HomeMy WebLinkAboutContracts & Agreements_72-2026AGREEMENT BETWEEN
CITY OF HIGHLAND AND CITY OF REDLANDS
FOR
DESIGN PHASE FOR THE HIGHLAND/REDLANDS REGIONAL
GAP CONNECTOR PROJECT
FOR ORANGE STREET FROM 0.25 MILES NORTH OF PIONEER AVENUE TO
GREENSPOT ROAD IN THE CITIES OF HIGHLAND AND REDLANDS
This agreement is made and entered into this 19' day of May, 2026 ("Effective Date"), by and between the
City of $ighland (hereinafter referred to as HIGHLAND) and the City of Redlands (hereinafter referred to
as REDLANDS), sometime individually referred to as a PARTY and, collectively referred to as the
PARTIES.
RECITALS
WHEREAS HIGHLAND and REDLANDS are working cooperatively to deliver a regional
bikeway/walkway project entitled HIGHLAND/REDLANDS REGIONAL GAP CONNECTOR
PROJECT (hereinafter referred to as the PROJECT); and
WHEREAS HIGHLAND is the Implementing agency and REDLANDS is the Partnering Agency; and
WHEREAS the PROJECT lies within the jurisdictions of HIGHLAND and REDLANDS; and
WHEREAS W.H. Lochner, Inc. is contracted to provide additional plans, specifications, and estimate
(collectively referred to as DESIGN) services of the PROJECT at a total cost of $309,731; and
WHEREAS the PARTIES wish to enter into a Cooperative Agreement to cooperate in the implementation
of the PROJECT, delineate responsibilities and funding commitments relative to DESIGN services of the
PROJECT; and
WHEREAS the PARTIES acknowledge that each PARTY is responsible for the full costs of the portion of
the DESIGN located within its respective jurisdictional boundaries; and
WHEREAS the PARTIES recognize that PROJECT costs are subject to change and it is the intent of the
PARTIES that each PARTY pay their share of final PROJECT costs, net of grant funding; and
NOW THEREFORE, in consideration of the mutual promises contained herein, the PARTIES agree to the
following:
Page 1 of 6
IAcmo\Agreements\Attaehment B - Highland Cooperative Agreement.bm.05.05.2026.FY2526-169.doex
SECTION I
HIGHLAND agrees to:
1. Act as Implementing Agency in the execution of DESIGN services within HIGHLAND and
REDLANDS. As such, HIGHLAND shall be the sole PARTY that contracts with consultants for
DESIGN services.
2. Be responsible for the full DESIGN costs of the PROJECT located within HIGHLAND, totaling
$251,881.
3. Pay its share of the DESIGN costs if funding is reduced, relinquished, deobligated, or otherwise no
longer available.
4. Invoice REDLANDS for its share of DESIGN costs no more frequently than once per month.
Consultant invoices shall be included with invoices to REDLANDS as the basis for substantiating
the invoice amount for eligible DESIGN expenditures.
5. Establish and maintain an accounting conforming to Generally Accepted Accounting Principles to
support accounting activities associated with the delivery of the DESIGN and produce monthly
reports which clearly identify invoice payments for DESIGN services, including information of
the funding sources.
6. Maintain all source documents, books, and records connected with I-HGHLAND's performance
under this agreement for a minimum of five years from the date the Notice of Completion of the
PROJECT is recorded, or until audit resolution is achieved, whichever is later, and to make all
such supporting information available for inspection and audit by representatives of REDLANDS.
Copies will be made and furnished by HIGHLAND upon request.
7. Abide by all SBCTA, State, and Federal policies, procedures, and regulations applicable to the
PROJECT.
SECTION II
REDLANDS agrees to:
1. Be responsible for the full DESIGN costs of the PROJECT located within REDLANDS, Totaling
$57,850.
2. Pay its share of DESIGN costs if funding is reduced, relinquished, deobligated, or otherwise no
longer available.
3. Pay HIGHLAND for expenditures incurred on that portion of the PROJECT located within
REDLANDS within thirty days following receipt of an invoice from HIGHLAND.
4. Establish and maintain an accounting conforming to Generally Accepted Accounting Principles to
support accounting activities associated with the delivery of the DESIGN and produce monthly
reports which clearly identify invoice payments for DESIGN services, including information of
the funding sources.
Page 2 of 6
1Acmo\Agreements\Attachment B - Highland Cooperative Agreement.bm.05.05.2026.FY2526-169.docx
5. Maintain all source documents, books, and records connected with REDLANDS's performance
under this agreement for a minimum of five years from the date the Notice of Completion of the
PROJECT is recorded, or until audit resolution is achieved, whichever is later, and to make all
such supporting information available for inspection and audit by representatives of HIGHLAND.
Copies will be made and furnished by REDLANDS upon request.
6. Abide by all SBCTA, State, and Federal policies, procedures, and regulations applicable to the
PROJECT.
SECTION III
IT IS MUTUALLY AGREED:
1. That eligible PROJECT expenditures shall be limited to DESIGN -specific work and shall not
include escalation, interest, or other fees.
2. Each PARTY shall defend, indemnify, and hold harmless the other PARTY from and against any
claim of liability, damages, cost or loss, including costs and attorney's fees, from personal injury
or death to persons, or property damage (collectively "Claims") resulting from or arising from
negligence or willful misconduct of either PARTY, it's elected officials, employees, consultants,
or agents, except to the extent such Claims may be caused by or result from negligence or willful
misconduct of either PARTY, it's elected officials, employees, contractors, or agents.
3. This Agreement shall commence on its Effective Date and shall terminate upon HIGHLAND's
provision of a written notice of completion of DESIGN, unless any accounting remains unsettled
between the PARTIES. Upon settlement of any such accounting issues, REDLANDS and
HIGHLAND shall each issue a written notice of completion of DESIGN and this Agreement shall
be deemed terminated as of such date. This Agreement may be extended or terminated by mutual
written consent of the PARTIES.
Page 3 of 6
I: 1cmoWgreement8\Attachment B - ffightand Cooperative Agreement.bm.05.05.2026.FY2526-169.doex
AGREEMENT BETWEEN
CITY OF HIGHLAND AND CITY OF REDLANDS
FOR
DESIGN PHASE FOR THE REGIONAL GAP CONNECTOR IN THE CITIES OF
HIGHLAND AND REDLANDS
FOR ORANGE STREET FROM 0.25 MILES NORTH OF PIONEER AVENUE TO
GREENSPOT ROAD IN THE CITY OF HIGHLAND AND REDLANDS
CITY OF REDL S
Mario Saucedo.
Mayor S, M -24
APPROVED AS TO FORM:
By:—
�,—
y e e M. Abich Garcia
Ci Attorney
ATTEST:
Aai
lv-74-te Donaldson
City CIerk
CITY OF HIGHLAND
By: Z41-�,
Carlos Zaman
City Manager
Date: S/ le / 7.a Z�,
APPROVED AS TO FORM:
By:
M ' el Marr n
CityAtto
Page 4 of b
I:%cmo\Agreements\Attachment B - Highland Cooperative Agreement.bm.05.05.2026.FY2526-169.doex
Attachment A
Fee Estimate
SUB -CONSULTANTS COST SNARE :,]
Mck-off Meeting 1
$772
$579
$193
Design Meetings (up to 4
$4,848
$3 636
$1 212
General Pro'ect Management
$13 400
$10,050
$3 350
SUBTOTAL 1$19,020
$14,265
$4,755
Roadway Plans 100%
$41 924
$1$ 500
1 $23,424
Structural Plans 30%
17 094
$14,280
$2 814
Bridge Plans 95%
25 494
$24,570
$924
Bridge Plans 100%
$8190
$7,266
$924
Ped Brid a Desi n Calculations
$39,030
$30030
Barrier Design Calculations
$13,020
$13,020
Foundation Re ort&Geotechnical Report Udates
78200
78200
$78,200
Hydrology, Flood lain Bridge N draulics and Scour Study
$28 80D
$28,800
$28800
Specifications 100%
$28 566
$21,425
$7 141
Estimates 100%
$19 393
$14 545
$4 848
SUBTOTAL
78 200
$28,800
$290 711
237.616
S53 095
Page 5of6
[:lcmolAgreements\Attachment 13 - Highland Cooperative Agreement.bm.05.05,2026.FY2526-169.doex
Attachment B
Project Limits
Highland/Redlands Regional Connector Gap Project
Completed by
r
City of Highland _
- —.
$Gl BEAT; iE A - - _ e - . -
i WDDLE \
T.179kI \
#lrlailir rT�r': av 5
EucalIus VO
HfGtitANI) �£ ARROYO VERDE
GROVE
' EL8piE ViAF2Y E E EJVTARY
Gr9��sUn! F�ti � J
._-----------.wiw£ v ...._._...-----{
"n9 Tr ti
Gap Project
w/bike counters
Updated 1/26
4� t: senla�'11l
r " "
Wa Trail Phase
Completed by
f
••I',�E:,r
"♦
'
r
City of Redlands
i
1
CCNTRUS VALLEY
fGH SCHC}OL
- . .
Lonnactor Feci}ills-=
� cuss I
w• �N5sli
zcost IIV
C14-. IV
�j waya�llalg ��
Bke GeS wUx �.cu;
0 P�smtR Bike pele ion so,
S � �' Pioneer Ave Ii � -
,,E3lkr I rine
it I:-1 Bke Frills
1
Page 6 of 6
I: IcrnMEreementslAttachment B - Highland Cooperative Agreement.bm.05.05.2026.FY2526-169.docx