the region.
6.5 Greenhouse Gas Emissions
The proposed Project would have a potentially significant impact related to greenhouse gas
emissions as follows:
▪ Greenhouse Gas Emissions Threshold B (reducing emissions)
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-22
Findings of Fact and Statement of Overriding Considerations January 2026
6.5.1 Mitigation Measures
The following mitigation measures were included in the Draft PEIR and the Final PEIR, are applicable
to the proposed project and would reduce potential project impacts related to greenhouse gas
emissions to less than significant levels. These GHG mitigation measures are taken from the California
Air Pollution Control Officer’s Association’s (CAPCOA)’s Handbook For Analyzing Greenhouse Gas
Emissions. These measures quantify GHG reductions that may be applied in potentially significant
projects and include the range of potential GHG reductions in parentheses. The measures as provided
include any revisions incorporated in the Final PEIR.
Mitigation Measure GHG-1. Using alternative fuels for construction equipment (0 to 22 percent).
Mitigation Measure GHG-2. Using electric or hybrid construction equipment (2.5 to 80 percent of
GHG emissions from equipment that is electric or hybrid if used 100 percent of the time).
Mitigation Measure GHG-3. Limiting construction equipment idling beyond regulation
requirements, which is typically 5 minutes as regulated by the ARB’s Heavy-Duty Vehicle Idling
Emission Reduction Program (percent reduced is equal to (1 – 𝑡𝑚/𝑡𝑏)100, where 𝑡𝑚 is the mitigated
idling period and 𝑡𝑏 is the baseline idling period) (CAPCOA, 2010, p. 429).
Mitigation Measure GHG-4. Instituting a heavy-duty offroad vehicle plan (range of effectiveness is
not applicable because it only ensures compliances with other mitigation measures). At a minimum,
the heavy-duty offroad vehicle plan shall include the following:
1. Fleet reporting and labeling: diesel-fueled vehicles operating in California, with engines 25
horsepower or greater, must be reported to CARB through the online DOORS system and
labeled appropriately.
2. Emission reduction strategies: how you will meet emission reduction requirements by:
a. Retiring/Replacing Vehicles: Phase out older, dirtier engines by replacing them with
new, cleaner ones or equipment that meets the latest emission standards.
b. Engine repowering: plan/schedule to replace older off-road diesel engines with
newer, cleaner ones.
c. Verified Diesel Emission Control Strategies (VDECS): Install verified diesel emission
control strategies (e.g., exhaust retrofits) on existing engines.
3. Fuel acquisition: fleets must begin (2024) using renewable diesel (R99 or R100).
4. Idling restrictions: limit idling to five minutes and apply a written idling policy.
5. Fleet average goals: fleet average emission level standards/balancing emissions from
vehicles.
Mitigation Measure GHG-5. Implementing a construction vehicle inventory tracking system (range
of effectiveness does not reduce GHG emissions in and of itself; it only ensures compliance with other
mitigation measures).
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-23
Findings of Fact and Statement of Overriding Considerations January 2026
(see Draft and Final PEIR — §§4.7, 11).
6.5.2 Greenhouse Gas Emissions Threshold B (reducing emissions)
Would the project:
Threshold b): Would the project conflict with an applicable plan, policy or regulation adopted for
the purpose of reducing the emissions of greenhouse gases?
The project is designed to comply with statewide and local Greenhouse Gas (GHG)-reduction policies,
including Title 24, CALGreen, and the City of Redlands Climate Action Plan. The all -electric building
design, clean on-site energy systems, and transportation demand strategies support continued
consistency with adopted GHG-reduction goals. The project incorporates numerous project design
features (PDF) GHG-PDF-1 through GHG-PDF-9, which reduce GHG emissions through the
promotion of conservation and efficiency, as well as greenhouse gas emission mitigation measures
for construction, MM-GHG-1 through MM-GHG-5, derived from CAPCOA’s Handbook For Analyzing
Greenhouse Gas Emissions. Implementation of MM TRANS-1 through MM TRANS-4 and MM AQ-1
and MM AQ-2 will further reduce operational emissions. With these measures, the project would not
conflict with applicable GHG-reduction plans. and the impacts would be less than significant.
(see Draft and Final PEIR — §§ 1, 4.7).
6.5.2.1 Findings
Based on substantial evidence in the administrative record, the project would comply with applicable
State and City GHG-reduction plans and building energy requirements, as well as incorporate GHG
project design features beyond the minimum requirements of CalGreen (GHG-PDF-1 through GHG-
PDF-9). The project would further incorporate greenhouse gas emission mitigation measures MM-
GHG-1 through MM-GHG-5 which will reduce construction emissions, and operational GHG
emissions would be reduced through implementation of MM TRANS-1 through MM TRANS-4 and
MM AQ-1 and MM AQ-2. As such, the project would not generate GHG emissions that would conflict
with adopted GHG-reduction strategies or result in a cumulatively considerable contribution to
climate change. Impacts would be less than significant with mitigation incorporated.
The City finds that MM GHG-1 through MM GHG-5 are feasible, will reduce the potential greenhouse
gas emission-related impacts of the proposed project to less-than-significant levels, and are adopted
by the City. Accordingly, the City finds, that pursuant to PRC Section 21081(a)(1), and the CEQA
Guidelines Section 15091(a)(1), changes or alterations have been required in, or incorporated into,
the proposed project, which avoid or substantially lessen the significant environmental effect as
identified in the Final PEIR.
6.5.2.2 Facts in Support of Findings
The Draft PEIR confirms that the project incorporates numerous design and operational features
aligned with State and local GHG reduction goals, including compliance with Title 24 building energy
efficiency standards, the CALGreen Code, and the City of Redlands Climate Action Plan. The project’s
all-electric building design, on-site renewable energy generation, and sustainable transportation
measures contribute to minimizing GHG emissions. Additional conservation and efficiency GHG
project design features are proposed beyond the minimum requirements of CalGreen:
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-24
Findings of Fact and Statement of Overriding Considerations January 2026
Energy Conservation and Efficiency
GHG-PDF-1: Project design will provide energy efficiency exceeding Title 24, Part 6, California Energy
Code baseline standard requirements by 10 percent, based on the 2022 Building Energy Efficiency
Standards requirements
GHG-PDF-2: Use of natural heating and cooling features.
GHG-PDF-3: Use of improved insulation.
GHG-PDF-4: Installation of PV panels.
GHG-PDF-5: Use of efficient and durable roofing materials and exterior finishes.
GHG-PDF-6: Use of efficient interior finishes.
Water Conservation
GHG-PDF-7: Water-efficient plumbing fixtures (17 to 31 percent of GHG emissions associated with
non-residential indoor water use).
Solid Waste Conservation
GHG-PDF-8: Use of recycled foundation materials.
Other
GHG-PDF-9: No combustion of natural gas (100 percent reduction in emissions from natural gas use).
With respect to construction emissions, CAPCOA has developed a method of quantifying GHG
reducing measures that may be incorporated into potentially significant projects. These quantifiable
construction mitigation measures (MM GHG-1 through MM GHG-5) and range of potential GHG
reductions in parentheses will be incorporated into this project. These measures reduce GHG
emissions during construction through the use of alternative fuels and electrified or hybrid
construction equipment, limiting idling times, institution of a heavy-duty offroad vehicle plan, and
construction vehicle inventory tracking system.
To further reduce operational GHG emissions, MM TRANS-1 through MM TRANS-4 implement
transportation demand management strategies to lower vehicle miles traveled, while MM AQ-1 and
MM AQ-2 require the use of low-emission landscaping equipment and the provision of electric vehicle
charging infrastructure.
These combined design features and mitigation measures ensure that the project does not conflict
with any applicable GHG-reduction plans and that its contribution to cumulative GHG emissions and
climate change would be less than significant with mitigation incorporated.
(see Draft and Final PEIR — §§ 1, 4.7).
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-25
Findings of Fact and Statement of Overriding Considerations January 2026
6.5.2.3 Cumulative Impacts
Cumulative impacts related to greenhouse gas (GHG) emissions are inherently global in scope.
Projects that fail to align with applicable climate action plans or exceed emission reduction targets
may incrementally contribute to the broader impacts of climate change, including sea level rise,
increased wildfire risk, and extreme weather events. CEQA requires that a project’s GHG emissions
be evaluated for consistency with adopted plans and policies aimed at reducing such emissions
statewide and locally.
The Kaiser Permanente Redlands Medical Center project incorporates building electrification, on-site
renewable energy, and energy-efficient design consistent with Title 24, CALGreen, and the City of
Redlands Climate Action Plan. The project would also incorporate conservation and efficiency GHG
project design features beyond the minimum requirements of CalGreen (GHG-PDF-1 through GHG-
PDF-9). The project would incorporate greenhouse gas emission mitigation measures MM-GHG-1
through MM-GHG-5 which will reduce construction emissions. Operational GHG emissions are
further reduced through transportation demand management (MM TRANS-1 through MM TRANS-4)
and low-emission landscaping equipment and electric vehicle charging requirements (MM AQ-1 and
MM AQ-2).
Because the project is consistent with applicable GHG-reduction policies and does not exceed
relevant efficiency-based thresholds, it would not contribute to a cumulatively considerable GHG
impact or conflict with the regional and statewide framework to combat climate change.
6.6 Tribal Cultural Resources
The proposed Project would have a potentially significant impact related to tribal cultural resources
as follows:
▪ Tribal Cultural Resource Threshold A(i) and A(ii) (CA. Pub. Res Code §§ 5020.1(k), 5024.1(c))
6.6.1 Mitigation Measures
The following mitigation measures were included in the Draft PEIR and the Final PEIR, are applicable
to the proposed project and would reduce potential project impacts related to tribal cultural
resources to less than significant levels. The measures as provided include any revisions
incorporated in the Final PEIR.
MM-TCR-1: Retain a Native American Monitor Prior to Commencement of Ground-Disturbing
Activities
1. The project applicant shall retain a Native American Monitor(s) from one or more Consulting
Tribe(s), including Gabrieleño Band of Mission Indians – Kizh Nation. Monitors from more
than one tribe may coordinate and utilize a rotating schedule at their discretion.. The
monitor(s) shall be retained prior to the commencement of any “ground-disturbing activity”
for the subject project at all project locations (i.e., both on-site and any off-site locations that
are included in the project description/definition and/or required in connection with the
project, such as public improvement work). “Ground-disturbing activity” shall include, but is
not limited to, demolition, pavement removal, potholing, auguring, grubbing, tree removal,
boring, grading, excavation, drilling, and trenching.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-26
Findings of Fact and Statement of Overriding Considerations January 2026
2. A copy of the executed monitoring agreement with each monitoring Consulting Tribe(s),
including Gabrieleño Band of Mission Indians – Kizh Nation, shall be submitted to the lead
agency prior to the earlier of the commencement of any ground-disturbing activity, or the
issuance of any permit necessary to commence a ground-disturbing activity.
3. The monitor(s), including Gabrieleño Band of Mission Indians – Kizh Nation, will complete
daily monitoring logs that will provide descriptions of the relevant ground-disturbing
activities, the type of construction activities performed, locations of ground-disturbing
activities, soil types, cultural-related materials, and any other facts, conditions, materials, or
discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered
TCRs, including but not limited to, Native American cultural and historical artifacts, remains,
places of significance, etc., (collectively, tribal cultural resources, or “TCR”), as well as any
discovered Native American (ancestral) human remains and burial goods. Copies of monitor
logs will be provided to the project applicant/lead agency upon written request to the Tribe,
including Gabrieleño Band of Mission Indians – Kizh Nation.
4. On-site tribal monitoring shall conclude upon the latter of the following (1) written
confirmation to the Consulting Tribe(s) , including Gabrieleño Band of Mission Indians – Kizh
Nation, from a designated point of contact for the project applicant that all ground-disturbing
activities and phases that may involve ground-disturbing activities on the project site or in
connection with the project are complete; or (2) a determination and wri tten notification by
the Consulting Tribe(s) , including Gabrieleño Band of Mission Indians – Kizh Nation, to the
project applicant and lead agency that no future, planned construction activity and/or
development/construction phase at the project site possesses the potential to impact TCRs.
MM-TCR-2: Unanticipated Discovery of Tribal Cultural Resource Objects (Non-Funerary/Non-
Ceremonial)
A. Upon discovery of any TCRs, all construction activities in the immediate vicinity of the
discovery shall cease (i.e. not less than the surrounding 50 feet) and shall not resume until
the discovered TCR has been fully assessed by the Consulting Tribe(s) , including Gabrieleño
Band of Mission Indians – Kizh Nation, monitor(s) and/or archaeologist(s).
MM-TCR-3: Unanticipated Discovery of Human Remains and Less than Native American
Monitor/Project Associated Funerary or Ceremonial Objects.
A. Native American human remains are defined in PRC 5097.98 (d)(1) as an inhumation or
cremation, and in any state of decomposition or skeletal completeness. Funerary objects,
called associated grave goods in Public Resources Code Section 5097.98, are also to be treated
according to this statute.
B. If Native American human remains and/or grave goods are discovered or recognized on the
project site, then Public Resource Code 5097.9 as well as Health and Safety Code Section
7050.5 shall be followed.
C. Human remains and grave/burial goods shall be treated alike per California Public Resources
Code section 5097.98(d)(1) and (2).
D. Preservation in place (i.e., avoidance) is the preferred manner of treatment for discovered
human remains and/or burial goods.
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-27
Findings of Fact and Statement of Overriding Considerations January 2026
E. Any discovery of human remains/burial goods shall be kept confidential to prevent further
disturbance.
(see Draft and Final PEIR — §§4.13, 11).
6.6.2 Tribal Cultural Resource Threshold A(i) and A(ii) (CA. Pub. Res Code §§ 5020.1(k),
5024.1(c))
Threshold a): Would the project cause a substantial adverse change in the significance of a tribal
cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural
landscape that is\ geographically defined in terms of the size and scope of the landscape, sacred place,
or object with cultural value to a California Native American tribe, and that is:
i) Listed or eligible for listing in the California Register of Historical Resources, or in a local
register of historical resources as defined in Public Resources Code § 5020.1(k); or
ii) A resource determined by the lead agency, in its discretion and supported by substantial
evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources
Code § 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code §
5024.1, the lead agency shall consider the significance of the resource to a California Native
American tribe.
Although no tribal cultural resources were identified during the pedestrian survey, a NAHC Sacred
Lands File search returned positive results and tribal outreach indicated cultural sensitivity in
proximity to traditional use areas. Given limited ground visibility and potential for previously
unknown resources, MM TCR-1, MM TCR-2, and MM TCR-3 shall be implemented to ensure
appropriate tribal monitoring, discovery procedures, and avoidance/treatment protocols during
ground disturbance. (see Draft and Final PEIR — §4.13).
6.6.2.1 Findings
Substantial evidence in the administrative record demonstrates that while no known TCRs occur
within the project boundaries, tribal input and Sacred Lands File records confirm that the broader
area is culturally sensitive. MM TCR-1 through MM TCR-3 ensure compliance with AB 52
requirements, timely tribal notification, work stoppage procedures, and preservation/treatment
consistent with tribal preferences. Therefore, potential impacts to tribal cultural resources would be
less than significant with mitigation incorporated. The City finds that the MM TCR-1 through MM
TCR-3 are feasible, will reduce the potential tribal cultural resource impacts of the proposed project
to less-than-significant levels, and are adopted by the City. Accordingly, the City finds, th at pursuant
to PRC Section 21081(a)(1), and the CEQA Guidelines Section 15091(a)(1), changes or alterations
have been required in, or incorporated into, the proposed project, which avoid or substantially lessen
the significant environmental effect as identified in the Final PEIR.
6.6.2.2 Facts in Support of Findings
Although the pedestrian survey of the project site did not identify any specific tribal cultural
resources (TCRs), the Sacred Lands File search conducted by the Native American Heritage
Commission (NAHC) returned positive results, and consultation with tribes under AB 52 indicated
cultural sensitivity in the surrounding area. Due to limited ground surface visibility and the potential
for previously unrecorded subsurface TCRs, the project includes MM TCR-1, requiring a tribal
6.0-POTENTIALLY SIGNIFICANT IMPACTS MITIGATED TO LESS THAN SIGNIFICANT
7214/Kaiser Permanente Redlands Medical Center Page 6-28
Findings of Fact and Statement of Overriding Considerations January 2026
monitor be present during initial ground-disturbing activities; MM TCR-2, which establishes work
stoppage and evaluation protocols if potential TCRs are discovered; and MM TCR-3, ensuring
treatment measures are developed in consultation with affiliated tribes. These mitigation measures
ensure compliance with CEQA and AB 52 requirements and provide a culturally appropriate
framework for the protection and management of any tribal resources that may be encountered,
reducing potential impacts to less than significant with mitigation incorporated. (see Draft and Final
PEIR — §4.13).
6.6.2.3 Cumulative Impacts
Cumulative impacts to tribal cultural resources may result when multiple development projects in
culturally sensitive areas incrementally disturb or destroy landscapes, objects, or places of
significance to California Native American tribes—particularly when appropriate tribal consultation,
monitoring, and treatment protocols are not implemented. Such cumulative degradation can lead to
irreversible loss of cultural heritage and spiritual value.
While no known tribal cultural resources (TCRs) were identified on the Kaiser Permanente Redlands
Medical Center project site, the positive Sacred Lands File result and input received through AB 52
consultation confirm that the surrounding area holds cultural sensitivity. Due to the potential for
unanticipated discoveries during excavation, the project includes MM TCR-1 (tribal monitoring), MM
TCR-2 (work stoppage and evaluation protocols), and MM TCR-3 (treatment in coordination with
consulting tribes).
These mitigation measures ensure tribal involvement in ground-disturbing activities and provide a
culturally respectful framework for discovery and management of any TCRs. As a result, the project
would not result in a cumulatively considerable contribution to the loss or degradation of tribal
cultural resources.
7.0-EFFECTS SIGNIFICANT AND UNAVOIDABLE AFTER MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 7-1
Findings of Fact and Statement of Overriding Considerations January 2026
7.0 ENVIRONMENTAL EFFECTS THAT REMAIN SIGNIFICANT AND UNAVOIDABLE
AFTER MITIGATION
Pursuant to CEQA Guidelines §15126.2 and §15092, this section identifies environmental effects that
would remain significant and unavoidable despite implementation of all feasible mitigation
measures.
Pursuant to Section 21081(a) of the Public Resources Code and Section 15091(a)(1) of the CEQA
Guidelines, the City finds that for each of these significant and unavoidable effects identified in the
Final PEIR, changes or alterations have been required in, or incorporated into, the proposed project
which avoid or substantially lessen the significant environmental effect as identified in the final PEIR.
The City adopts all of the feasible mitigation measures for the project described in the Final PEIR and
as set forth in the Mitigation Monitoring and Reporting Program (MMRP) as conditions of approval
of the project and incorporates those into the project.
However, there are no feasible mitigation measures that will reduce the impact of the proposed
project to less than significant. Therefore, the following impacts would remain significant and
unavoidable after mitigation.
Pursuant to CA. Pub. Res. Code § 21081 and CEQA Guidelines §§ 15093 and 15043, for those
significant impacts that cannot be mitigated to a less than significant level, a public agency may
nevertheless approve the project if the agency first adopts a statement of overriding considerations
setting forth the specific reasons why the agency found that the project's benefits render its
unavoidable adverse environmental effects “acceptable.” In accordance with Section 15093 of the
State CEQA Guidelines, a Statement of Overriding Considerations is set forth below in Section 10 to
substantiate the City’s decision to accept these unavoidable substantial, adverse environmental
effects because of the benefits afforded by the Project.
These findings are explained below and are supported by substantial evidence in the administrative
record, including but not limited to the environmental evaluation presented in the Initial Study
(Appendix A) and further analyzed in Chapter 4.0 of the Final PEIR, among others.
7.1 Greenhouse Gas (GHG) Emissions
7.1.1 Significant and Unavoidable Impact – GHG Threshold A (GHG emissions)
Threshold a): Would the Project generate greenhouse gas emissions, either directly or indirectly,
that may have a significant impact on the environment?
Even with project design features and feasible measures (including for example, fleet
electrification/renewable diesel during construction (e.g., MMs GHG-1, MM GHG-2, and MM GHG-
4); on-site energy efficiency exceeding Title 24 (e.g., GHG-PDF-1); no natural-gas combustion (e.g.,
GHG-PDF-9); EV charging (e.g., MM AQ-2); commute/VMT reduction strategies such as vanpools and
rideshare (e.g., MM TRANS-1 through MM TRANS-4 and MM AQ-2)), amortized construction plus
operational emissions are expected to exceed the commonly used SCAQMD screening value of 3,000
MTCO₂e/yr for land use projects (draft, not formally adopted). Therefore, project GHG emissions
remain significant and unavoidable. (see Draft and Final PEIR — §§1, 4.7, 11).
7.0-EFFECTS SIGNIFICANT AND UNAVOIDABLE AFTER MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 7-2
Findings of Fact and Statement of Overriding Considerations January 2026
7.1.2 Mitigation Measures
Greenhouse gas emission mitigation measures MM GHG-1 through MM GHG-5 (as described in
Section 6.5.1 above) were included in the Draft PEIR and the Final PEIR, are applicable to the
proposed project and would reduce potential project impacts related to greenhouse gas emissions.
These GHG mitigation measures are taken from the CAPCOA’s Handbook For Analyzing Greenhouse
Gas Emissions. The measures as provided include any revisions incorporated in the Final PEIR.
(see Draft and Final PEIR — §§4.7, 11).
7.1.3 Findings
Based on substantial evidence in the administrative record, the project would comply with applicable
State and City GHG-reduction plans and building energy requirements, as well as incorporate GHG
project design features beyond the minimum requirements of CalGreen (GHG-PDF-1 through GHG-
PDF-9). The project would further incorporate greenhouse gas emission mitigation measures MM-
GHG-1 through MM-GHG-5 which will reduce construction emissions, and operational GHG
emissions would be reduced through implementation of MM TRANS-1 through MM TRANS-4 and
MM AQ-1 and MM AQ-2. Despite the adoption of these measures however, there are no feasible
mitigation measures that will reduce the impact of the proposed project to less than significant and
this impact would remain significant and unavoidable after mitigation.
The City finds that implementation of the identified mitigation measures is feasible and will reduce
impacts on GHG emissions attributable to the proposed project. Pursuant to Public Resources Code
Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or alterations have been
required in, or incorporated into, the proposed project which will mitigate, in part, this significant
impact to GHG emissions attributable to the project, as identified in the Final PEIR.
However, the City finds that there are no feasible mitigation measures that will reduce the impact of
the proposed project to less than significant. Therefore, this impact would remain significant and
unavoidable. However, pursuant to Public Resources Code Section 21081(b), specific overriding
economic, legal, social, technological, and other benefits of the proposed project outweigh this
significant and unavoidable impact.
7.1.4 Facts in Support of Findings
The Draft PEIR confirms that the project incorporates numerous design and operational features
aligned with State and local GHG reduction goals, including compliance with Title 24 building energy
efficiency standards, the CaLGreen Code, and the City of Redlands Climate Action Plan. The project’s
all-electric building design, on-site renewable energy generation, and sustainable transportation
measures contribute to minimizing GHG emissions. Additional conservation and efficiency GHG
project design features are proposed beyond the minimum requirements of CalGreen, including GHG-
PDF-1 through GHG-PDF-9 (as described in Section 6.5.2 above).
With respect to construction emissions, CAPCOA has developed a method of quantifying GHG
reducing measures that may be incorporated into potentially significant projects. These quantifiable
construction mitigation measures (MM GHG-1 through MM GHG-5) will reduce potential GHG
reductions and will be incorporated into this project. These GHG mitigation measures reduce GHG
emissions during construction through the use of alternative fuels and electrified or hybrid
7.0-EFFECTS SIGNIFICANT AND UNAVOIDABLE AFTER MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 7-3
Findings of Fact and Statement of Overriding Considerations January 2026
construction equipment, limiting idling times, institution of a heavy-duty offroad vehicle plan, and
construction vehicle inventory tracking system.
To further reduce operational GHG emissions, MM TRANS-1 through MM TRANS-4 implement
transportation demand management strategies to lower vehicle miles traveled, while MM AQ-1 and
MM AQ-2 require the use of low-emission landscaping equipment and the provision of electric vehicle
charging infrastructure.
Mitigated GHG emissions from the project are estimated to be 14,306 metric tons per year. This will
exceed the SCAQMD significance threshold of 3,000 MTCO2e per year. Since most of these emissions
will come from mobile sources, the traffic study provides mitigation measures (MM TRANS-1 through
MM TRANS-4) targeted at project employees and commuter vehicle miles travelled (VMT) which can
be implemented to reduce GHG emissions in addition to the measures already considered.
Therefore, for GHG Emissions Threshold A, the project’s impacts would be significant and
unavoidable even with mitigation measures.
(see Draft and Final PEIR — §§ 1, 4.2, 4.7).
7.1.5 Cumulative Impacts
Cumulative impacts related to greenhouse gas (GHG) emissions are inherently global in scope. It is
widely recognized that no single project could generate enough GHG emissions to noticeably change
the global climate. However, the combination of GHG emissions from past, present, and future
projects could contribute substantially to global climate change. Thus, project specific GHG emissions
should be evaluated in terms of whether they would result in a cumulatively significant impact on
global climate change.
The project must incorporate GHG reduction measures to be consistent with state and local plans and
programs that aim to reduce state and regional GHG emissions, including the City of Redland’s
Climate Action Plan and 2035 General Plan. The project would also incorporate conservation and
efficiency GHG project design features beyond the minimum requirements of CalGreen (GHG-PDF-1
through GHG-PDF-9). The project would incorporate greenhouse gas emission mitigation measures
MM-GHG-1 through MM-GHG-5 which will reduce construction emissions. Operational GHG
emissions are further reduced through transportation demand management (MM TRANS-1 through
MM TRANS-4) and low-emission construction landscaping equipment and electric vehicle charging
requirements (MM AQ-1 and MM AQ-2).
Despite these measures, the project’s incremental contribution to GHG emissions and their effects on
climate change is estimated to be cumulatively considerable. For these reasons, the project’s
cumulative contribution to global climate change would be significant and unavoidable.
The City finds that implementation of the identified mitigation measures are feasible and will reduce
impacts on GHG emissions attributable to the proposed project. Pursuant to Public Resources Code
Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or alterations have been
required in, or incorporated into, the proposed project which will mitigate, in part, this significant
impact to GHG emissions attributable to the project, as identified in the Final PEIR.
However, the City finds that there are no feasible mitigation measures that will reduce the impact of
the proposed project to less than significant. Therefore, this impact would remain significant and
7.0-EFFECTS SIGNIFICANT AND UNAVOIDABLE AFTER MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 7-4
Findings of Fact and Statement of Overriding Considerations January 2026
unavoidable. However, pursuant to Public Resources Code Section 21081(b), specific overriding
economic, legal, social, technological, and other benefits of the proposed project outweigh this
significant and unavoidable impact.
7.2 Transportation – Vehicle Miles Traveled (VMT)
7.2.1 Significant and Unavoidable Impact – VMT Threshold B (CEQA Guidelines §
15064.3(b))
Threshold b): Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3,
subdivision (b)?
Substantial evidence in the record demonstrates that the project would generate Home-Based-Work
VMT per employee that exceeds the City of Redlands VMT significance threshold under CEQA
Guidelines §15064.3(b). Although feasible VMT-reduction measures would be implemented
(including MM TRANS-1 through MM TRANS-4), these measures would not achieve sufficient VMT
reduction to fall below the threshold. Therefore, the impact remains significant and unavoidable. (see
Draft and Final PEIR — §4.12).
7.2.2 Mitigation Measures
Transportation mitigation measures MM TRANS-1 through MM TRANS-4 (as described in Sections
6.1.1 and 6.5.2 above) were included in the Draft PEIR and the Final PEIR, are applicable to the
proposed project and would reduce potential project impacts related to transportation. The
measures as provided include any revisions incorporated in the Final PEIR.
(see Draft and Final PEIR — §§4.12, 11).
7.2.3 Findings
Based on substantial evidence in the administrative record, the project incorporates transportation
mitigation measures MM-TRANS-1 through MM-TRANS-4 which will reduce operational VMT
impacts. Despite the adoption of these measures, however, there are no feasible mitigation measures
that will reduce the impact of the proposed project to less than significant, and this impact would
remain significant and unavoidable after mitigation.
The City finds that implementation of the identified mitigation measures is feasible and will reduce
VMT transportation impacts attributable to the proposed project. Pursuant to Public Resources Code
Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or alterations have been
required in, or incorporated into, the proposed project which will mitigate, in part, this significant
impact to GHG emissions attributable to the project, as identified in the Final PEIR.
However, the City finds that there are no feasible mitigation measures that will reduce the impact of
the proposed project to less than significant. Therefore, this impact would remain significant and
unavoidable. However, pursuant to Public Resources Code Section 21081(b), specific overriding
economic, legal, social, technological, and other benefits of the proposed project outweigh this
significant and unavoidable impact.
7.0-EFFECTS SIGNIFICANT AND UNAVOIDABLE AFTER MITIGATION
7214/Kaiser Permanente Redlands Medical Center Page 7-5
Findings of Fact and Statement of Overriding Considerations January 2026
7.2.4 Facts in Support of Findings
The Draft PEIR confirms that the project will incorporate transportation mitigation measures MM-
TRANS-1 through MM-TRANS-4 which will reduce operational VMT impacts.
Project operation is estimated to generate 16,093 trips per day. VMT was estimated using the home-
based work method that focuses on commute trips. This is the travel between a person's home and
workplace. This method is used because it is consistent with the City's guidelines. Project
employment at Master Plan buildout is estimated to be 1,900 employees (Fehr & Peers, 2025, p. 29).
The City’s threshold for project VMT impacts is per capita VMT greater than 15 percent below the
San Bernardino County Baseline VMT. As shown below in Table 4.12-2 of the PEIR, estimated project
VMT per employee in 2050 is 22.7, that is, 12 percent higher than the City’s threshold.
Therefore, for Transportation Threshold B, the project’s impacts would be significant and
unavoidable even with mitigation measures.
(see Draft and Final PEIR — §4.12).
7.2.5 Cumulative Impacts
Pursuant to CEQA Guidelines § 15355 defines “cumulative impacts” in part, as
two or more individual effects which, when considered together, are considerable or
which compound or increase other environmental impacts. (a) The individual effects
may be changes resulting from a single project or a number of separate projects. (b)
The cumulative impact from several projects is the change in the environment which
results from the incremental impact of the project when added to other closely
related past, present, and reasonably foreseeable probable future projects.
The key is whether the project significantly adds to an existing or developing significant cumulative
problem, often determined by comparing project effects against established thresholds of
significance for a given region.
Per Section 4.12.5 of the PEIR, the VMT impact analysis summarized in Section 7.2 above applies to
cumulative as well as direct impacts. Thus, despite the application of the transportation mitigation
measures (MM TRANS-1 through MM TRANS-4), the project’s incremental contribution to VMT is
estimated to be cumulatively considerable. For these reasons, the project’s cumulative contribution
to VMT would be significant and unavoidable.
The City finds that implementation of the identified transportation mitigation measures are feasible
and will reduce VMT impacts attributable to the proposed project. Pursuant to Public Resources Code
Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or alterations have been
required in, or incorporated into, the proposed project which will mitigate, in part, this significant
VMT impact attributable to the project, as identified in the Final PEIR.
However, the City finds that there are no feasible mitigation measures that will reduce the impact of
the proposed project to less than significant. Therefore, this impact would remain significant and
unavoidable. However, pursuant to Public Resources Code Section 21081(b), specific overriding
economic, legal, social, technological, and other benefits of the proposed project outweigh this
significant and unavoidable impact.
8.0-PROJECT ALTERNATIVES FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 8-1
Findings of Fact and Statement of Overriding Considerations January 2026
8.0 FINDINGS REGARDING PROJECT ALTERNATIVES
Section 15126.6(a) of the CEQA Guidelines requires the discussion of “a reasonable range of
alternatives to a project, or the location of a project, which would feasibly attain most of the basic
objectives of the project but would avoid or substantially lessen any of the significant effects of the
project and evaluate the comparative merits of the alternatives.” The PEIR considered and analyzed
the following four alternatives to the proposed project which would be capable, to varying degrees,
of reducing identified impacts:
▪ Alternative 1 — No Project Alternative
▪ Alternative 2 — No Project/General Plan Buildout Alternative;
▪ Alternative 3 — Reduced Intensity Alternative; and
▪ Alternative 4 — Dispersed Facilities Alternative.
These alternatives are discussed below and evaluated for their ability to avoid or substantially lessen
the impacts of the proposed project identified in the Final PEIR, as well as consideration of their
ability to meet the basic objectives of the proposed project as described in the Final PEIR as follows:
1. Provide health care capacity for Kaiser Permanente members in the San Bernardino -
Redlands region.
2. Incorporate numerous sustainability features such as vegetated swales, tree-based
infiltration, and inert bioswales; high-performance building enclosure systems, external
shading, energy efficient and carbon neutral building systems and equipment selections, and
solar panels. The buildings will meet or exceed Leadership in Energy and Environmental
Design (LEED) Gold certification.
3. Develop the project site in accordance with the Medical Facilities designation in Redlands
Business Center Concept Plan No. 1.
4. Phase development over 25 years to keep pace with projected increase in Kaiser Permanente
membership in the facility’s service area over that period.
The City finds that a good faith effort was made to evaluate all reasonable alternatives to the project
that could feasibly obtain the basic objectives of the project, even when the alternatives might impede
the attainment of the project objectives or might be more costly. The City also finds that all reasonable
alternatives were reviewed, analyzed, and discussed in the review process of the Final PEIR and the
ultimate decision on the project.
8.1 Alternative 1: No Project Alternative
8.1.1 Summary of Alternative
Under the No Project Alternative, the project would not be constructed. The existing medical office
building would continue operating, and the remainder of the site would remain vacant. No
demolition, grading, or construction would occur. Regional patients and staff would continue
traveling to other Kaiser Permanente facilities (e.g., Fontana and Ontario).
8.0-PROJECT ALTERNATIVES FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 8-2
Findings of Fact and Statement of Overriding Considerations January 2026
8.1.2 Reasons for Rejecting Alternative
This alternative would avoid all project impacts, including significant and unavoidable GHG and VMT
impacts. However, it would not achieve any of the project objectives. It would not expand regional
care capacity, would not develop the project site in accordance with Redlands Business Center
Concept No. 1, and would not support long-term development of medical facilities to keep pace with
Kaiser Permanente’s anticipated membership increase or support long-term regional medical
service needs. Additionally, no new employment, public-service benefits, or consistency with
planned medical land uses would be provided. Therefore, despite environmental advantages, this
alternative would not meet the needs for the project and is inconsistent with core health-care service
and policy goals. (see Draft and Final PEIR — §§5.5, 6.4.2).
8.1.3 Findings
Under Alternative 1, the No Project alternative, the project would not be approved, and no
development would occur. The No Project Alternative would eliminate the project’s significant and
unavoidable construction transportation impact. The No Project Alternative would have similar
impacts as the project for wildfire hazards. Impacts associated with the remaining environmental
issues would be less than those of the proposed project. None of the impacts of this alternative would
be considerably greater than those of the proposed project.
Accordingly, per CEQA Guidelines § 15126.6, Alternative 1, the No Project alternative, is the
environmentally superior alternative (see Draft and Final PEIR - §§ 1.11.5, 5.1, 5.9). CEQA Guidelines
Section 15126.6(e)(2) states that if the environmentally superior alternative is the “No Project”
alternative, the PEIR must also identify an environmentally superior alternative among the other
alternatives. Here, that would be Alternative 3, the Reduced Density Alternative, which is addressed
below.
However, Alternative 1 would not meet any of the project objectives including the development of a
medical center serving Kaiser Permanente members in the San Bernardino-Redlands region. Rather,
the site would remain undeveloped land. Pursuant to Public Resources Code Section 21081(a)(3) and
CEQA Guidelines Section 15091(a)(3), the City rejects the Alternative 1, No Project alternative,
finding it undesirable due to the following: it fails the proposed project’s underlying purpose; and
does not meet any of the project objectives..
8.2 Alternative 2: No Project/General Plan Buildout Alternative
8.2.1 Summary of Alternative
Under this alternative, the existing medical office building would remain present and in operation,
and the remainder of the site (28.15 acres) would be developed with other uses, that are not
necessarily related to the existing development, but are consistent with the current General Plan land
use designation for the site, “Commercial Industrial.” Uses consistent with this designation include
commercial, light industrial, flex commercial space, business parks, auto services, retail, services,
manufacturing, and other institutional uses. Under this scenario, development may proceed
incrementally under different proponents, potentially resulting in fragmented developmentand
reduced functional and environmental performance.
8.0-PROJECT ALTERNATIVES FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 8-3
Findings of Fact and Statement of Overriding Considerations January 2026
8.2.2 Reasons for Rejecting Alternative
Although this alternative may reduce or change the magnitude of some potential impacts (e.g., air
quality, energy use), it would still result in significant and unavoidable Greenhouse Gas Emission and
VMT (transportation) impacts and it would not fulfill the project’s purpose or core objectives.
Alternative 2 would not meet objective 1 because it would not improve regional access to
comprehensive health care for Kaiser Permanente members. Alternative 2 would not meet objective
3 because it would not develop the project site in accordance with Redlands Business Center Concept
No. 1 land use regulations. Compared with the proposed project, this Alternative would not as
effectively support the phased, long-term development of medical facilities to keep pace with Kaiser
Permanente’s anticipated increase in membership, and would reduce support for long-term regional
medical office needs. Additionally, new employment, public-service benefits, or consistency with
planned medical land uses are less likely to be provided than under the proposed project. Moreover,
this scenario could result in less sustainable development patterns and increased VMT, as well as
directly conflict with the existing zoning regulations applicable to the project location . For these
reasons, this alternative is considered infeasible and inferior to the proposed project. (see Draft and
Final PEIR — §5.6, 6.4.2).
8.2.3 Findings
Under Alternative 2, the No Project/General Plan Buildout alternative, the project would not be
approved. The existing medical office building remains present and in operation but the balance of
the project site (28.15 acres) would be built out in accordance with the existing General Plan land
use designation for the site, which is Commercial Industrial.
While Alternative 2 is anticipated to reduce certain environmental impacts, it would not avoid any of
the proposed project’s significant and unavoidable impacts. The remaining environmental effects
would be generally similar to or greater than those of the proposed project.
Alternative 2 would not satisfy Project Objectives 1 and 3 and only partially meet Project Objectives
2 and 4. Overall, the No Project/General Plan Buildout Alternative would not meet the project’s
objectives of providing health care capacity for Kaiser Permanente members in the San Bernardino-
Redlands region.
Pursuant to Public Resources Code Section 21081(a)(3) and CEQA Guidelines Section 15091(a)(3),
the City rejects the Alternative 2, the No Project/General Plan Buildout alternative, finding it
undesirable due to the following: it fails the proposed project’s underlying purpose; only partially
meets two of the four project objectives; would not avoid the project’s significant and unavoidable
impacts; and, because specific economic, legal, social, technological, or other considerations make the
alternative infeasible.
8.3 Alternative 3: Reduced Intensity Alternative
8.3.1 Summary of Alternative
This alternative would reduce the intensity of the proposed project by omitting phases 3 and 4 from
the project, constructing a smaller medical center, including a reduced-bed hospital and fewer
outpatient services, along with a downsized parking structure. Trip generation, energy consumption,
grading, and operational emissions would be lower than those associated with the proposed project.
8.0-PROJECT ALTERNATIVES FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 8-4
Findings of Fact and Statement of Overriding Considerations January 2026
Some regional health-care benefits would still occur; however, the reduced scale would limit care
accessibility and long-term service delivery capacity.
8.3.2 Reasons for Rejecting Alternative
The Reduced Intensity Alternative would lessen several impacts (including air quality, energy use,
and operational emissions) and would reduce, but not avoid, the significant and unavoidable GHG
and VMT (transportation) impacts. However, it would only partially achieve the project objectives.
Compared with the proposed project, the Reduced Intensity Alternative would limit the project’s
ability to meet Kaiser Permanente’s projected regional health-care demand; reduce operational
efficiencies gained through the co-location of health-care services; reduce support for the long-term
development of medical facilities to keep pace with Kaiser Permanente’s anticipated membership
increase; and reduce support for long-term regional medical service needs. Additionally, new
employment and public-service benefits would be decreased in comparison to the proposed project.
For these reasons, although environmentally advantageous in some areas, the Reduced Intensity
Alternative is not preferred because it would not adequately fulfill critical health-care service needs
for the region. (see Draft and Final PEIR — §§5.7, 6.4.2).
8.3.3 Findings
Under Alternative 3, the Reduced Intensity alternative, phases 3 and 4 of the project would not be
implemented.
While Alternative 3 is anticipated to reduce some environmental impacts, it would not avoid any of
the proposed project’s significant and unavoidable impacts. The remaining environmental effects
would be generally similar to or greater than those of the proposed project.
Alternative 3 would only partially meet Project Objectives 1, 3 and 4. Overall, the Reduced Intensity
Alternative would only partially meet project’s objectives of providing health care capacity for Kaiser
Permanente members in the San Bernardino-Redlands region.
Per CEQA Guidelines Section 15126.6(e)(2), if the environmentally superior alternative is the “No
Project” alternative (Alternative 1 above), the PEIR must also identify an environmentally superior
alternative among the other alternatives. Here, that would be Alternative 3 (see Draft and Final PEIR
- §§ 1.11.5, 5.1, 5.9).
Nevertheless, pursuant to Public Resources Code Section 21081(a)(3) and CEQA Guidelines Section
15091(a)(3), the City rejects the Alternative 3, the Reduced Intensity alternative, finding it
undesirable due to the following: it only partially meets three of the four project objectives and only
partially satisfies the proposed project’s underlying purpose; would not avoid the project’s
significant and unavoidable impacts; and, because specific economic, legal, social, technological, or
other considerations make the alternative infeasible.
8.4 Alternative 4: Dispersed Facilities Alternative
8.4.1 Summary of Alternative
Under this alternative, medical services would be distributed across multiple smaller facilities
located throughout the region, rather than co-located on a single, integrated campus. While each
8.0-PROJECT ALTERNATIVES FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 8-5
Findings of Fact and Statement of Overriding Considerations January 2026
facility would serve specific functions (e.g., outpatient care, diagnostics, or urgent care), no
centralized, consolidated medical center would be built under this Alternative.
8.4.2 Reasons for Rejecting Alternative
This alternative would avoid site-specific impacts at the Redlands location, but would still result in
significant and unavoidable Greenhouse Gas Emission and VMT (transportation) impacts. The
decentralized approach would not develop the project site in accordance with Redlands Business
Center Concept No. 1. Compared with the proposed project, this Alternative would limit the project’s
ability to develop adequatemedical facilities to serve Kaiser Permanente’s anticipated membership
increase. Further, this Alternative would compromise staff coordination, reduce operational
efficiency and service integration, and likely impede the timely implementation of modern healthcare
facilities to address regional needs. This alternative would also be less consistent with the City’s
General Plan land use and medical zoning designations.
Therefore, in addition to failing to fully satisfy the project objectives, this alternative is not preferred
due to logistical, environmental, and policy alignment shortcomings. (see Draft and Final PEIR —
§§5.8, 6.4.2).
8.4.3 Findings
Under Alternative 4, the Dispersed Facilities alternative, the project would develop approximately
six small medical office facilities in the San Bernardino–Redlands region (the general service area for
the proposed project).
While Alternative 4 is anticipated to reduce certain environmental impacts, including those relatd to
VMT, it would not avoid any of the proposed project’s significant and unavoidable impacts. The
remaining environmental effects would be generally similar to or greater than those of the proposed
project.
Alternative 4 would not satisfy Project Objective 3 and only partially meet Project Objective 4.
Pursuant to Public Resources Code Section 21081(a)(3) and CEQA Guidelines Section 15091(a)(3),
the City rejects the Alternative 4, the Dispersed Facilities alternative, finding it undesirable due to the
following: of the four project objectives, it fails to satisfy Project Objective 3 and only partially meets
Project Objective 4; would not avoid the project’s significant and unavoidable impacts; and, because
specific economic, legal, social, technological, or other considerations make the alternative infeasible.
9.0- GENERAL CEQA FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 9-1
Findings of Fact and Statement of Overriding Considerations January 2026
9.0 GENERAL CEQA FINDINGS
As expressed more fully herein, the City certifies that the Final PEIR, dated January 2026, has been
completed in compliance with CEQA and the CEQA Guidelines, that the PEIR was presented to the
City, and that the City reviewed and considered the information contained therein before approving
the proposed project, and that the EIR reflects the independent judgment and analysis of the City
agency. (CEQA Guidelines § 15090.)
Any findings made by the City shall be deemed made, regardless of where it appears in this document.
All of the language included in this document constitutes findings by the City, whether or not any
particular sentence or clause includes a statement to that effect. The City intends that these findings
be considered as an integrated whole and, whether or not any part of these findings fail to cross -
reference or incorporate by reference any other part of these findings, that any finding required or
committed to be made by the City with respect to any particular subject matter of the Final PEIR,
shall be deemed to be made if it appears in any portion of these findings.
9.1 Procedural Compliance With California Environmental Quality Act
The City published a Draft PEIR on November 18, 2025. A Final PEIR was completed in January of
2026 in compliance with CEQA requirements. The Final PEIR has been prepared in accordance with
CEQA and the CEQA Guidelines. As authorized in State CEQA Guidelines Section 15084(d)(2), the City
retained a consultant to assist with the preparation of the environmental documents. City staff from
multiple departments, representing the Lead Agency, have directed, reviewed, and modified where
appropriate all material prepared by the consultant. The key milestones associated with the
preparation of the PEIR are summarized below. As presented below, an extensive public involvement
and agency notification effort was conducted to solicit input on the scope and content of the PEIR and
to solicit comments on the results of the environmental analysis presented in the Draft PEIR.
9.1.1 Environmental Review Process
In conformance with CEQA, the State CEQA Guidelines, and the County CEQA Guidelines, the City
conducted an extensive environmental review of the proposed project.
The environmental review process for the project commenced with solicitation of comments from
identified responsible and trustee agencies, as well as interested parties on the scope of the Draft
PEIR, through a Notice of Preparation (NOP) process. The NOP was circulated for public comment to
the State Clearinghouse, Office of Planning and Research, responsible agencies, owners, local
addresses, and other interested parties from January 22, 2025 through February 21, 2025. A public
scoping meeting for the project was held at 4:30 p.m. on February 12, 2025. As part of the public
distribution process for the Initial Study for the proposed project, Native American tribal contacts
were sent a copy of the NOP and a CD with the Initial Study and Initial Study appendices. The NOP
was Appendix A3 in the Draft PEIR and the public comments received on the Initial Study were
included as Appendix A1 in the Draft PEIR.
Consistent with the requirements of § 15087 of the CEQA Guidelines, the Draft PEIR was submitted
to the State Clearinghouse, Office of Planning and Research for distribution to state agencies and was
circulated for a 45-day public review commencing on November 18, 2025, and ending on January 5,
2026. A Notice of Availability of the Draft PEIR was emailed to those interested parties who requested
notice. A press release describing the PEIR and public review thereof was published in the Redlands
Daily Facts newspaper on November 18, 2025. The Draft PEIR was made available for review on City
9.0- GENERAL CEQA FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 9-2
Findings of Fact and Statement of Overriding Considerations January 2026
of Redlands website (available here: https://www.cityofredlands.org/post/environmental-
documents) and at the City’s Development Services Department at 35 Cajon Street, Suite 20,
Redlands, CA 92373, A.K. Smiley Public Library at 125 W. Vine Street, Redlands, CA 92373, and at
the County’s Clerk of the Board Office located at 385 N. Arrowhead Avenue, #2, San Bernardino, CA
92415. Following the Draft PEIR public comment period, this Final PEIR has been prepared and
includes responses to the comments raised regarding the Draft PEIR.
9.2 Environmental Mitigation Monitoring Program
Based on the entire record before the City and having considered the unavoidable significant impacts
of the project, the City hereby determines and finds that all feasible mitigation within the
responsibility and jurisdiction of the City has been adopted to reduce or avoid the potentially
significant impacts identified in the Final PEIR, and that no additional feasible mitigation is available
to further reduce significant impacts. The feasible mitigation measures are discussed in Sections 6
and 7, and are set forth in the MMRP attached hereto (Attachment A).
Section 21081.6 of the Public Resources Code requires the City to adopt a monitoring or compliance
program regarding the changes in the project and mitigation measures imposed to lessen or avoid
significant effects on the environment. The MMRP for the proposed project, which is attached hereto
(Attachment A) and made a part of these Findings, is hereby adopted by the City in satisfaction of
Section 21081.6 of the Public Resources Code and in fulfillment of the CEQA mitigation monitoring
requirements as:
▪ The MMRP is designed to ensure compliance with the changes in the project and mitigation
measures imposed on the project during project implementation; and
▪ Measures to mitigate or avoid significant effects on the environment are fully enforceable
through conditions of approval, permit conditions, agreements, or other measures.
9.3 CEQA Guidelines Section 15091 and 15092 Findings
Based on the findings herein and the information contained in the administrative record, the City has
made one or more of the following findings with respect to each of the significant effects of the
project:
1. Changes or alterations have been required in, or incorporated into, the project which mitigate
or avoid significant effects on the environment.
2. Those changes or alterations are within the responsibility and jurisdiction of another public
agency and such changes have been adopted by such other agency, or can and should be
adopted by such other agency.
3. Specific economic, legal, social, technological, or other considerations, including
considerations for the provision of employment opportunities for highly trained workers,
make the mitigation measures or alternatives identified in the Final PEIR infeasible.
Based on the findings herein and the information contained in the administrative record, and as
conditioned by the foregoing:
9.0- GENERAL CEQA FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 9-3
Findings of Fact and Statement of Overriding Considerations January 2026
1. All significant effects on the environment due to the project have been eliminated or
substantially lessened where feasible.
2. Any remaining significant effects that have been found to be unavoidable are acceptable due
to the overriding considerations set forth in Section 10 herein.
9.4 City of Redland’s Independent Judgment
The Final PEIR for the proposed project reflects the City’s independent analysis and judgment. The
City has exercised independent judgment in accordance with Public Resources Code 21082.1(c)(3)
in retaining its own environmental consultant in the preparation of the PEIR, as well as reviewing,
analyzing, and revising material prepared by the consultant.
Having received, reviewed, and considered the information in the Final PEIR, as well as any and all
other information in the record, the City hereby makes these findings pursuant to and in accordance
with Sections 21081, 21081.5, and 21081.6 of the Public Resources Code.
9.5 Reliance on Record
Each and all of the findings and determinations contained herein are based on substantial evidence,
both oral and written, contained in the administrative record relating to the project.
9.5.1 Record of Proceedings
In accordance with PRC Section 21167.6(e) and for purposes of CEQA and these Findings, the record
of proceedings for the City’s decision on the project includes the following documents and other
evidence, at a minimum:
▪ The NOP and all other public notices issued by the City in conjunction with the proposed
project.
▪ The Final PEIR for the proposed project and all appendices thereto.
▪ The Draft PEIR and all appendices thereto.
▪ All written comments submitted by agencies or members of the public during the public
review comment period on the Draft PEIR.
▪ All responses to written comments submitted by agencies or members of the public during
the public review comment period on the Draft PEIR.
▪ All written and verbal public testimony presented during a noticed public hearing for the
proposed project.
▪ The Mitigation Monitoring and Reporting Program (MMRP).
▪ All documents, including but not limited to EIRs, reports, studies, memoranda, maps, staff
reports, or other planning documents or materials cited and/or referenced in the Draft PEIR
and Final EIR, or otherwise relied upon with respect to the City’s action on the project;
9.0- GENERAL CEQA FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 9-4
Findings of Fact and Statement of Overriding Considerations January 2026
▪ All documents submitted by other public agencies or members of the public in connection
with the project, up through the close of the final public hearing;
▪ Any minutes and/or verbatim transcripts of all information sessions, public meetings, and
public hearings held in connection with the project;
▪ Any documentary or other evidence submitted at such information sessions, public meetings,
and public hearings;
▪ All findings and resolutions adopted by the City in connection with the proposed project, and
all documents cited and/or referenced therein, including comments received after the close
of the comment period and responses thereto.
▪ Matters of common knowledge to the City, including but not limited to federal, state, and local
laws and regulations.
▪ Any documents expressly cited in these Findings in addition to those above.
▪ Any other written materials relevant to the City’s compliance with CEQA or its decision on
the merits of the project, including any documents or portions thereof, that were released for
public review, relied upon in the environmental documents prepared for the project, or
included in the City’s non-privileged retained files for the EIR or project;
▪ Any other relevant materials required to be in the record of proceedings by Public Resources
Code Section 21167.6(e).
▪ The Notice of Determination.
The City intends that only those documents relating to the project and its compliance with CEQA and
prepared, owned, used, or retained by the City and listed above shall comprise the administrative
record for the project. Only that evidence was presented to, considered by, and ultimately before the
City prior to reviewing and reaching its decision on the EIR and project.
9.5.2 Custodian and Location of Records
The documents and other materials that constitute the administrative record for the City’s actions
related to the project are at the City of Redlands Development Services Department main office at 35
Cajon Street, Suite 20, Redlands, CA. Development Services Department is the custodian of the
administrative record for the project. Copies of these documents, which constitute the record of
proceedings, are and at all relevant times have been and will be available upon request at the offices
of the Development Services Department. This information is provided in compliance with Public
Resources Code Section 21081.6(a)(2) and Guidelines Section 15091(e).
9.6 Recirculation Not Required
CEQA Guidelines Section 15088.5 provides the criteria that a lead agency is to consider when
deciding whether it is required to recirculate an EIR. Recirculation is required when “significant new
information” is added to the EIR after public notice of the availability of the Draft EIR is given, but
before certification. (CEQA Guidelines, §15088.5(a).)
9.0- GENERAL CEQA FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 9-5
Findings of Fact and Statement of Overriding Considerations January 2026
In relevant part, CEQA Guidelines Section 15088.5(a) describes “significant new information,” as
…information added to an EIR … that deprives the public of a meaningful opportunity
to comment upon a substantial adverse environmental effect of the project or a
feasible way to mitigate or avoid such an effect (including a feasible project
alternative) that the project's proponents have declined to implement.
"Significant new information" requiring recirculation include, for example, a
disclosure showing that:
(1) A new significant environmental impact would result from the project or
from a new mitigation measure proposed to be implemented.
(2) A substantial increase in the severity of an environmental impact would
result unless mitigation measures are adopted that reduce the impact to a
level of insignificance.
(3) A feasible project alternative or mitigation measure considerably different
from others previously analyzed would clearly lessen the significant
environmental impacts of the project, but the project's proponents decline to
adopt it.
(4) The draft EIR was so fundamentally and basically inadequate and
conclusory in nature that meaningful public review and comment were
precluded. (Mountain Lion Coalition v. Fish & Game Com. (1989) 214
Cal.App.3d 1043).
(CEQA Guidelines, §15088.5(a)(1)-(3).).
Recirculation is not required where “the new information added to the EIR merely clarifies or
amplifies or makes insignificant modifications in an adequate EIR.” (CEQA Guidelines, §15088.5(b).).
Recirculation also is not required simply because new information is added to the EIR. New
information is routinely added given CEQA’s public/agency comment and response process and
CEQA’s post-Draft EIR circulation requirement of proposed responses to comments submitted by
public agencies. In brief, recirculation is “intended to be an exception rather than the general rule”
(Laurel Heights Improvement Assn. v. Regents of University of California (1993) 6 Cal.4th 1112, 1132.).
Given this context, the City finds that recirculation of the Draft PEIR prior to certification is not
required. In addition to providing responses to comments, the Final PEIR includes revisions to
expand upon information presented in the Draft PEIR; explains or enhances the evidentiary basis for
the Draft PEIR’s findings; updates information; and makes clarifications, amplifications, updates, or
helpful revisions to the Draft PEIR. The Final PEIR’s revisions, clarifications and/or updates do not
result in any new significant impacts or increase the severity of a previously identified significant
impact.
In sum, the Final PEIR demonstrates that the project will not result in any new significant impacts or
increase the severity of a significant impact, as compared to the analysis presented in the Draft PEIR.
The changes reflected in the Final PEIR also do not indicate that meaningful public review of the Draft
PEIR was precluded in the first instance. Accordingly, recirculation of the PEIR is not required as
revisions to the PEIR are not significant as defined in Section 15088.5 of the State CEQA Guidelines.
9.0- GENERAL CEQA FINDINGS
7214/Kaiser Permanente Redlands Medical Center Page 9-6
Findings of Fact and Statement of Overriding Considerations January 2026
9.7 Certification Of The Final Program Environmental Impact Report
In accordance with CEQA and the CEQA Guidelines, having received, reviewed, and considered the
PEIR for the Kaiser Permanente Redlands Medical Center project (SCH 2025010666), as well as other
information in the record of proceedings on this matter, the City of Redlands, as the Lead Agency
certifies and adopts the Findings of Fact (Findings) and Statement of Overriding Considerations
contained herein as part of its certification of the Final PEIR for the project. The Findings and
Statements of Overriding Considerations set forth the environmental and other bases for current and
subsequent discretionary actions to be undertaken by the City and responsible agencies for the
implementation of the project.
The City hereby makes findings pursuant to and in accordance with Section 21081 of the California
Public Resources Code and State CEQA Guidelines Sections 15043 (Authority to Approve Projects
Despite Significant Effects), 15090 (Certification of the Final EIR) and 15091 (Findings) and hereby
certifies that:
(1) the final PEIR has been completed in compliance with CEQA;
(2) the final PEIR was presented to the City Council of the City of Redlands as the decision
making body of the lead agency and that the City Council reviewed and considered the
information contained in the final PEIR prior to approving the project; and
(3) as noted in Section 9, the final EIR reflects the lead agency's independent judgment and
analysis.
The City further certifies that changes or alterations have been required in, or incorporated into, the
project which mitigate or avoid the significant environmental effect as identified in the Final PEIR.
Specifically, and as further described herein, the Final PEIR for the proposed project identified
potentially significant effects that could result from the project’s implementation. However, the City
finds that the inclusion of certain mitigation measures as part of the project approval will reduce
most, but not all, of those effects to less than significant levels. Those impacts that are not reduced to
less than significant levels are identified and overridden due to specific project benefits described in
the Statement of Overriding Considerations (Section 10).
10.0-ADOPTION OF STATEMENT OF OVERRIDING CONSIDERATIONS
7214/Kaiser Permanente Redlands Medical Center Page 10-1
Findings of Fact and Statement of Overriding Considerations January 2026
10.0 ADOPTION OF STATEMENT OF OVERRIDING CONSIDERATIONS
Pursuant to Public Resources Code Section 21081(b) and CEQA Guidelines sections 15126.2,
15093(a) and (b), the City is required to balance, as applicable, the economic, legal, social,
technological, or other benefits, including region-wide or statewide environmental benefits, of a
proposed project against its unavoidable environmental risks when determining whether to approve
the project. If the specific economic, legal, social, technological, or other benefits of the project,
including region-wide or statewide environmental benefits, outweigh the unavoidable adverse
environmental effects, those effects may be considered “acceptable” (CEQA Guidelines, §15093 (a)).
CEQA requires the agency to support, in writing, the specific reasons for considering a project
acceptable when significant impacts are not avoided or substantially lessened. Those reasons must
be based on substantial evidence in the Final PEIR or elsewhere in the administrative record (CEQA
Guidelines, §15093(b)).
Courts have upheld overriding considerations that were based on a variety of policy considerations
including, but not limited to, new jobs, stronger tax base, and implementation of an agency’s
economic development goals, growth management policies, redevelopment plans, the need for
housing and employment, conformity to community plan, and provision of construction jobs . See
Towards Responsibility in Planning v. City Council (1988) 200 Cal App. 3d 671; Dusek v. Redevelopment
Agency (1985) 173 Cal App. 3d 1029; City of Poway v City of San Diego (1984) 155 Cal App. 3d 1037;
Markley v. City Council (1982) 131 Cal App.3d 656.
Pursuant to State CEQA Guidelines § 15093, the City of Redlands, as Lead Agency, has reviewed and
considered the information contained in the Draft and Final Program Environmental Impact Reports
(collectively, “PEIR”) for the Kaiser Permanente Redlands Medical Center project, as well as the entire
administrative record. In accordance with the requirements of CEQA and the CEQA Guidelines, the
City finds and determines that:
(1) all significant environmental effects of the proposed Project have been substantially
lessened where feasible;
(2) the proposed Project will result in certain significant adverse environmental effects that
cannot be avoided or reduced to a less-than-significant level even with incorporation of all
feasible mitigation measures; and
(3) there are no other feasible mitigation measures or feasible Project alternatives that will
further mitigate, avoid, or reduce the remaining significant environmental effects to a less -
than-significant level.
As documented in the PEIR, the City finds that the project would result in the following significant
and unavoidable environmental impacts, even after implementation of all feasible mitigation
measures:
• Greenhouse Gas (GHG) Emissions (see PEIR Section 4.7)
• Transportation — Vehicle Miles Traveled (VMT) (see PEIR Section 4.12)
Even with mitigation (MM TRANS-1 through MM TRANS-4 and all applicable GHG reduction
measures) no additional feasible mitigation or alternatives have been identified that would avoid or
further reduce the significant and unavoidable impacts associated with GHG emissions and VMT
10.0-ADOPTION OF STATEMENT OF OVERRIDING CONSIDERATIONS
7214/Kaiser Permanente Redlands Medical Center Page 10-2
Findings of Fact and Statement of Overriding Considerations January 2026
while still achieving the project objectives. The Final PEIR provides detailed information regarding
these impacts (see Section 7, Environmental Effects That Remain Significant And Unavoidable After
Mitigation, of this document).
The City further finds that these remaining significant and unavoidable environmental effects are
outweighed and are found to be acceptable due to specific overriding economic, legal, social,
technological, or other considerable benefits based upon the facts set forth herein, the PEIR, and the
record, including as follows:
1. The project is necessary to provide sufficient health care capacity for Kaiser Permanente
members in the San Bernardino-Redlands region.
a. Specifically, the project will result in improved regional healthcare access and increase
regional capacity for advanced inpatient and outpatient services for Kaiser Permanente
members within the San Bernardino–Redlands service area. The project reduces travel
distances and improves response times for urgent and specialty healthcare services.
b. The project will also improve patient outcomes and operational efficiency. Co-location of
medical services increases coordination of care, reduces delays in treatment, and enhances
patient health outcomes over time. The project’s phased development approach facilitates
healthcare service capacity expansion to keep pace with projected regional increases in
Kaiser Permanente membership.
2. The project will incorporate numerous sustainability features such as vegetated swales, tree-
based infiltration, and inert bioswales; high-performance building enclosure systems, external
shading, energy efficient and carbon neutral building systems and equipment selections, and
solar panels. The buildings will meet or exceed Leadership in Energy and Environmental Design
(LEED) Gold certification.
a. The project will promote long-term sustainability and resource efficiency via the
incorporation of numerous sustainability features, including conservation and efficiency
project design features (GHG-PDF-1 through GHG-PDF-9), high-performance building
enclosure systems, external shading, energy efficient and carbon neutral building systems
and equipment selections, solar panels, and water-efficient infrastructure, contributing to
statewide and local climate and sustainability goals. New buildings will meet or exceed LEED
Gold certification.
b. Further, the project design will enhance seismic safety and code compliance. The new
facilities will incorporate a soils and geology project design feature (PDF-GEO-1) and comply
with current seismic standards for hospitals and essential medical services, replacing
reliance on older facilities.
3. The project will develop the project site in accordance with the Medical Facilities designation in
Redlands Business Center Concept Plan No. 1.
a. Consistent with this plan, development of the project site will have economic and
employment benefits. Construction and operation of the medical center would generate
substantial local employment, provide long-term skilled medical and support jobs, and
stimulate secondary economic growth in the region.
10.0-ADOPTION OF STATEMENT OF OVERRIDING CONSIDERATIONS
7214/Kaiser Permanente Redlands Medical Center Page 10-3
Findings of Fact and Statement of Overriding Considerations January 2026
4. The project will phase development over 25 years to keep pace with projected increase in Kaiser
Permanente membership in the facility’s service area over that period.
a. The project will provide support for regional planning and smart growth. The project’s
development consolidates high-quality medical services within an existing urbanized area,
consistent with the City of Redlands General Plan, The East Valley Corridor Specific Plan,
Redlands Business Center Concept Plan No. 1., and other City land use policies and
infrastructure investment strategies designed to reduce sprawl and promote compact
regional growth.
In accordance with State CEQA Guidelines §§ 15043 (Authority to Approve Projects Despite Significant
Effects), 15091 (Findings), and 15093, (Statement of Overriding Considerations), and balancing the
specific economic, legal, social, technological, and other considerable benefits associated with the
project, the City finds that the project's remaining significant and unavoidable impacts are acceptable
due to the factors described above. Therefore, the City of Redlands hereby adopts this Statement of
Overriding Considerations as part of its approval of the Kaiser Permanente Redlands Medical Center
project.
ATTACHMENTS
ATTACHMENT A
FINAL MITIGATION MONITORING AND REPORTING PROGRAM
(MMRP)
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-1
Response to Comments January 2026
4.0 FINAL MITIGATION MONITORING AND REPORTING PROGRAM
The Final Mitigation Monitoring and Reporting Program (MMRP) has been prepared in
conformance with § 21081.6 of the Public Resources Code and § 15097 of the CEQA Guidelines,
which requires all state and local agencies to establish monitoring or reporting programs whenever
approval of a project relies upon a MND or an EIR. The MMRP ensures implementation of the
measures being imposed to mitigate or avoid the significant adverse environmental impacts
identified through the use of monitoring and reporting. Monitoring is generally an ongoing or
periodic process of project oversight; reporting generally consists of a written compliance review
that is presented to the decision-making body or authorized staff person.
It is the intent of the MMRP to: (1) provide a framework for document implementation of the
required mitigation; (2) identify monitoring/reporting responsibility; (3) provide a record of the
monitoring/reporting; and (4) ensure compliance with those mitigation measures (MMs) that are
within the responsibility of the City and/or Applicant to implement.
This MMRP includes specific project design features (PDFs) and best management practices (BMPs)
referenced in the PEIR that will be implemented with the project's construction and operation. The
specific PDFs and BMPs are presented in Table 4.0-1 below.
The required MMs are presented in Table 4.0-2 below. Environmental topics for which mitigation
is required are listed in Table 4.0-2 under their corresponding impact category. This table also lists
impacts, mitigation measures adopted by the City of Redlands in connection with approval of the
proposed project, level of significance after mitigation, responsible and monitoring parties, and the
project phase in which the measures are to be implemented.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-2
Response to Comments January 2026
Table 4.0-1
PROJECT DESIGN FEATURES (PDFs) AND BEST MANAGEMENT PRACTICES (BMPs)
Issue Area Project Design Features (PDFs) and Best Management Practices (BMPs)
4.5 Geology and Soils
Threshold F:
Would the project
directly or indirectly
destroy a unique
paleontological
resource or site or
unique geologic
feature?
PDF-GEO-1
The project would implement all geotechnical recommendations for the development of the site, including earthwork,
seismic design, retaining walls, shoring, and foundation design as specified in the Geotechnical Investigation Report prepare d
for the Medical Office Building 2 (MOB 2) project at the Kaiser Redlands site located at 1301 California Street in Redlands.
Prepared by Twining, dated March 31, 2023; provided in Appendix D7 of this PEIR.
4.7 Greenhouse Gas Emissions
Energy Conservation
and Efficiency
GHG-PDF-1
Project design will provide energy efficiency exceeding Title 24, Part 6, California Energy Code baseline standard
requirements by 10 percent, based on the 2022 Building Energy Efficiency Standards requirements
GHG-PDF-2
Use of natural heating and cooling features.
GHG-PDF-3
Use of improved insulation.
GHG-PDF-4
Installation of PV panels.
GHG-PDF-5
Use of efficient and durable roofing materials and exterior finishes.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-3
Response to Comments January 2026
Issue Area Project Design Features (PDFs) and Best Management Practices (BMPs)
GHG-PDF-6
Use of efficient interior finishes.
Water Conservation GHG-PDF-7
Water-efficient plumbing fixtures (17 to 31 percent of GHG emissions associated with non-residential indoor water use).
Solid Waste
Conservation
GHG-PDF-8
Use of recycled foundation materials.
Other GHG-PDF-9
No combustion of natural gas (100 percent reduction in emissions from natural gas use).
4.10 Noise
Threshold A:
Would the project
result in generation of
a substantial
temporary or
permanent increase in
ambient noise levels
in the vicinity of the
project in excess of
standards established
in the local general
plan or noise
ordinance, or
applicable standards
of other agencies?
BMP NOISE-1
Noise Study for Phase 3. A new noise study shall be conducted after completion of Phase 2 construction and prior to the start
of Phase 3 construction to determine potential noise impacts of Phase 3 construction activities. The information in this study
will be used in support of the Lead Agency’s approval of Phase 3 and potential preparation of a Noise Mitigation Plan for
Phase 3 construction if necessary.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-4
Response to Comments January 2026
Table 4.0-2
FINAL MITIGATION MONITORING AND REPORTING PROGRAM
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
4.2 Air Quality
Threshold A:
Would the project
result in a
cumulatively
considerable net
increase of any
criteria pollutant for
which the project
region is non-
attainment under an
applicable federal or
state ambient air
quality standard?
MM AQ-1
Replace Gas Powered Landscape Equipment with Zero-
Emission Landscape Equipment (listed at A-1 in the
aforementioned CAPCOA Handbook, and LL-1 in CalEEMod).
Less than
Significant
Project Applicant/City of
Redlands
During Project
Operation
MM AQ-2
Provide Electric Vehicle Charging Infrastructure (listed as T-
14 in CalEEMod).
Less than
Significant
Project Applicant/City of
Redlands
Include in Building
Plans; and During
Project Construction
MM TRANS-1
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will implement a
commute trip reduction program consisting of information
sharing and marketing to promote and educate employees
about their travel choices to the project site beyond driving
such as carpooling, taking transit, walking, and biking,
thereby reducing VMT and GHG emissions.
Less than
Significant
Project Applicant/City of
Redlands
During Project
Operation
MM TRANS-2
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will implement a
ridesharing program for employees with similar commutes
with funding requirements for employers. Ridesharing
encourages carpooled vehicle trips in place of single-
occupied vehicle trips, thereby reducing the number of trips,
VMT, and GHG emissions. Existing programs including IE
Less than
Significant
Project Applicant/City of
Redlands
During Project
Operation
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-5
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
Commuter can be leveraged for this measure.
MM TRANS-3
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will install and maintain
end-of-trip facilities for employee use. End-of-trip facilities
include bike parking, bike lockers, showers, and personal
lockers. The provision and maintenance of secure bike
parking and related facilities encourages commuting by
bicycle, thereby reducing VMT and GHG emissions.
Less than
Significant
Project Applicant/City of
Redlands
Include in Building
Plans; and During
Project Construction
MM TRANS-4
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will implement an
employer-sponsored vanpool service. Vanpooling is a
flexible form of public transportation that provides groups
of 5 to 15 people with a cost-effective and convenient
rideshare option for commuting. The mode shift from long-
distance, single-occupied vehicles to shared vehicles reduces
overall commute VMT, thereby reducing GHG emissions. It
was assumed that up to 2% of employees would participate
in the vanpool program.
Less than
Significant
Project Applicant/City of
Redlands
During Project
Operation
4.3 Biological Resources
Threshold A: Would
the Project have a
substantial adverse
effect, either directly
or through habitat
modifications, on any
species identified as a
MM BIO-1: Crotch’s Bumble Bee Surveys
To ensure the proposed project does not result in direct or
indirect impacts to the Crotch’s bumble bee, focused
presence/absence surveys shall be conducted based on the
CDFW Survey Considerations for California Endangered
Species Act (CESA) Candidate Bumble Bee Species Guidelines
(June 6th, 2023), (CDFW, 2023). Focused surveys shall be
Less than
Significant
Qualified
biologist/Applicant/City
of Redlands
Before
beginning of
ground
disturbance;
three surveys
shall be
conducted with
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-6
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
candidate, sensitive,
or special-status
species in local or
regional plans,
policies, or
regulations, or by the
California Department
of Fish and Wildlife or
U.S. Fish and Wildlife
Service?
started during the colony active period and when floral
resources are present for the species by a qualified
entomologist. Specifically, three surveys shall be conducted
with at least two weeks between surveys from April to June.
All regions within the project site where suitable floral
resources are present shall be surveyed by walking
meandering transects at least one hour after sunrise and/or
at least two hours before sunset (ideally between 9am and
1pm) on warm sunny days with winds below eight miles pe r
hour.
Focused surveys shall be conducted for a minimum of one
person-hour of searching per three acres of suitable habitat.
Bumble bees shall be captured with a net from blooms,
avoiding destruction of the flower when possible. Each bee
shall be carefully transferred into a sterile vial and moved to
a cooler with only one bee per vial to avoid disease spread.
The bee shall be kept in the vial for no more than 10 minutes
in ambient temperature before being placed in a cooler as
they have a tendency to over-heat (the amount of time will be
decreased on hotter days). The vial shall be placed in a cooler
at a temperature above 25 degrees Fahrenheit, as lower
temperatures could freeze and kill the bee. The results of the
focused surveys shall be summarized in a letter report
including graphics and recommendations. At a minimum, the
survey letter report shall provide the following:
1. A description and map of the survey area, focusing
on areas that could provide suitable habitat for
Crotch’s bumble bee.
2. Field survey conditions that shall include name(s) of
qualified entomologist(s) and brief qualifications;
date and time of survey; survey duration; general
weather conditions; survey goals, and species
at least two
weeks between
surveys from
April to June.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-7
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
searched.
3. Map(s) showing the location of nests/colonies; and,
4. A description of physical (e.g., soil, moisture, slope)
and biological (e.g., plant composition) conditions
where each nest/colony is found. A sufficient
description of biological conditions, primarily
impacted habitat, shall include native plant
composition (e.g., density, cover, and abundance)
within impacted habitat (e.g., species list separated
by vegetation class; density, cover, and abundance of
each species).
If the species is detected onsite, the CDFW shall be contacted
to determine appropriate conservation measures to prevent
direct/indirect impacts to the species, or acquisition of an
Incidental Take Permit (ITP). To initiate the ITP process, the
applicant or representative shall contact the appropriate
CDFW Regional Office and submit a completed ITP
application.
MM BIO-2: Focused and Preconstruction Burrowing Owl
Surveys
To ensure the proposed project does not result in direct or
indirect impacts to the burrowing owl, focused surveys shall
be conducted in accordance with the March 7, 2012, Staff
Report on Burrowing Owl Mitigation (CDFG, 2012) which
recommends both a breeding and non-breeding season
survey. Specifically, a total of four surveys shall be conducted
by a qualified avian biologist during the breeding season: 1)
at least one site visit between February 15 and April 15, and
2) a minimum of three surveys, at least three weeks apart,
between April 15 and July 15, with at least one visit after June
15. Non-breeding season surveys shall include four surveys
Less than
Significant
Qualified
biologist/Applicant/City
of Redlands
A total of four surveys
shall be conducted by
a qualified avian
biologist during the
breeding season: 1) at
least one site visit
between February 15
and April 15, and 2) a
minimum of three
surveys, at least three
weeks apart, between
April 15 and July 15,
with at least one visit
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-8
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
spread out evenly from July 15 to February 15. A report of the
findings prepared by a qualified biologist shall be submitted
to the City of Redlands prior to any permit or approval for
ground disturbing activities.
Regardless of the findings of the focused surveys, a burrowing
owl preconstruction survey shall be conducted no less than
14 days prior to the initiation of ground-disturbing activities
to ensure protection for this species including a survey
conducted with 24 hours of start of work. The
preconstruction surveys shall be conducted in compliance
with CDFW guidelines (CDFG, 2012). A report of the findings
prepared by a qualified biologist shall be submitted to the
City of Redlands prior to any permit or approval for ground
disturbing activities. If burrowing owls are not detected
onsite, the proposed project may proceed. However, if project
initiation is delayed more than 14 days, updated
preconstruction surveys may be required.
If burrowing owls are detected onsite during the focused or
preconstruction surveys, a burrowing owl monitoring and/or
relocation plan shall be developed and approved by the City
of Redlands, CDFW and USFWS prior to any permit or
approval for ground disturbing activities. At a minimum, the
plan shall include the following:
1. Burrowing owl status, distribution and habitat utilization
within and adjacent to the project site.
2. Conservation objectives and goals developed in
cooperation with CDFW and USFWS.
3. Results of burrowing owl monitoring activities.
a. 350-foot minimum protective (no work) zone
shall be designated around each of the occupied
burrow sites and delineated by orange silt
after June 15. Non-
breeding season
surveys shall include
four surveys spread
out evenly from July
15 to February 15.
Regardless of the
findings of the focused
surveys, a burrowing
owl preconstruction
survey shall be
conducted no less
than 14 days prior to
the initiation of
ground-disturbing
activities to ensure
protection for this
species including a
survey conducted
with 24 hours of start
of work.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-9
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
fencing. The installation of the fencing shall be
monitored by a qualified biologist to ensure owls
are not directly or indirectly impacted as a result
of fence installation. The monitoring biologist
will also be responsible for directing where the
fencing shall be installed.
b. A qualified monitoring biologist shall monitor
the owls weekly during the non-breeding season
to determine if the 350-foot protective zone is
adequate for their protection. The weekly
monitoring events will also provide critical
information regarding the status of the species
onsite for purposes of developing a relocation
plan.
c. A qualified monitoring biologist shall conduct an
initial environmental briefing with any
contractors which will be working onsite. The
briefing shall include a discussion of burrowing
owl natural history, identification of burrowing
owl non-breeding season protection zones, and
summary of penalties for directly and/or
indirectly impacting the species.
d. A qualified monitoring biologist shall be
authorized to stop all work activities in the event
potential direct and/or indirect impacts to
burrowing owl may occur as a result of proposed
staging activities.
e. Monthly updates on the monitoring efforts
including recommendations, as warranted, shall
be submitted to the City of Redlands, CDFW and
USFWS.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-10
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
4. Passive and/or active relocation activities.
5. Burrowing owl management activities for active
relocation sites.
Based on the candidacy or listing status of the species at the
time of surveys, if detected, acquisition of an Incidental Take
Permit may also be required.
MM BIO-3: Pre-Construction Breeding Bird Survey
To maintain compliance with the MBTA and California Fish
and Game Code §§ 3503, 3503.5, and 3513, and to avoid
impacts or take of migratory non-game breeding birds and
other native birds, their nests, young, and eggs, the following
measures shall be implemented.
Site preparation activities (ground disturbance, construction
activities, staging equipment, and/or removal of trees and
vegetation) for the project shall be avoided, to the greatest
extent possible, during the nesting season of potentially
occurring native and migratory bird species (generally
September 15 to February 15 for songbirds; September 1 to
January 14 for raptors, although the nesting season may be
extended due to weather and drought conditions).
If site preparation activities are proposed during the
nesting/breeding season, the project proponent shall retain a
qualified avian biologist to conduct a pre-activity field survey
prior to the issuance of grading permits for the project to
determine if active nests of species protected by the MBTA or
the California Fish and Game Codes are present in the
construction zone. The nest surveys shall include the project
site where project activities have the potential to cause nest
failure. The survey results shall be provided to the City of
Redlands for review and approval. The project applicant shall
Less than
Significant
Qualified
biologist/Applicant/City
of Redlands
Prior to the issuance
of grading permits for
the project. Pre-
activity field surveys
shall be conducted at
the appropriate time
of day/night, during
appropriate weather
conditions, no more
than three days prior
to the initiation of
project activities.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-11
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
adhere to the following:
1. The project applicant shall retain a qualified biologist
experienced in: identifying local and migratory bird
species of special concern; conducting bird surveys using
appropriate survey methodology; nesting surveying
techniques, recognizing breeding and nesting behaviors,
locating nests and breeding territories, and identifying
nesting stages and nest success;
determining/establishing appropriate avoidance and
minimization measures; and monitoring the efficacy of
implemented avoidance and minimization measures.
2. Pre-activity field surveys shall be conducted at the
appropriate time of day/night, during appropriate
weather conditions, no more than three days prior to the
initiation of project activities. Surveys shall encompass
all suitable areas including trees, shrubs, bare ground,
burrows, cavities, and structures. Survey duration shall
take into consideration the size of the property; density,
and complexity of the habitat; number of survey
participants; survey techniques employed; and shall be
sufficient to ensure the data collected is complete and
accurate.
If no nesting birds are observed during the survey, site
preparation and construction activities may begin. However,
if active nests (including nesting raptors) are located, then
avoidance or minimization measures shall be undertaken in
consultation with the City of Redlands, CDFW and USFW, as
warranted. Measures shall include immediate establishment
of an appropriate buffer zone to be established by a qualified
biologist based on their best professional judgement and
experience. The buffer around the nest shall be delineated
and flagged, and no construction activity shall occur within
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-12
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
the buffer area until a qualified biologist determines nesting
species have fledged and the nest is no longer active, or the
nest has failed. The biologist shall monitor the nest at the
onset of project activities and at the onset of any changes in
such project activities (e.g., increase in number or type of
equipment, change in equipment usage, etc.) to determine the
efficacy of the buffer. If the biologist determines that such
project activities may be causing an adverse reaction, the
biologist shall adjust the buffer accordingly or implement
alternative avoidance and minimization measures, such as
redirecting or rescheduling construction or erecting sound
barriers. All work within these buffers will be halted until the
nesting effort is finished (i.e., the juveniles are surviving
independent from the nest). The onsite biologist shall review
and verify compliance with these nesting avoidance buffers
and shall verify the nesting effort has finished. Work can
resume within these avoidance areas when no other activ e
nests are found.
Birds or their active nests will not be disturbed, captured,
handled or moved. Active nests cannot be removed or
disturbed; however, nests can be removed or disturbed if
determined inactive by a qualified biologist.
If listed bird species are observed within a project site during
the preconstruction survey, the biologist will immediately
map the area and notify the appropriate resource agency to
determine suitable protection measures and/or mitigation
measures and to determine if additional mitigation is
necessary. Project activities may begin within the area only
when concurrence is received from the appropriate resource
agency.
Upon completion of the survey and nesting bird monitoring,
a report shall be prepared and submitted to City of Redlands
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-13
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
for review and approval prior to initiation of construction
activities.
MM BIO-4: Preconstruction Bat Survey
Prior to implementation of project activities, a qualified bat
biologist shall be retained to determine whether potential
roosting sites for yellow bats may be affected. For large
ornamental trees and palms suitable for bat
roosting/nursery, exit counts and acoustic surveys shall be
performed prior to initial ground disturbance, vegetation or
structure removal to determine whether the project site and
a 300-foot buffer supports a nursery or roost. This work will
occur between late -spring and late summer and/or in the fall
(generally mid-March through late October).
If the results of the bat survey find a total of a single roosting
individual of a special status bat species or 25 or more
individuals of a non-special status bat species with potential
to be present in the project site, a Bat Management Plan shall
be developed by a qualified bat biologist to ensure mortality
to bats does not occur. For each location confirmed to be
occupied by bats, the Bat Management Plan must provide
details both in text and graphically where exclusion
devices/and or staged tree/palm re moval will need to occur,
the timing for exclusion work and the timeline and
methodology needed to exclude the bats. The plan will need
to be reviewed and approved by the City of Redlands and
CDFW prior to disturbance of the roosts. The Bat
Management Plan shall include:
1. Bat status, distribution and habitat information within
and adjacent to the project site.
2. Results of the bat surveys.
Less than
Significant
Qualified
biologist/Applicant/City
of Redlands
Prior to
implementation of
project activities
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-14
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
3. Project-specific measures for noise attenuation devices,
acoustic and visual monitoring during high-vibration and
sound activities (such as saw cutting, jackhammering,
and pile driving), visual disturbance buffers, and the
installation of bat exclusion devices to safely and
humanely evict bats outside of the maternity season, in
the event they are needed.
4. Exclusion methods may include use of one-way doors at
roost entrances (bats may leave, but not re enter), or
sealing roost entrances when the site can be confirmed to
contain no bats. Exclusion efforts may be restricted
during periods of sensitive activity (e.g., during
hibernation or while females in maternity colonies are
nursing young).
5. If roosts cannot be avoided or it is determined that
construction activities may cause roost abandonment,
such activities may not commence until permanent,
elevated bat houses have been installed outside of, but
near the construction area. Placement and he ight will be
determined by a qualified wildlife biologist, but the
height of bat house will be at least 15 feet. Bat houses will
be multi-chambered and be purchased or constructed in
accordance with CDFW standards. The number of bat
houses required will be dependent upon the size and
number of colonies found, but at least one bat house will
be installed for each pair of bats (if occurring
individually), or of sufficient number to accommodate
each colony of bats to be relocated.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-15
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
6. Consultation with the California Department of Fish and
Wildlife would occur to finalize preparation of the Bat
Management Plan for inclusion in other permits that are
required from the CDFW, such as a Lake or Streambed
Alteration Agreement (LSAA) under Section 1600-1616
of the Fish and Game Code. Each LSAA usually contains a
section titled Measures to Protect Fish and Wildlife
Resources, for which this plan would be incorporated.
7. A description of incidental monitoring and reporting that
will take place during construction.
8. Details for post-construction monitoring.
9. Note that the Bat Management Plan is triggered only if
the project requires high-vibration and sound activities
causing shaking or vibration, generally resulting from
saw cutting, jackhammering, pile driving, or similar
activities (within 150 feet of a bat colony).
MM BIO-5: Jurisdictional Delineation and Permitting
Prior to approval of grading permits and initiation of project
activities, a qualified biologist shall conduct a formal
jurisdictional delineation on the project site to determine the
presence/absence of jurisdictional resources, extent of
jurisdictional areas, and impacts to resources regulated by
the USACE, RWQCB, and CDFW. The delineation shall be
conducted using the current USACE methods and definition
of “waters of the U.S.” (most current as of this writing is March
2025 notice and data sheets) and the methods and wetland
definitions specified in the California State Wetland Definition
and Procedures for Discharges of Dredged or Fill Material to
Waters of the State (Procedures) (SWRCB, 2019) to delineate
Less than
Significant
Qualified
biologist/Applicant/City
of Redlands
Prior to approval of
grading permits and
initiation of project
activities
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-16
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
waters of the state.
Upon completion of the jurisdictional delineation survey, a
jurisdictional delineation report shall be prepared according
to the Minimum Standards for Acceptance of Aquatic
Resources Delineation Reports for the USACE, Los Angeles
Regulatory District (USACE-LA, 2017). This report shall be
submitted to City of Redlands for review and approval.
If jurisdictional areas are present on the project site, the
project applicant shall obtain a Clean Water Act Section 404
permit, California Fish and Game Code Section 1602 Lake or
Streambed Alteration Agreement from CDFW and a CWA 401
or WDR permit issued by the RWQCB (Santa Ana RWQCB-
Region 8) pursuant to the California Water Code § 13260, as
warranted. If required, these permits shall be obtained prior
to issuance of a grading permit. Construction activities
(including but not limited to fencing, staging, and clearing)
will not commence unless all requirements of the USACE,
CDFW, RWQCB have been met and the RWQCB has issued a
WDR permit, letter of permission, or other project-specific
approval. All conditions of these permits shall be adhered to
during project development.
4.4 Cultural Resources
Threshold A: Would
the Project cause a
substantial adverse
change in the
significance of a
historical resource
MM CUL-1
The project applicant shall retain an archaeologist who meets
the Secretary of the Interior’s Professional Qualifications
Standards for Archaeology to conduct monitoring of
subsurface ground disturbance during construction
activities. The archaeologist shall also take the opportunity to
Less than
Significant
Qualified archaeologist;
project applicant; and
City of Redlands
Before beginning of
ground-disturbing
work; and during site
clearance
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-17
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
pursuant to §
15064.5?
And
Threshold B: Would
the Project cause a
substantial adverse
change in the
significance of an
archaeological
resource pursuant to §
15064.5?
re-survey the parcel’s ground surface as the vegetation is
cleared for construction work. If unanticipated cultural
resource discoveries are made the archaeologist will be
afforded the necessary time to recover, analyze, and curate
the find(s). The qualified archaeologist will recommend the
extent of archaeological monitoring necessary to ensure the
protection of any other resources that may be in the area. Any
identified cultural resources shall be recorded on the
appropriate DPR 523 (A-L) form and filed with the Eastern
Information Center.
MM CUL-2
If historical or unique archaeological resources are
discovered during construction activities, the contractor shall
halt construction activities in a 50-foot radius and notify the
project proponent and the City of Redlands. A Secretary of the
Interior qualified archaeologist (Principal Archaeologist)
shall be notified and afforded the necessary time to recover,
analyze, and curate the find(s). The Principal Archaeologist
shall recommend the extent of archaeological monitoring
necessary to ensure the protection of any other resources
that may be in the area. Construction activities may continue
on other parts of the project site while evaluation and
treatment of historical or unique archaeological resources
takes place.
The Principal Archaeologist, depending on the type and
extent of the finds, may prepare an Archaeological Resources
Treatment Plan (ARTP) to guide future monitoring, the
recovery of cultural resources, analysis and reporting of the
finds, and curation of the finds. The ARTP shall be submitted
to the City and the project proponent for approval. The ARTP
shall include the following:
Less than
Significant
Qualified archaeologist;
project applicant; and
City of Redlands
During construction
activities
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-18
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
1. Results of the Cultural Resources Inventory:
archaeological resources and their condition and threats
on the project site.
2. Impact assessment.
3. Mitigation strategies, which may include:
a. Potential avoidance measures.
b. Data recovery steps such as excavation and analysis
of an archaeological site to collect information before it is
destroyed.
c. Conservation measures such as cleaning, conserving,
studying, cataloging, and storing recovered
archaeological materials and associated records.
4. Procedures for archaeological monitoring during
construction to record exposed resources.
5. Protocols for unanticipated discoveries: what
construction workers should do if they find cultural
resources unexpectedly, including ceasing work and
contacting a qualified archaeologist.
6. Consultation with relevant groups, such as Native
American tribes, historians, and regulatory agencies, to
determine the value of resources and appropriate
treatment measures.
7. Documenting and reporting format and procedures.
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-19
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
Threshold C: Would
the Project disturb
human remains,
including those
interred outside of
dedicated cemeteries?
MM CUL-3
If human remains are encountered during excavations
associated with this project, all work shall stop within a 30 -
foot radius of the discovery, and the San Bernardino County
Coroner will be notified (§ 5097.98 of the Public Resources
Code). The Coroner will determine whether the remains are
recent human origin or older Native American ancestry. If the
coroner, with the aid of the supervising archaeologist,
determines that the remains are prehistoric, they will contact
the Native American Heritage Commission (NAHC). The
NAHC will be responsible for designating the Most Likely
Descendant (MLD). The MLDS (either an individual or
sometimes a committee) will be responsible for the ultimate
disposition of the remains, as required by § 7050.5 of the
California Health and Safety Code. The MLD will make
recommendations within 24 hours of their notification by the
NAHC. These recommendations may include scientific
removal and nondestructive analysis of human remains and
items associated with Native American burials (§ 7050.5 of
the Health and Safety Code).
Less than
Significant
Qualified archaeologist;
project applicant; and
City of Redlands
During excavations
associated with this
project
4.5 Geology and Soils
MM-GEO-1
A qualified paleontologist, approved by the City of Redlands
and the Western Science Center, must be retained prior to
excavation and grading activities at the project site.
1. Prior to the earth-moving activities, the
paleontologist shall develop a site-specific
Paleontological Resources Impact Mitigation
Program (PRIMP) to be implemented in support of
Less than
Significant
Qualified
paleontologist/project
applicant; City of
Redlands
Prior to excavation
and grading activities
at the project site; and
during excavation and
grading activities
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-20
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
the Project in order to mitigate potential adverse
impacts to paleontological resources. The PRIMP
shall follow guidelines developed by the Society for
Vertebrate Paleontology and include monitoring of
ground disturbance activities in sediments that are
likely to include paleontological resources, specimen
recovery, and screen washing; preparation of any
collected specimens to the point of identification;
curation of any collected specimens to a museum
repository with permanent, retrievable storage; and
preparation of a final paleontological survey report
that would provide details of monitoring, fossil
identification, and repository arrangements. The
Project Applicant shall then comply with the
recommendations of the Project Paleontologist and
requirements of the PRIMP. At a minimum, the
PRIMP shall include the following:
1. Project and location
2. Regulatory setting
3. Geology of the site
4. Paleontological resources and survey results
5. Paleontological sensitivity of the site
6. Paleontological resources mitigation and
monitoring measures such as:
a. Coordination with construction
personnel and training
b. Details of training and materials
c. Frequency and location of inspections
d. When and how grading/excavation
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-21
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
activities will be diverted
e. Procedures of fossil recovery, removal,
treatment, transport, and deposition
facility
f. Recording, documentation, and
reporting procedures
2. Before the mitigation program begins, the
paleontologist or monitor must coordinate with the
appropriate construction contractor personnel to
provide information regarding the requirements of
the City or Redlands, as applicable, for the protection
of paleontological resources. Contractor personnel
shall be briefed on the procedures to follow in the
event that fossil remains, and a previously
unrecorded fossil site are encountered by earth-
moving activities, particularly when the monitor is
not on site.
3. The qualified paleontologist shall perform periodic
inspections of excavation and grading activities at
the project site to determine the presence of
fossiliferous soils. The frequency and location of
inspections shall be specified in the PRIMP and will
depend on the depth of excavation and grading
activities and the materials being excavated. If
paleontological materials are encountered, the
paleontologist must temporarily divert or redirect
the grading and excavation activities in the area of
the exposed material to facilitate evaluation and, if
necessary, salvage. The authority of the
paleontologist to temporarily halt construction in
part of the project site must be included in the
project grading and construction plans. A copy of the
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-22
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
report of the paleontological survey is submitted to
the Western Science Center. Any fossils recovered
during mitigation shall be deposited in an accredited
and permanent scientific institution for the benefit of
current and future generations.
4.7 Greenhouse Gas Emissions
Threshold A: Would
the Project generate
greenhouse gas
emissions, either
directly or indirectly,
that may have a
significant impact on
the environment?
MM GHG-1
Using alternative fuels for construction equipment (0 to 22
percent).
MM GHG-2
Using electric or hybrid construction equipment (2.5 to 80
percent of GHG emissions from equipment that is electric or
hybrid if used 100 percent of the time).
MM GHG-3
Limiting construction equipment idling beyond regulation
requirements (varies with the amount of project idling
occurring and the amount reduced).
MM GHG-4
Instituting a heavy-duty offroad vehicle plan (range of
effectiveness is not applicable because it only ensures
compliances with other mitigation measures). At a minimum,
the heavy-duty offroad vehicle plan shall include the
following:
1. Fleet reporting and labeling: diesel-fueled vehicles
operating in California, with engines 25 horsepower or
greater, must be reported to CARB through the online
DOORS system and labeled appropriately.
Significant
and
Unavoidable
Project applicant and
project construction
contractor
Include in project
building plans; and
during project
construction
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-23
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
2. Emission reduction strategies: how you will meet
emission reduction requirements by:
a. Retiring/Replacing Vehicles: Phase out older, dirtier
engines by replacing them with new, cleaner ones or
equipment that meets the latest emission standards.
b. Engine repowering: plan/schedule to replace older
off-road diesel engines with newer, cleaner ones.
c. Verified Diesel Emission Control Strategies (VDECS):
Install verified diesel emission control strategies
(e.g., exhaust retrofits) on existing engines.
3. Fuel acquisition: fleets must begin (2024) using
renewable diesel (R99 or R100).
4. Idling restrictions: limit idling to five minutes and apply
a written idling policy.
5. Fleet average goals: fleet average emission level
standards/balancing emissions from vehicles.
MM GHG-5
Implementing a construction vehicle inventory tracking
system (range of effectiveness does not reduce GHG
emissions in and of itself; it only ensures compliance with
other mitigation measures).
4.12 Transportation
Threshold B: Would
the project conflict or
be inconsistent with
CEQA Guidelines
section 15064.3,
subdivision (b)?
MM TRANS-1
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will implement a
commute trip reduction program consisting of information
sharing and marketing to promote and educate employees
about their travel choices to the project site beyond driving
such as carpooling, taking transit, walking, and biking,
Significant
and
Unavoidable
Project applicant/City of
Redlands
Prior to issuance of a
certificate of
occupancy for each
phase of the project
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-24
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
thereby reducing VMT and GHG emissions.
MM TRANS-2
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will implement a
ridesharing program for employees with similar commutes
with funding requirements for employers. Ridesharing
encourages carpooled vehicle trips in place of single -
occupied vehicle trips, thereby reducing the number of trips,
VMT, and GHG emissions. Existing programs including IE
Commuter can be leveraged for this measure.
Significant
and
Unavoidable
Project applicant/City of
Redlands
Prior to issuance of a
certificate of
occupancy for each
phase of the project
MM TRANS-3
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will install and
maintain end-of-trip facilities for employee use. End-of-trip
facilities include bike parking, bike lockers, showers, and
personal lockers. The provision and maintenance of secure
bike parking and related facilities encourages commuting by
bicycle, thereby reducing VMT and GHG emissions.
Significant
and
Unavoidable
Project applicant/City of
Redlands
Prior to issuance of a
certificate of
occupancy for each
phase of the project
MM TRANS-4
Prior to issuance of a certificate of occupancy for each phase
of the project, the project proponent will implement an
employer-sponsored vanpool service. Vanpooling is a
flexible form of public transportation that provides groups
of 5 to 15 people with a cost-effective and convenient
rideshare option for commuting. The mode shift from long-
distance, single-occupied vehicles to shared vehicles
reduces overall commute VMT, thereby reducing GHG
emissions. It was assumed that up to 2% of employees
Significant
and
Unavoidable
Project applicant/City of
Redlands
Prior to issuance of a
certificate of
occupancy for each
phase of the project
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-25
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
would participate in the vanpool program.
4.13 Tribal Cultural Resources
Threshold A:Would
the project cause a
substantial adverse
change in the
significance of a tribal
cultural resource,
defined in Public
Resources Code
section 21074 as
either a site, feature,
place, cultural
landscape that is
geographically defined
in terms of the size
and scope of the
landscape, sacred
place, or object with
cultural value to a
California Native
American tribe, and
that is:
i. Listed or eligible
for listing in the
California
Register of
Historical
Resources, or in a
local register of
historical
MM-TCR-1: Retain a Native American Monitor Prior to
Commencement of Ground-Disturbing Activities
1. The project applicant shall retain a Native American
Monitor(s) from one or more Consulting Tribe(s),
including Gabrieleño Band of Mission Indians – Kizh
Nation. Monitors from more than one tribe may
coordinate and utilize a rotating schedule at their
discretion.. The monitor(s) shall be retained prior to the
commencement of any “ground-disturbing activity” for
the subject project at all project locations (i.e., both on -
site and any off-site locations that are included in the
project description/definition and/or required in
connection with the project, such as public improvement
work). “Ground-disturbing activity” shall include, but is
not limited to, demolition, pavement removal, potholing,
auguring, grubbing, tree removal, boring, grading,
excavation, drilling, and trenching.
2. A copy of the executed monitoring agreement with each
monitoring Consulting Tribe(s), including Gabrieleño
Band of Mission Indians – Kizh Nation, shall be submitted
to the lead agency prior to the earlier of the
commencement of any ground-disturbing activity, or the
issuance of any permit necessary to commence a ground-
disturbing activity.
3. The monitor(s), including Gabrieleño Band of Mission
Indians – Kizh Nation, will complete daily monitoring
logs that will provide descriptions of the relevant
ground-disturbing activities, the type of construction
Less than
Significant
Native American
Monitor/Project
Applicant/City of
Redlands
Prior to
Commencement of
Ground-Disturbing
Activities; and during
ground-disturbing
activities
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-26
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
resources as
defined in Public
Resources Code
§ 5020.1(k); or
ii. A resource
determined by
the lead agency,
in its discretion
and supported by
substantial
evidence, to be
significant
pursuant to
criteria set forth
in subdivision (c)
of Public
Resource Code
§ 5024.1. In
applying the
criteria set forth
in subdivision (c)
of Public
Resources Code
Section 5024.1,
the lead agency
shall consider the
significance of
the resource to a
California Native
American Tribe.
activities performed, locations of ground-disturbing
activities, soil types, cultural-related materials, and any
other facts, conditions, materials, or discoveries of
significance to the Tribe. Monitor logs will identify and
describe any discovered TCRs, including but not limited
to, Native American cultural and historical artifacts,
remains, places of significance, etc., (collectively, tribal
cultural resources, or “TCR”), as well as any discovered
Native American (ancestral) human remains and burial
goods. Copies of monitor logs will be provided to the
project applicant/lead agency upon written request to
the Tribe, including Gabrieleño Band of Mission Indians –
Kizh Nation.
4. On-site tribal monitoring shall conclude upon the latter
of the following (1) written confirmation to the
Consulting Tribe(s) , including Gabrieleño Band of
Mission Indians – Kizh Nation, from a designated point
of contact for the project applicant that all ground-
disturbing activities and phases that may involve ground-
disturbing activities on the project site or in connection
with the project are complete; or (2) a determination and
written notification by the Consulting Tribe(s) , including
Gabrieleño Band of Mission Indians – Kizh Nation, to the
project applicant and lead agency that no future, planned
construction activity and/or development/construction
phase at the project site possesses the potential to impact
TCRs.
MM-TCR-2: Unanticipated Discovery of Tribal Cultural
Resource Objects (Non-Funerary/Non-Ceremonial)
1. Upon discovery of any TCRs, all construction activities in
the immediate vicinity of the discovery shall cease (i.e.
Less than
Significant
Native American
Monitor/Project
Applicant/City of
Redlands
Prior to
Commencement of
Ground-Disturbing
Activities; and during
ground-disturbing
❖ SECTION 4.0 - FINAL MITIGATION MONITORING AND REPORTING PROGRAM ❖
7214/Kaiser Permanente Redlands Medical Center PEIR Page 4-27
Response to Comments January 2026
Issue Area Mitigation Measures (MMs)
Level of
Significance
After
Mitigation
Responsible Party/
Monitoring Party
Implementation
Stage
not less than the surrounding 50 feet) and shall not
resume until the discovered TCR has been fully assessed
by the Consulting Tribe(s), including Gabrieleño Band of
Mission Indians – Kizh Nation, monitor(s) and/or
archaeologist(s).
activities
MM-TCR-3: Unanticipated Discovery of Human Remains and
Associated Funerary or Ceremonial Objects
1. Native American human remains are defined in PRC
5097.98 (d)(1) as an inhumation or cremation, and in any
state of decomposition or skeletal completeness.
Funerary objects, called associated grave goods in Public
Resources Code Section 5097.98, are also to be treated
according to this statute.
2. If Native American human remains and/or grave goods
are discovered or recognized on the project site, then
Public Resource Code 5097.9 as well as Health and Safety
Code Section 7050.5 shall be followed.
3. Human remains and grave/burial goods shall be treated
alike per California Public Resources Code section
5097.98(d)(1) and (2).
4. Preservation in place (i.e., avoidance) is the preferred
manner of treatment for discovered human remains
and/or burial goods.
5. Any discovery of human remains/burial goods shall be
kept confidential to prevent further disturbance.
Less than
Significant
Native American
Monitor/Project
Applicant/City of
Redlands
Prior to
Commencement of
Ground-Disturbing
Activities; and during
ground-disturbing
activities