Loading...
HomeMy WebLinkAbout8784RESOLUTION NO. 8784 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS ADOPTING A ROAD REPAIR AND ACCOUNTABILITY ACT PROJECT LIST FOR FISCALYEAR 2026/27 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of City of Redlands (City) are aware of the projects proposed for funding in our community, including whichprojects have been completed each fiscal year; and WHEREAS, the City must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $2,061,965 in RMRA funding in Fiscal Year 2026/27 from SB 1; and WHEREAS, this is the tenth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for travelers that would not have otherwise been possible without SB 1; and WHEREAS, the City used the Pavement Management Program (PMP) to determine the SB 1 project list and ensure revenues are being used on the most high -priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS, the funding from SB 1 will supplement other funding to rehabilitate approximately twenty-nine (29) lane miles throughout the City in the PMP 2026 Street Resurfacing Project; and WHEREAS, the SB 1 project list and overall investment in local streets and roads infrastructure will help the City continue funding its Pavement Management Program by focusing on basic maintenance, safety, complete streets infrastructure, and the use of innovative technology, materials, and practices; NOW, THEREFORE, be it resolved by the City Council of the City of Redlands, as follows: Section 1. The foregoing recitals are true and correct. Section 2. The following proposed project list is attached hereto as Exhibit "A" and 11Resolutiom\Res 8700-8799\8784. SBl Project List.bm.05.20.2026.docx may utilize fiscal year 2026/27 Road Maintenance and Rehabilitation Account revenues in their delivery. With the listing ofthese projects in the adopted fiscal year resolution, the City is affirming to the public and the State its intent to fund these projects with Road Maintenance and Rehabilitation Account Revenues: PMP 2026 Street Resurfacing Project will maintain and rehabilitate approximately twenty-nine (29) lane miles of various streets in the City of Redlands. The maintenance efforts include slurry sealing, crack filling, crack sealing, and asphalt grind & overlay. The rehabilitation efforts include removing and replacing existing asphalt, grinding and overlay with hot mix asphalt, and full -depth reclamation. It also includes restriping, replacing traffic loops, manhole rim adjustment, etc. The project is anticipated to begin construction in fall 2026, with an estimated construction timeline of six (6) months and an estimated project life of at least 20 years where reconstruction methods are implemented. Section 3. Adoption of this Resolution has no environmental impact and therefore such action is exempt from review under the California Environmental Quality Act ("CEQA") in accordance with State CEQA guidelines section 15061 (b)(3). ADOPTED, SIGNED AND APPROVED this 2nd day of June, 2026 Mario Saucedo, Mayor ATTEST: Jea e Donaldson, City Clerk 2 I: 1ResolutionslRes 8700-8799\8784. SBI Project List.bm.05.20.2026.doex 1, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof, held on the 2nd day of June, 2026, by the following vote.: AYES: Councilmembers Barich, Tejeda, Davis; Mayor Saucedo NOES: None ABSENT: Mayor Pro Tern Shaw ABSTAINED: None Jea e Donaldson, City Clerk 3 L\Resolutions\Res 8700-8799W84. 5B1 Project List.bm.05.20.2026.docx EXHIBIT "A" PMP 2026 STREET RESURFACING PROJECT [ATTACHED] 19Resolutions\Res 8700-8799\8784. SBl Project List.bm.05.20.2026.doex PMP 2026 STREET RESURFACING PROJECT STREET SEGMENTS No. Street Name From Street To Street 1 5TH ST REDLANDS BLVD ALLEYWAY 2 6TH AVE LA SALLE ST WABASH AVE 3 6THST REDLANDSBLVD OLIVEAVE 4 7TH ST ALLEY N OF CITRUS AVE STATE ST 5 8TH ST CITRUS AVE STATE ST 6 19TH ST CITRUS AVE STATE ST 7 ALTA ST WESTERN AVE LUGONIAAVE 8 ALTA ST PIONEERAVE HUBBARDCT 9 ALTA MIRA DR PUESTADEL SOL Dead End 10 ALTA MIRA PL ALTA MIRA DR Dead End 11 ANDERSON CT Dead End DUKE ST 12 BEAL CT Dead End DUKE ST 13 BEATTIE LN Dead End GLOVER ST 14 BRIAN CT SHIRLEY LN Dead End 15 BRIGETTE CT SHIRLEY LN Dead End 16 CAVE ST PIONEER AVE RIVERVIEW DR 17 CENTRALAVE GROVE ST JUDSON ST 18 CHURCH ST PIONEER AVE RIVERVIEW DR 19 CITRUS AVE EUREKA ST CAJONST 20 IDONNADR HIGHLANDAVE JESSEWAY 21 DOYLEAVE OCCIDENTAL DR DEANNAWAY 22 DUKEST BEAL CT PIONEERAVE 23 EUREKA ST VINE ST CITRUSAVE 24 GABRIELLE WAY LASALLE ST 5TH AVE 25 GLOVER ST PIONEERAVE RIVERVIEW DR 26 GOLDEN WEST DR PATRICIA DR GOLDEN WEST DR 27 IGROVEST PENNSYLVANIAAVE SHERRYWAY 28 GROVE ST COLTON AVE BROCKTON AVE 29 HEATH ST MAPLE AVE Dead End 30 HUBBARDCT ORANGE ST ALTA ST 31 JESSE WAY HIGHLANDAVE Dead End 32 KELLYST SANDRAWAY SAN BERNARDINO AVE 33 KINGSBURY DR PIONEERAVE RIVERVIEW DR 34 KNIGHTSBRIDGE LN WATERFORD AVE KENSINGTON DR 35 LA MIRADA DR VALLEY VIEW DR WABASH AVE 36 MAGNOLIAAVE LAKESIDE AVE BELLEVUE AVE 37 MAPLEAVE DEARBORNST JASMINEST 38 MARIPOSA DR WABASH AVE Dead End 39 MENDOCINOWAY NAPLES AVE WABASH AVE 40 MENLOAVE KENSINGTONDR MERCEDST 41 MIRADERO DR PUESTADEL SOL ALTA MIRA DR 42 MIRADERO PL Dead End MIRADERO DR 43 NELSON ST PENNSYLVANIAAVE SAN BERNARDINO AVE 44 ORIENTALAVE EUREKAST TEXAS ST 45 PARKER CT Dead End KANSAS ST 46 PUESTADEL SOL VIADELSOL SUNSET DR 1of2 PMP 2026 STREET RESURFACING PROJECT STREET SEGMENTS No. Street Name From Street To Street 47 REDLANDSBLVD ORANGEST 1ST ST 48 RIVERBEND DR PIONEER AVE RIVERVIEW DR 49 SANDRA WAY GROVE ST KELLYST 50 SHIRLEY LN LA SALLE ST BRIGETTE CT 51 SINCLAIR CT CHURCH ST DUKE ST 52 STATE ST 6TH ST 7TH ST 53 STICKNEYCIR OCCIDENTAL DR DOYLE AVE 54 SUEAVE JESSE WAY GABRIELLE WAY 55 SUNSET DR MARGARITA DR KIMBALL LN 56 VACHE CIR KINGSBURY DR SOLANO WAY 57 VINE ST CAJON ST 6TH ST 58 VINTON WAY SUNSETDR Dead End 59 IWATERFORDAVE DEARBORN ST KENSINGTON DR 60 IWATERS CT DEAD END ALTAST 61 1 YVETTE CT DEAD END ALTA ST 2of2 - � �N;:-I= ap City of Redlands PMP 2026 Street Resurfacing Project Proposed Locations