Loading...
HomeMy WebLinkAboutContracts & Agreements_172-2026AGREEMENT TO PERFORM PROFESSIONAL SERVICES This agreement for the provision of Professional Environmental Services to Implement the Alabama Street Septage Ponds Remedial Action Plan ("Agreement") is made and entered in this 1st day of September, 2026 ("Effective Date"), by and between the City of Redlands, a municipal corporation ("City") and Rincon Consultants, Inc. a California corporation. ("Consultant"). City and Consultant are sometimes individually referred to herein as a "Party" and, together, as the "Parties." In consideration of the mutual promises contained herein, City and Consultant agree as follows: ARTICLE 1 — ENGAGEMENT OF CONSULTANT 1.1 City hereby engages Consultant to provide professional environmental services related to the implementation of the Alabama Street Septage Ponds Remedial Action Plan services for City (the "Services"). 1.2 The Services shall be performed by Consultant in a professional manner, and Consultant represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional consultants in the industry providing like and similar types of Services. ARTICLE 2 — SERVICES OF CONSULTANT 2.1 The Services that Consultant shall perform are more particularly described in Exhibit "A," titled "Scope of Services," which is attached hereto and incorporated herein by this reference. 2.2 Consultant shall comply with applicable federal, state and local laws and regulations in the performance of this Agreement including, but not limited to, any applicable State prevailing wage laws. ARTICLE 3 — RESPONSIBILITIES OF CITY 3.1 City designates Monica Heredia, Municipal Utilities and Engineering Director, as City's representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City's policies and decisions with respect to performance of the Services. ARTICLE 4 — PERFORMANCE OF SERVICES 4.1 Consultant shall perform and complete the Services in a prompt and diligent manner in accordance with the schedule set forth in Exhibit "B," titled "Project Schedule," which is attached hereto and incorporated herein by reference. 4.2 The term of this Agreement shall be for a period of three (3) years commencing as of the Effective Date, unless terminated earlier as provided herein. 1 1Acuno\Agreement9\Rincon Professional Services Agreement.bm.08.19.2026.FY2728-29.doc 4.3 If Consultant's Services include deliverable electronic visual presentation materials, such materials shall be delivered in a form, and made available to City, consistent with City Council -adopted policy for the same. It shall be the obligation of Consultant to obtain a copy of such policy from City staff. ARTICLE 5 — PAYMENTS TO CONSULTANT 5.1 Total compensation for Consultant's performance of the Services shall not exceed the amount of six hundred forty thousand ($640,000.00). City shall pay Consultant on a time and materials basis up to the not to exceed amount in accordance with Exhibit "C," titled ("Fee Schedule") which is attached hereto and incorporated herein by reference. 5.2 Consultant shall submit monthly invoices to City describing the Services performed during the preceding month. Consultant's invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom, and a description of reimbursable expenses related to the Services. City shall pay Consultant no later than thirty (30) days after receipt and approval by City of Consultant's invoice. 5.3 Any notice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section: CITY: CONSULTANT: City Clerk Ryan Thacher, Principal City of Redlands Rincon Consultants, Inc. 35 Cajon Street 2060 Knoll Drive P.O. Box 3005 (mailing) Ventura, CA 93003 Redlands, CA 92373 rthacher@rineonconsultants.com jdonaldson@cityofredlands.org Phone:831-566-3081 Phone: (909) 798-7531 ARTICLE 6 — INSURANCE AND INDEMNFICATION 6.1 The following insurance coverage required by this Agreement shall be maintained by Consultant for the duration of its performance of the Services. Consultant shall not perform any Services unless and until the required insurance listed below is obtained by Consultant. Consultant shall provide City with certificates of insurance and endorsements I:\cmo\Agreements\Rincon Professional Services AgreemenLbm.08.19.2026.FY2728-29.doe evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City. A. Workers' Compensation and Employer's Liability insurance in the amount that meets statutory requirements with an insurance carrier acceptable to City, or certification to City that Consultant is self -insured or exempt from dhe workers' compensation laws of the State of California. Consultant shall execute and provide City with Exhibit "D," titled "Workers' Compensation Insurance Certification," which is attached hereto and incorporated herein by this reference, prior to performance of the Services. B. Comprehensive General Liability insurance with carriers acceptable to City in the minimum amount of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) aggregate, for public liability, property damage and personal injury is required. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City. C. Consultant shall secure and maintain professional liability insurance throughout the term of this Agreement in the amount of One Million Dollars ($1,000,000) per claim made. D. Business Auto Liability coverage, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit bodily injury liability and property damage liability. This coverage shall include all Consultant owned vehicles used in connection with Consultant's provision of the Services, hired and non -owned vehicles, and employee non -ownership vehicles. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City. E. Consultant is expressly prohibited from assigning or subcontracting any of the Services without the prior written consent of City. In the event of mutual agreement by the Parties to assign or subcontract a portion of the Services, Consultant shall add such assignee or subcontractor as an additional insured to the insurance policies required hereby and provide City with the insurance endorsements prior to any Services being performed by the assignee or subcontractor. 6.2 Consultant shall defend, indemnify and hold harmless City and its elected and appointed officials, employees and agents from and against any and all claims, losses or liability, including attorneys' fees, arising from injury or death to persons or damage to property occasioned by any negligent act or omission by, or the willful misconduct of, Consultant, or its officers, employees and agents in performing the Services. ARTICLE 7 — CONFLICTS OF INTEREST 3 1:\cmo\AgiccmenIs\Rinwn Professional Seivices Agieemcnlbm.08.19.2026.PY2728-29.doe 7.1 Consultant covenants and represents that it does not have any investment or interest in any real property that may be the subject of this Agreement or any other source of income, interest in real property or investment that would be affected in any mammr or degree by the performance of Consultant's Services. Consultant further covenants and represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement. 7.2 Consultant agrees it is not a designated employee within the meaning of the Political Reform Act because Consultant: A. Does not make a governmental decision whether to: (i) approve a rate, rule or regulation, or adopt or enforce a City law; (ii) issue, deny, suspend or revoke any City permit, license, application, certification, approval, order or similar authorization or entitlement; (iii) authorize City to enter into, modify or renew a contract; (iv) grant City approval to a contract that requires City approval and to which City is a party, or to the specifications for such a contract; (v) grant City approval to a plan, design, report, study or similar item; (vi) adopt, or grant City approval of, policies, standards or guidelines for City or for any subdivision thereof. B. Does not serve in a staff capacity with City and in that capacity, participate in making a governmental decision or otherwise perform the same or substantially the same duties for City that would otherwise be performed by an individual holding a position specified in City's Conflict of Interest Code under Government Code section 87302. 7.3 In the event City determines that Consultant must disclose its financial interests, Consultant shall complete and file a Fair Political Practices Commission Form 700, Statement'of Economic Interests, with the City Clerk's office pursuant to the written instructions provided by the City Clerk. ARTICLE 8 — GENERAL CONSIDERATIONS 8.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys' fees, including fees for the use of in-house counsel by a Party. 8.2 Consultant shall not assign any of the Services, except with the prior written approval of City and in strict compliance with the terms and conditions of this Agreement. Ally assignment or attempted assignment without such prior written consent may, in the sole discretion of City, result in City's immediate termination of this Agreement. 4 lAcmo\Agreements\Rincon Professional Services Agreement.bm.08.19.2026.FY2728-29.doe 8.3 Consultant is for all purposes under this Agreement an independent contractor and shall perform the Services as an independent contractor. Neither City nor any its agents shall have control over the conduct of Consultant or Consultant's employees, except as herein set forth. Consultant shall supply all necessary tools and instrumentalities required to perform the Services. Assigned personnel employed by Consultant are for its account only, and in no event shall Consultant or personnel retained by it be deemed to have been employed by City or engaged by City for the account of, or on behalf of City. Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent, nor shall Consultant have any authority, express or implied, to bind City to any obligation. 8.4 This Agreement may be terminated by City, in its sole discretion, by providing not less than five (5) days prior written notice to Consultant of City's intent to terminate. If this Agreement is terminated by City, an adjustment to Consultant's compensation shall be made, but (t) no amount shall be allowed for anticipated profit or unperformed Services, and (2) any payment due Consultant at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Consultant. 'Upon receipt of a termination notice, Consultant shall immediately discontinue its provision of the Services and, within five (5) days of the date of the termination notice, deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable) of project related data, design calculations, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by Consultant in performing the Services. Consultant shall be compensated on a pro-rata basis for Services completed up to the date of termination. 8.5 Consultant shall maintain books, ledgers, invoices, accounts and other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant pursuant to this Agreement. Such books shall be available at reasonable times for examination by City at the office of Consultant. 8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Except as otherwise provided for herein, ally amendment to this Agreement shall be in writing, approved by City and signed by City and Consultant. 8.7 This Agreement shall be governed by and construed in accordance with the laws of the State of California, without regard to its conflicts of laws provisions. The Parties agree that all actions or proceedings arising in connection with this Agreement shall be tried and litigated only in the state courts located in San Bernardino County, California, and the federal courts located in Riverside County, California. 8.8 if one or more of the sentences, clauses, paragraphs or sections contained in this Agreement is declared invalid, void or unenforceable by a court of competent 5 1:\cmo\Agreements\Rincon Professional Services Agreement.bm,08.19.2026.PY2728-29.dno jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair or invalidate the remaining sentences, clauses, paragraphs or sections contained herein, unless to do so would deprive a Party of a material benefit of its bargain under this Agreement. IN WITNESS WHEREOF, duly authorized representatives of City and Consultant have signed in confirmation of this Agreement. CITY OF REDLAND 4A' . B Mario Saucedo, Mayor ATTEST: ie 1 Donaldson, City Clerk RINCON CONSULTANTS, INC. 6 I:lcmo\AgreementslRincon Professional Services Agreement.bm.08.19.2026.FY2728-29.doe EXHIBIT "A" SCOPE OF SERVICES The scope of work for implementing the selected remedial actions is described below. Task 1 Pre -implementation Activities The purpose of Task 1 is to prepare the work plans, health and safety documents, permitting materials, and institutional control elements needed to support regulatory review and initiate field implementation of the selected remedial actions. Task 11 Implementation Work Plan Consultant will prepare an Implementation Work Plan describing the planned scope of work for each selected remedial action: cleaning and inspecting the Imhoff Tanks and AST, destroying the dry groundwater monitoring wells, installing two additional groundwater monitoring wells, and long-term monitoring of the groundwater at the site. The Implementation Work Plan will be subject to review and approval by the Regional Board. Attached to the Implementation Work Plan will be a HASP prepared for the remedial action implementation activities described in the FS/RAP. This plan will describe the steps necessary for the field crew to operate on site in a safe and healthy manner, including steps to minimize exposure of the crew to potential contaminants. The preparation of such a plan is required by Federal guidelines for site assessment work. The HASP will be prepared in accordance with California Occupational Safety and Health Administration requirements (CCR Title 8 Section 5192) and contains safety provisions for routine response activities and unexpected emergencies. The plan contains information on chemical and physical hazards, personal protective equipment, decontamination procedures, personnel responsibilities, and emergency response protocols. The HASP will be presented to all onsite personnel and signed prior to the commencement of work. Task 1.2 Long-term Groundwater Sampling and Analysis Plan Prior to initiation of the first semi-annual groundwater sampling event, Consultant will prepare a sampling and analysis plan (SAP) that will include analytical and sampling requirements for semi-annual groundwater monitoring as well as a detailed groundwater monitoring plan. The SAP will be submitted to the Regional Board for review and approval prior to the first semi- annual groundwater sampling event. The SAP may be updated as needed based on the groundwater data collected, any significant changes to the groundwater monitoring plan, or new or updated analytical methods. Task 1.3 Soil Management Plan Consultant will prepare a Soil Management Plan (SMP) to prescribe appropriate soil handling and management activities to be conducted during future earth moving activities at the site in the vicinity of the Septage Ponds, Imhoff Tanks, or AST. The purpose of the SMP is to provide construction and/or other workers with guidance for the proper handling and management of impacted soil, when or if encountered, during future earth moving activities. The SMP will be subject to review and approval by the Regional Board. 7 1Acmo\Agreements\12incon Professional Services AgrecmcnLbm.08.19.2026FV2728-29.doe Task 1.4 Land Use Covenant Support Consultant will support the City in the preparation and implementation of a Land Use Covenant (LUC) required by the RAP to ensure long-term protection of human health and the environment. The LUC will establish institutional controls for the Septage Ponds and Imhoff Tank areas where residual impacts will remain in place. Consultant's role will include assisting the City by providing technical content, site data, and recommended restrictions for incorporation into the LUC, as well as coordinating with the Regional Board and other stakeholders, including the adjacent property owner, as necessary. The City, with its legal counsel, will prepare, finalize, and record the LUC. The LUC is anticipated to include land -use restrictions limiting development to non -sensitive uses, requirements for implementing an SMP during any future earthwork (see Task 1.3), prohibitions on intrusive activities without prior regulatory approval, and notification and reporting obligations for future property owners. Once finalized, the LUC will be recorded on the property title and will remain in effect in perpetuity. Task 2 Tank Cleaning, Inspections, and Reporting The purpose of Task 2 is to clean and inspect the Imhoff Tanks and AST, to characterize residual materials, and document conditions for Regional Board review as outlined in the FS/RAP. Task 2.1 Pre -field Activities Pre -field preparation activities will be conducted prior to the tank cleanings and inspections. These activities will include coordination between Consultant, the licensed contractor conducting the cleaning, and the City and preparation for the field activities. Task2.2 hnhoff Tanks and ASTRemoval As an alternative to Tasks 2.2 and 2.3, an excavator and breaker may be used to remove the two concrete Imhoff Tanks. Under this scenario, the concrete would be sized using the breaker to transport to a recycler. The concrete is assumed to be non -hazardous and free of staining. Upon completion of the removal of the Imhoff tanks, the cavities would be backfilled with "clean" import backfill material to the surface and the area will be rough graded. The backfill would be placed in estimated 12-inch lift and compacted with a compaction wheel attached to the excavator. The AST would be loaded on a flatbed truck with the excavator and transported to a local recycling facility. Consultant assumes the AST does not contain any liquid. Consultant would collect waste characterization samples of the sediment removed from the Imhoff Tanks for disposal at an approved facility. Consultant assumes 4 samples of the sediment removed from the Imhoff Tanks would be collected. Samples will be analyzed for Title 22 Metals by Environmental Protection Agency (EPA) Method 6010, TPH by EPA method 8015B, and VOCs by EPA Method 8260B by a California certified laboratory via standard turnaround time. Task 2.3 Tank Cleaning and Inspection Memorandum Following completion of the cleaning and inspection (or removal) of the Imhoff Tanks and AST, a memorandum will be prepared that describes the activities conducted during the cleanings and inspections (or removal) of the tanks. At a minimum the memorandum will include details about the debris or material within the tanks, the cleaning (removal) methods used, the debris or material removed from the tanks, the results of the visual inspections of the cleaned tanks, the 8 IAcmo\Agremnenls\Rincon Professional Services Agreementbm.08.19.2026.PY2728-29.doc analytical results of the waste characterization samples, and waste manifests for the disposed material. This report will be subject to review and approval by the Regional Board. Task 3 Groundwater Monitoring Well Destruction The purpose of Task 3 is to properly destroy seven dry groundwater monitoring wells at the site in accordance with regulatory requirements as outlined in the FS/RAP. Task 3.1 Pre -field Activities Pre -field preparation activities will be conducted prior to groundwater monitoring well destruction. These activities will include coordination between Consultant, the licensed contractor conducting the destruction, and the City and preparation for the field activities as well as the subtasks below. Task 3.2 Well Locating During site visits in 2018, some of the historical groundwater monitoring wells were located by Consultant personnel; however, several wells were not located. Consultant will conduct a multi - tiered approach to attempt to locate the groundwater monitoring wells. Consultant will review state and local databases to determine approximate and relative locations of the groundwater monitoring wells. Additionally, Consultant will review historical aerials and site maps. Once the general vicinity of the wells is determined, Consultant will mobilize to the site with a licensed contractor to deploy ground penetrating radar (GPR) in an attempt to locate the wells. In addition, Consultant personnel will be equipped with a metal detector in an effort to locate steel flush mount covers for the wells. It is anticipated that locating activities will be completed in one day. Consultant assumes that the general vicinity of each of the wells will be cleared of vegetation by the City prior to conducting GPR activities. Task3.3 Penuitting Consultant will obtain the appropriate permit(s) from San Bernardino County Environmental Health Services (EHS) to destroy the seven dry groundwater monitoring wells. This task includes completing applications and associated paperwork, coordination with EHS, and applicable permit fees. Task3.4 USAMark-out The dry groundwater monitoring well locations will be pre -marked with white flags and white spray paint and notify Underground Service Alert (USA) utility marking service prior to performing well destruction activities. California law requires this notification no less than 48 hours prior to drilling, not including the date of notification. In addition, the City will provide any information they have regarding underground utilities in the project vicinity. Task 3.5 Monitoring Well Destruction Well destruction of the groundwater monitoring wells will be performed by a C-57 well driller that is registered with San Bernardino Comity. The wells will be pressure grouted with approved material from the bottom of the wellbore to ground surface. The groundwater monitoring well 9 1:\emo\AgreemenlsU2incon Professional services Agreement.bm.08.19.2026.FY2728-29.doc will be over drilled to a depth of approximately 20 feet below ground surface. The wellbore will be sealed from approximately 20 feet below ground surface to the ground surface with impervious material to prevent any surface water or contaminants from entering the well and potentially reaching groundwater. It is anticipated that destruction of groundwater monitoring wells will take up to three days. Task 3.6 Monitoring Well Destruction Memorandum Following completion of the destruction of the dry groundwater monitoring wells, a summary memorandum will be prepared describing the completion of the groundwater monitoring well destruction. At a minimum it will include the locations of each of the dry groundwater monitoring wells and the general procedures for groundwater monitoring well destruction. This memorandum will be subject to review and approval by the Regional Board. Task 4 Groundwater Monitoring Well Installation The purpose of Task 4 is to install and develop two new groundwater monitoring wells necessary to support long-term groundwater monitoring as outlined in the FS/RAP. Task 4.1 Pro -field Activities Pre -field preparation activities will be conducted prior to groundwater monitoring well destruction. These activities will include coordination between Consultant, the licensed contractor performing the installation, and the City and preparation for the field activities as well as the subtasks below. Task 4.2 Permitting Consultant will obtain the appropriate pennit(s) from San Berardino County MIS to install two groundwater monitoring wells. This task includes completing applications and associated paperwork, coordination with EHS, and applicable permit fees. Task4.3 USA Mart -out The two groundwater monitoring well locations will be pre -marked with white flags and white spray paint and we will notify USA utility marking service prior to performing well installation activities. California law requires this notification no less than 48 hours prior to drilling, not including the date of notification. In addition, the City will provide any information they have regarding underground utilities in the project vicinity. Consultant assumes that prior to mark -out activities, the City will conduct clearing and grading activities, as needed, so that drilling equipment may access the groundwater monitoring well locations. Task 4.4 Monitoring Well Drilling and Development The two groundwater monitoring wells will be installed using an 8-inch diameter hollow -stein auger to a target total depth of 250 feet bgs where a screen will be placed from approximately 220 to 250 feet bgs. It is anticipated that installation of each well will take up to 7.5 days to complete. A 4-inch diameter Schedule 80 PVC well will be installed in each borehole; the bottom 30 foot well screen will be slotted Schedule 80 PVC pipe, with 0.010-inch slots, and solid Schedule 80 10 1:\cmo\Agreements\Rincon Professional Services Agreement.bm.08.19.2026.FY2728-29.doc PVC pipe (riser) will be placed from the top of the well screen to land surface. The annulus between the groundwater monitoring well and the borehole will be backfilled with Monterey No. 2/12 sand from the total borehole depth, to 5 feet above the top of the well screen. A 3-foot thick (minimum) hydrated bentonite seal will be installed above the sand pack. Hydrated bentonite groat will be installed from the top of the bentonite sea] of the filter pack to 2 feet bgs. Concrete will be placed from 0 to 2 feet bgs. A traffic -rated vault as well as a riser and pad (given the terrain) will be installed around the groundwater monitoring well. A locking cap will be placed on top of the PVC riser at grade and a bottom PVC cap will either be screwed on or secured with stainless steel screws for each groundwater monitoring well. Well development activities will be initiated at least 48 hours after groundwater monitoring well installation. The monitoring wells will be developed by pumping, surging, and bailing until sediments in the bottom of the groundwater monitoring well are removed, the extracted water becomes clear, and all indicator parameters become stable (California Environmental Protection Agency 1995). The groundwater monitoring wells will be developed until water quality parameters (pH, temperature, conductivity, and turbidity) stabilize. Water quality field parameters will be collected and recorded throughout the development process. Task 4.5 Well Survey The two newly installed groundwater monitoring wells and the one groundwater monitoring well installed in 2022 will be surveyed by a State of California Licensed Land Surveyor. The elevation and the latitude and longitude of the top of well casing will be surveyed for each groundwater monitoring well. Task 4.6 Investigation Derived Waste Investigative derived waste (IDW) will be generated from purged groundwater into 55-gallon drums. Consultant will collect two IDW-water samples from groundwater purged from the two newly installed wells. The samples will be submitted to a laboratory and will be analyzed for VOCs by EPA Method 8260B, TPH by EPA Method 8015, and Title 22 Metals by EPA Method 6010/7417 for waste disposal purposes. Consultant will contract with a waste hauler to pick up and transport the drums to a waste facility. Task 4.7 Well Installation Memorandum Upon completion of the installation of the groundwater monitoring wells, Consultant will prepare a completion memorandum detailing, at a minimum, the well construction details and well development procedures. This memorandum will be subject to review and approval by the Regional Board. Tasks Remedial Action Implementation Reporting A Remedial Action Implementation Report will be prepared to describe the activities conducted as described in Tasks 1 through 4. The Report will reference the memoranda and Regional Board approval letters for each memorandum. 11 I:\cmo\AgreemcnlsUiincon Professional Services Agreement.bra 08.19.2026,PY2728-29.doc Task 6 Long-term Groundwater Monitoring The purpose of Task 6 is to conduct semi-annual groundwater sampling and reporting to evaluate potential contaminant migration and ensure long-term protectiveness of the approved remedial actions. Task 6.1 Year 1. Groundwater Monitoring Consultant assumes that Year 1 groundwater monitoring will be conducted in 2027 and consist of: • Completing pre -field preparation activities including coordination between Consultant, subcontractors, and the City. • Installing a dedicated pump equipped with high density tubing in each of the groundwater wells to be sampled and monitored long term (total of 3 pumps). • Performing one 3-year groundwater monitoring event with the analyte list shown in Table 1. One groundwater sample will be collected from each monitoring well (total of 3 samples). One duplicate sample will be collected and one equipment blank sample will be collected during each sampling event. • Performing one semi-annual groundwater monitoring event with the analyte list shown in Table 2. One groundwater sample will be collected from each monitoring well (total of 3 samples). One duplicate sample will be collected and one equipment blank sample will be collected during each sampling event. • During each groundwater monitoring event, field parameters including pH, specific conductance, dissolved oxygen, and temperature will be monitored prior to collecting groundwater samples. Groundwater samples will be stored in a cooler chilled to 4 degrees Celsius and will be couriered to a State -certified analytical laboratory using chain -of -custody protocol. Consultant assumes the City will contract directly with the analytical laboratory. Analytical laboratory costs are not included in this proposal. • Preparing and submitting an annual report for review and approval by the Regional 'Board. Groundwater monitoring activities and analytical results will be reported to the City and the Regional 'Board in a letter report. The letter report will include groundwater levels, calculated groundwater gradient, analytical results, and any other pertinent observations as well as a status update of ongoing remediation activities. • Disposing of purged groundwater after the second monitoring event of the year. IDW will be generated ftom purged groundwater into 55-gallon drums. Consultant will collect one IDW- water sample ftom the drums each year. The samples will be submitted to a laboratory and will be analyzed for VOCs by EPA Method 8260B, TPH by EPA Method 8015, and Title 22 Metals by EPA Method 6010/7417 for waste disposal purposes. Consultant will contract with a waste hauler to pick up and transport the drums to a waste facility after the second monitoring event of the year. Table 1. Analyte List for 3-year Groundwater Monitoring Events 12 I:\cmo\Agreements\Rineon Professional services Agreemenlbm.08.19.2026.PY2728-29.doe Lead PFOA/PFOS Semi-annual Semi-annual EPA Method 6010B EPA Method 1633 PFAS — Full List Every 3 Yeats EPA Method 1633 Total Cations Total Anions Every 3 Years Every 3 Years EPA Method 1 EPA Method 1 Hydroxide (OH) Every 3 Years EPA Method 2 Specific Conductance (Electrical Conductivity) Every 3 Years EPA Method 120.1 Total Hardness Every 3 Years EPA Method 130 pH Every 3 Years EPA Method 150.1 Total Dissolved Solids Every 3 Years EPA Method 160.1 Iron (Fe) Manganese (Mn) Every 3 Years Every 3 Years EPA Method 200.7 / 236.1. EPA Method 200.7 / 243.1 Zinc (Zn) Every 3 Years EPA Method 200.7 / 289.1 Boron (B) Carbonate CaCO3 Every 3 Years Every 3 Years EPA Method 212.3 / 200.7 EPA Method 310.2 Bicarbonate (HCO3) Every 3 Years EPA Method 310.2 Total Alkalinity Every 3 Years EPA Method 310.1 Chloride (Cl) Every 3 Years EPA Method 325 Fluoride (F) Every 3 Years EPA Method 340 Nitrate (NO3) Every 3 Years EPA Method 353.2 Phosphate (PO4) Every 3 Years EPA Method 365.2 Total Phosphorus Every 3 Years EPA Method 365.1/365.2 Sulfate (SO4) Every 3 Years EPA Method 375 Chemical Oxygen Demand Every 3 Years EPA Method 410 Total Organic Carbon Phenols Every 3 Years Every 3 Years EPA Method 415 CPA Method 420.1 Total Organic Halogens Every 3 Years EPA Method 450.1 Volatile Organic Compounds (VOCs) Every 3 Years EPA Method 8260B Total Petroleum Hydrocarbons (TPH) — Gas, 'Diesel, and Motor Oil Range Every 3 Yeas EPA Method 8015M Notes: 13 1:\cmo\Agrcc nentsTjncon Professional Services Agreement.bm.08.19.2026.FY2728-22doc Sampling and Analysis Plan (see Task 1.2) EPA - United States Environmental Protection Agency PEAS - per- and polyfluoroalkyl substances PFOA - perfluorooctanoic acid PFOS - perfluorooctanesulfonie acid Table 2. Analyte List for Semi-annual Groundwater Events Lead Semi-annual EPA Method 6010E PFOA/PFOS Semi-annual EPA Method 1633 Notes: Methods for groundwater analysis will be finalized in the Long-term Groundwater Sampling and Analysis Plan (see Task 1.2) EPA - United States Environmental Protection Agency PFOA - perfluorooctanoic acid PFOS - perfluorooctanesulfonic acid Task 6.2 Training for Groundwater Monitoring Consultant will conduct training with City staff to take over responsibility for groundwater monitoring beyond the first year of groundwater monitoring activities (i.e., training to occur during year 1 monitoring activities). Consultant will train during two sampling events, which will include coordination with the analytical laboratory, preparation of sampling equipment and bottleware, collection of samples, and submittal of samples to the analytical laboratory. Consultant assumes the City will contract directly with the analytical laboratory and manage IDW during these training events. Costs associated with IDW and analytical laboratory costs are not included in this proposal. Task 7 Contingency Due to the potential unknowns (e.g., well locations, well construction information) and challenges installing prior wells at the site and in the local region, Consultant has included a 10- percent contingency budget to account for potential budget overruns. Consultant will not expend this budget without prior written approval from the City. General Assumptions Costs for written documents (Tasks 1.1, 1.2, 1.3, 2.4, 3.5, 4.7, 5, and 6.1) include responding to one round of comments from the City, and one round of comments from the Regional Board. • Consultant is not responsible for any damages to underground improvements not clearly or accurately marked by the City. Consultant will contact DigAlert for utility mark -outs; 14 L emo\AgreementA incon Professional Sorvices Agreemenl.bm.08. 19.2026.FY2728-29.doe however, it should be noted that DigAlert often does not mark the location of subsurface utilities located on private property. If Consultant damages any subsurface utility or structure that is not identified by the City, then the City will assume the cost and all liability related to repair and injury that may occur as a result of such an occurrence. • The subsurface is amenable to well installation using the methods described in this proposal and the sampling can be completed in the specified time frame. Consultant will advise the City of any necessary revisions to the work scope as well as additional costs, if required. • Laboratory analytical costs included in this proposal assume a standard turnaround time. • An annual escalation of 3.5% was applied to costs projected in 2027, 2028, and 2029. 15 1:\cmo\Agremnents\Rincon Professional Services Agreemont.bm.08.19.2026.PY2728-29.doc EXHIBIT 'B" PROJECT SCHEDULE Pre -implementation Activities 6 months after approval of FS/RAP Second half of 2026 Long-term Groundwater Sampling and 6 months after approval of FS/RAP Second half of 2026 Analysis Plan Soil Management Plan 6 months after approval of FS/RAP Second half of 2026 Imhoff Tank Cleaning, Inspections, 6 months after approval of FS/RAP Second half of 2026 and Reporting Aboveground Storage Tank Cleaning, 6 months after approval of FS/RAP Second half of 2026 Inspections, and Reporting Groundwater Monitoring Well 6 months after approval of FS/RAP Second half of 2026 Destruction Groundwater Monitoring Well 1 year after approval of FS/RAP Second half 2027 Installation Annual Groundwater Monitoring and Once every year after the installation of First half of 2028, 2029, Reporting the groundwater monitoring wells and 2030 Remedial Action Implementation 6 months after completion of all First half of 2028 Report remedial action alternatives Land Use Covenant 1 year after groundwater monitoring Second half 2028 well installation * Schedule is subject to change due to permitting, site conditions, and coordination needs; therefore, an agreement term of 3 years is proposed. 16 1:\cmo\Agreemcntsl2incon Professional Services Agreement. m.09.19.2026.PY272R-29.doe EXHIBIT "C" FEESCHEDULE Task 1 Pre -implementation Activities $35,800 Taslc 1.1 Implementation Work Plan $10,000 Task 1.2 Long-term Groundwater Sampling and Analysis Plan $8,000 Task 1.3 Soil Management Plan $8,000 Task 1.4 Land Use Covenant Support $9,800 Task2 Tank Cleaning, Inspections, and Reporting $141,300 Task2.1 Pre -field Activities $2,400 Task 2.2 Imhoff Tanks and AST Removal $134,900 Task 2.3 Tank Cleaning and Inspection Memorandum $4,000 Task 3 Groundwater Monitoring Well Destruction $60,700 Task 3.1 Pre -field Activities Task 3.2 Well Locating $3,300 $7,300 Task 3.3 Permitting $9,000 Task 3.4 USA Mark -out Task 3.5 Monitoring Well Destruction Task 3.6 Monitoring Well Destruction Memorandum $3,700 $33,400 $4,000 Task 4 Groundwater Monitoring Well Installation $340,600 Task 4.1 Pre -field Activities $3,300 Task 4.2 Permitting $4,800 Task 4.3 USA Mark -out $3,700 Task 4.4 Monitoring Well Drilling and Installation $302,300 Tasl<4.5 Well Survey $7,300 Task 4.6Investigation Derived Waste Task 4.7 Monitoring Well Memorandum Task 5 Remedial Action Implementation Reporting $16,200 $4,000 $7,500 Task 6 Long-term Groundwater Monitoring (First 3 Years) $54,100 Task 6.1 Year 1 Groundwater Monitoring Task 6.2 Groundwater Monitoring Training 6 Total $42,700 $11,400 $640,000 17 1:\cmo\Agreements\Rinwn Professional Services Agreement.bm.08.19.2026.PY2728-29.doc EXHIBIT "D" WORKERS' COMPENSATION INSURANCE CERTIFICATION Every employer, except the State, shall secure the payment of compensation in one or more of the following ways: (a) By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations, a certificate of consent to self -insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self -insure and to pay any compensation that may become due to his or her employees. CHECK ONE XI am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers' Compensation or to undertake self- insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861). I affirm that at all times, in performing the work and activities required or permitted wider this Agreement, I shall not employ any person in any manner such that I become subject to the workers' compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers' compensation laws of California, immediately 1 shall provide the City with a certificate of consent to self -insure, or a certification of workers' compensation insurance. I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct. VENDOR By: W!t yan (hatcher, rincipal Date: 0;ZO - -( 18 IAcmo\Agreements* incon Professional Services Agreementbm.08, 19.2026.PY2728-29.doo