HomeMy WebLinkAboutContracts & Agreements_189-2026k
AGREEMENT TO PERFORM PROFESSIONAL SERVICES
This agreement for the provision of Conceptual Engineering Design Services of the
Citrus Avenue and Redlands High School Crossing Project ("Agreement") is made and entered
in this 6t1' day of October, 2026 ("Effective Date"), by and between the City of Redlands, a
municipal corporation ("City") and Biggs Cardosa Associates, Inc. a California corporation
("Consultant"). City and Consultant are sometimes individually referred to herein as a "Party"
and, together, as the "Parties." In consideration of the mutual promises contained herein, City
and Consultant agree as follows:
ARTICLE 1 — ENGAGEMENT OF CONSULTANT
1.1 City hereby engages Consultant to provide Conceptual Engineering Design of the Citrus
Avenue and Redlands High School Crossing Project services for City (the "Services").
1.2 The Services shall be performed by Consultant in a professional manner, and Consultant
represents that it has the skill and the professional expertise necessary to provide the
Services to City at a level of competency presently maintained by other practicing
professional consultants in the industry providing like and similar types of Services.
ARTICLE 2 — SERVICES OF CONSULTANT
2.1 The Services that Consultant shall perform are more particularly described in Exhibit
"A," titled "Scope of Services," which is attached hereto and incorporated herein by this
reference.
2.2 Consultant shall comply with applicable federal, state and local laws and regulations in
the performance of this Agreement including, but not limited to, any applicable State
prevailing wage laws.
ARTICLE 3 — RESPONSIBILITIES OF CITY
3.1 City designates Monica Heredia, Municipal Utilities and Engineering Department
Director, as City's representative with respect to performance of the Services, and such
person shall have the authority to transmit instructions, receive information, interpret and
define City's policies and decisions with respect to performance of the Services.
ARTICLE 4 — PERFORMANCE OF SERVICES
4.1 Consultant shall perform and complete the Services in a prompt and diligent manner in
accordance with the schedule set forth in Exhibit `B," titled "Project Schedule," which is
attached hereto and incorporated herein by reference.
4.2 Consultant shall complete the Services by June 30, 2027, unless the Services are
terminated earlier as provided for herein.
1
I:\emo\Agreements\Biggs Cardosa Professional services Agreement.bm.09.19,2026.FY2627-49.doe
4.3 If Consultant's Services include deliverable electronic visual presentation materials, such
materials shall be delivered in a form, and made available to City, consistent with City
Council -adopted policy for the same. It shall be the obligation of Consultant to obtain a
copy of such policy from City staff.
ARTICLE 5 — PAYMENTS TO CONSULTANT
5.1 Compensation: Total compensation for Consultant's performance of the Services shall
not exceed the amount of Two Hundred Sixteen Thousand Four Hundred Eighty-two
dollars ($216,482). City shall pay Consultant on a time and materials basis up to the not -
to -exceed amount in accordance with Exhibit "C," titled "Fee Proposal," which is
attached hereto and incorporated herein by reference.
5.2 Consultant shall submit monthly invoices to City describing the Services performed
during the preceding month. Consultant's invoices shall include a brief description of the
Services performed, the dates the Services were performed, the number of hours spent
and by whom, and a description of reimbursable expenses related to the Services. City
shall pay Consultant no later than thirty (30) days after receipt and approval by City of
Consultant's invoice.
5.3 Any notice or other communication required, or which may be given, pursuant to this
Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date
of delivery in person; (ii) five (5) days after deposit in first class registered mail, with
return receipt requested; (iii) on the actual delivery date if deposited with an overnight
courier; or (iv) on the date sent by facsimile or electronic mail transmission (including
PDF), if confirmed with a copy sent contemporaneously by first class, certified,
registered or express mail; in each case properly posted and fully prepaid to the
appropriate address set forth below, or such other address as a Party may provide notice
in accordance with this section:
CITY:
CONSULTANT:
City Clerk
Eric Pheifer, Principal/Vice President
City of Redlands
Biggs Cardosa Associates, Inc.
35 Cajon Street
500 S. Main Street, Suite 1200
P.O. Box 3005 (mailing)
Orange, CA 92868
Redlands, CA 92373
epheifer@biggseardosa.com
jdonaldson@cityofredlands.org
Phone: (714) 352-8312
Phone: (909) 798-7531
Fax: (408) 296-8114
ARTICLE 6 — INSURANCE AND INDEMNIFICATION
6.1 The following insurance coverage required by this Agreement shall be maintained by
Consultant for the duration of its performance of the Services. Consultant shall not
perform any Services unless and until the required insurance listed below is obtained by
Consultant. Consultant shall provide City with certificates of insurance and endorsements
2
L\cmo\Agreements\Biggs Cardosa Professional Services Agreement.bm.09.18.2026.FY2627-49.doc
evidencing such insurance prior to commencement of the Services. Insurance policies
shall include a provision prohibiting cancellation or modification of the policy except
upon thirty (30) days prior written notice to City.
A. Workers' Compensation and Employer's Liability insurance in the amount that meets
statutory requirements with an insurance carrier acceptable to City, or certification to
City that Consultant is self -insured or exempt from the workers' compensation laws
of the State of California. Consultant shall execute and provide City with Exhibit
"D," titled "Workers' Compensation Insurance Certification," which is attached
hereto and incorporated herein by this reference, prior to performance of the Services.
B. Comprehensive General Liability insurance with carriers acceptable to City in the
minimum amounVof One Million Dollars ($1,000,000) per occurrence and Two
Million Dollars ($2,000,000) aggregate, for public liability, property damage and
personal injury is required. City shall be named as an additional insured and such
insurance shall be primary and non-contributing to any insurance or self-insurance
maintained by City.
C. Consultant shall secure and maintain professional liability insurance throughout the
term of this Agreement in the amount of One Million Dollars ($1,000,000) per claim
made.
D. Business Auto Liability coverage, with minimum limits of One Million Dollars
($1,000,000) per occurrence, combined single limit bodily injury liability and
property damage liability. This coverage shall include all Consultant owned vehicles
used in connection with Consultant's provision of the Services, hired and non -owned
vehicles, and employee non -ownership vehicles. City shall be named as an additional
insured and such insurance shall be primary and non-contributing to any insurance or
self-insurance maintained by City.
E. Consultant is expressly prohibited from assigning or subcontracting any of the
Services without the prior written consent of City. In the event of mutual agreement
by the Parties to assign or subcontract a portion of the Services, Consultant shall add
such assignee or subcontractor as an additional insured to the insurance policies
required hereby and provide City with the insurance endorsements prior to any
Services being performed by the assignee or subcontractor.
6.2 Consultant shall defend, indemnify and hold harmless City and its elected and appointed
officials, employees and agents from and against any and all claims, losses or liability,
including attorneys' fees, arising from injury or death to persons or damage to property
occasioned by any negligent act or omission by, or the willful misconduct of, Consultant,
or its officers, employees and agents in performing the Services.
3
1:\emo\Agreements\Biggs Cardosa Professional Services Agreement.bm.09.18.2026.FY2627-49.doe
ARTICLE 7 — CONFLICTS OF INTEREST
7.1 Consultant covenants and represents that it does not have any investment or interest in
any real property that may be the subject of this Agreement or any other source of
income, interest in real property or investment that would be affected in any manner or
degree by the perforniance. of Consultant's Services. Consultant further covenants and
represents that in the performance of its duties hereunder, no person having any such
interest shall perform any Services under this Agreement.
7.2 Consultant agrees it is not a designated employee within the meaning of the Political
Reform Act because Consultant:
A. Does not make a governmental decision whether to:
(i) approve a rate, rule or regulation, or adopt or enforce a City law;
(ii) issue, deny, suspend or revoke any City permit, license, application,
certification, approval, order or similar authorization or entitlement;
(iii) authorize City to enter into, modify or renew a contract;
(iv) grant City approval to a contract that requires City approval and to which
City is a party, or to the specifications for such a contract;
(v) grant City approval to a plan, design, report, study or similar item;
(vi) adopt, or grant City approval of, policies, standards or guidelines for City
or for any subdivision thereof.
B. Does not serve in a staff capacity with City and in that capacity, participate in
making a governmental decision or otherwise perform the same or substantially
the same duties for City that would otherwise be performed by an individual
holding a position specified in City's Conflict of Interest Code under Government
Code section 87302.
7.3 In the event City determines that Consultant must disclose its financial interests,
Consultant shall complete and file a Fair Political Practices Commission Form 700,
Statement of Economic Interests, with the City Clerk's office pursuant to the written
instructions provided by the City Clerk.
ARTICLE 8 — GENERAL CONSIDERATIONS
8.1 In the event any action is commenced to enforce or interpret any of the terms or
conditions of this Agreement the prevailing Party shall, in addition to any costs and other
relief, be entitled to the recovery of its reasonable attorneys' fees, including fees for the
use of in-house counsel by a Party.
8.2 Consultant shall not assign any of the Services, excepf with the prior written approval of
City and in strict compliance with the terms and conditions of this Agreement. Any
assignment or attempted assignment without such prior written consent may, in the sole
discretion of City, result in City's immediate termination of,this Agreement.
4
1:\emo\Agreements\Biggs Cardosa Professional Services Agreement.bnr.09.19.2026.FY2627-49.doc
8.3 Consultant is for all purposes under this Agreement an independent contractor and shall
perform the Services as an independent contractor. Neither City nor any its agents shall
have control over the conduct of Consultant or Consultant's employees, except as herein
set forth. Consultant shall supply all necessary tools and instrumentalities required to
perform the Services. Assigned personnel employed by Consultant are for its account
only, and in no event shall Consultant or personnel retained by it be deemed to have been
employed by City or engaged by City for the account of, or on behalf of City. Consultant
shall have no authority, express or implied, to act on behalf of City in any capacity
whatsoever as an agent, nor shall Consultant have any authority, express or implied, to
bind City to any obligation.
8.4 This Agreement may be terminated by City, in its sole discretion, by providing not less
than five (5) days prior written notice to Consultant of City's intent to terminate. If this
Agreement is terminated by City, an adjustment to Consultant's compensation shall be
made, but (1) no amount shall be allowed for anticipated profit or unperformed Services,
and (2) any payment due Consultant at the time of termination may be adjusted to the
extent of any additional costs to City occasioned by'any default by Consultant. Upon
receipt of a termination notice, Consultant shall immediately discontinue its provision of
the Services and, within five (5) days of the date of the termination notice, deliver or
otherwise make available to City, copies (in both hard copy and electronic form, where
applicable) of project related data, design calculations, drawings, specifications, reports,
estimates, summaries and such other information and materials as may have been
accumulated by Consultant in performing the Services. Consultant shall be compensated
on a pro-rata basis for Services completed up to the date of termination.
8.5 Consultant shall maintain books, ledgers, invoices, accounts and other records and
documents evidencing costs and expenses related to the Services for a period of three (3)
years, or for any longer period required by law, 'from the date of final payment to
Consultant pursuant to this Agreement. Such books shall be available at reasonable times
for examination by City at the office of Consultant.
8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the
entire agreement and understanding between the Parties as to the matters contained
herein, and any prior negotiations, written proposals or verbal agreements relating to such
matters are superseded by this Agreement. Except as otherwise provided for herein, any
amendment to this Agreement shall be in writing, approved by City and signed by City
and Consultant.
8.7 This Agreement shall be governed by and construed in accordance with the laws of the
State of California, without regard to its conflicts of laws provisions. The Parties agree
that all actions or proceedings arising in connection with this Agreement shall be tried
and litigated only in the state courts located in San Bernardino County, California, and
the federal courts located in Riverside County, California.
5
I:\etno\Agreements\aiggs Cardosa Professional Services Agreement.bm.09.18.2026.FY2627-49.doc
8.8 If one or more of the sentences, clauses, paragraphs or sections contained in this
Agreement is declared invalid, void or unenforceable by a court of competent
jurisdiction, the same shall be deemed severable from the remainder of this Agreement
and shall not affect, impair or invalidate the remaining sentences, clauses, paragraphs or
sections contained herein, unless to do so would deprive a Party of a material benefit of
its bargain under this Agreement.
IN WITNESS WHEREOF, duly authorized representatives of City and Consultant have
signed in confirmation of this Agreement.
CITY OF REDLANDS
Mario Saucedo, Mayor
ATTEST:
J e Donaldson, City Clerk
BIGGS CARDOSA ASSOCIATES, INC.
an
Eric Pheifer, PrincipalNice President
6
LlcmolAgreementslBiggs Cardosa Professional services Agreement.bm.09.19.2026.FY2627-49.doc
EXHIBIT "A"
SCOPE OF SERVICES
SCOPE OF SERVICES
The City intends to complete a detailed conceptual design and cost estimate for the Citrus
Avenue and Redlands High School Crossing Project ("Project"). The Project will evaluate,
develop, and design a pedestrian crossing improvement along Citrus Avenue between the north
and south campuses of Redlands High School.
Throughout the school day, hundreds of students, faculty, and staff cross Citrus Avenue between
class periods. Although the crossing is currently controlled by pedestrian -activated traffic control
measures, conflicts between pedestrians and vehicular traffic continue to occur. The existing at -
grade crossing presents safety concerns due to high pedestrian volumes, driver inattentiveness,
traffic delays, and operational impacts to emergency response vehicles. The City desires to
evaluate grade -separated crossing alternatives that improve pedestrian safety, maintain traffic
operations, and provide a long-term transportation solution.
The primary objectives of the project are to:
■ Improve pedestrian safety for students, faculty, and staff crossing Citrus Avenue.
• Reduce vehicle -pedestrian conflicts along the corridor.
• Minimize traffic congestion and operational delays caused by frequent pedestrian
crossings.
■ Improve emergency vehicle access and response times.
■ Enhance bicycle and pedestrian connectivity between the two campuses.
■ Develop a constructible and financially feasible grade -separated crossing solution.
EXISTING CONDITIONS AND OBSERVATIONS
The following existing conditions and observations have been made in preparation of this Scope
of Services:
■ Citrus Avenue is classified as a minor arterial in the city's roadway classification of the
General Plan. Roadway right of way varies from 72' to 89' depending upon the typical
section proposed. Assessor Parcel Maps show the current half -street right of way on the
south side of the street is consistent at 39-feet from Church Street to University Street.
The north side of Citrus Avenue is primarily a 44-foot half street right of way except
fronting the residential homes west of Central Avenue.
• Citrus Avenue has an existing Class II bike lane — green painted extending from Church
Street to University Street and extending easterly to Grove Street. To the west of Church
Steet, the Class II bike lane joins a Class III bike lane.
■ Citrus Avenue is also designated as a Truck Route from Wabash Avenue to the east of
the school site to Orange Street, located west of the school site.
• Site observations show several underground utilities located within the project site area.
Communication manholes were observed on the north side of Citrus Avenue at several
location fronting the school. Sewer manholes were observed approximately at the center
of Citrus Avenue in addition to water valves for fire hydrants and services to the school
7
I \cm&1Agreements\Biggs Cardosa Proressional Services Agreement.bm.09.18.2026.FY2627-49.doc
observed near the center of the street. Edison had several vaults along the north side of
Citrus Avenue within the school limits. Catch basins were at the intersection of
University Street, at the intersection of Central Avenue, fronting the residential properties
and at the intersection with Church Street large curb -opening basins were located on both
sides of Citrus Avenue.
TASK 1 — PROJECT MANAGEMENT & ADMINISTRATION
This task includes Consultant's "day-to-day" management of the Project, and meetings with the
City and external agencies.
1.1 Monthly Invoicing & Progress Reporting
The Consultant will submit invoices on a monthly basis in a format acceptable to the City that
include hourly breakdowns per staff classification per task. A monthly progress report will also
be included describing the progress per task.
Assumptions This scope assumes that the Period of Performance will be up to six (6)
months.
Invoicing will be per task (e.g. Task 1 — Project Management &
Administration). Further breakdown of subtasks (e.g. Task 1.1 Monthly
Invoicing & Progress Reporting) is not anticipated.
Deliverables I Monthly Invoices & Progress Reports
1.2 Coordination & Meetings
The Consultant shall conduct regular meetings and coordination with the City's staff in monthly
Project Development Team (PDT) meetings or technical and focused meetings as necessary. The
Consultant shall be responsible for preparation of agendas and meeting minutes. PDT meetings
will discuss project progress, issues, and action items. Technical meetings will be focused on
specific technical issues (e.g. resolution of technical comments on the conceptual design).
With respect to external agencies, the Consultant shall specifically coordinate with:
■ Redlands Unified School District.
■ Redlands High School administration.
■ Students and parents, as appropriate.
■ Adjacent businesses and property owners.
Meetings with entities not noted above are expected to occur during the final design phase (e.g.
meeting with affected third -party utilities).
Assumptions The City will identify the necessary PDT members outside of the
Consultant's team. Up to six (6) PDT meetings are included in this scope
and are assumed to be conducted virtually.
Up to two (2) technical workshops are anticipated to discuss the conceptual
8
1:lcmolAgreements\Biggs Cardosa Professional Services Agreement.bn7.09.18.2026.FY2627-49.doe
design and resolve comments. Those meetings are assumed to be conducted
virtually.
Up to two (2) meetings with Redlands Unified School District and
Redlands High School administration are included in this scope and are
anticipated to occur on -site.
One (1) City Council meeting is anticipated to present the Feasibility Study
Report. Students, parents, adjacent business and property owners, and the
general public will be able to participate in this meeting.
Extensive public outreach services to inform students, parents, adjacent
businesses, property owners, etc. are not anticipated as part of this scope.
The final design phase may require a public outreach consultant to host
public workshops and prepare a project website, fact sheet, etc., but those
services are not deemed essential for this phase of the Project.
Deliverables I PDT Meeting Agenda Packages
PDT Meeting Minutes
Technical Workshop Comment Resolution Logs
City Council PPT Presentation
1.3 Project Schedule
The Consultant shall prepare and update the Project schedule on a monthly basis, or as needed.
The Project schedule will include the Work Breakdown Structure in this Scope of Services, and
significant tasks and milestones necessary to complete the Project. The critical path will be
clearly depicted. Monthly schedule updates will show actual versus planned progress.
Assumptions I The project schedule will be developed in Microsoft Project.
Monthly progress schedules will be delivered in PDF format and will be
attached to invoice packages and included as part of PDT meeting agenda
packages.
Deliverables I Baseline Project Schedule
Monthly Progress Schedules
TASK 2 — DATA COLLECTION
This task primarily relates to collecting available record data, performing aerial survey, and
preparing base mapping for use in conceptual design.
2.1 Record Data Collection & Review
The Consultant shall request, collect, assemble, and review all pertinent project information
including roadway, utility, and traffic as-builts. City and Caltrans standards relevant to this
9
I:lcmolAgrcements\Biggs Cardosa Professional Services Agreement.bm.09.18.2026.FY2627-49.doc
Project will be collected and reviewed. Available traffic data will be collected. All data collected
by the Consultant will be assembled and made available to the City on a SharePoint site.
Assumptions I
This scope assumes that the City will pay fees that may be required by
external agencies to compile and transmit record data.
The City will provide available vehicular traffic data on Citrus Avenue, and
Redlands High School administration will provide data on number of
students and pedestrian crossings of Citrus Avenue. Traffic counts and
pedestrian counts are not anticipated as part of this scope, but would likely
be required during final design. The purpose of the traffic data collection
for this phase is to provide some text in the Feasibility Study related to
Average Daily Traffic and number of pedestrian crossings, and no traffic
reports are anticipated.
Deliverables I Project Data Collection File
2.2 Aerial Survey Base Mapping
The Consultant's field crews will establish ground control and perform an aerial survey of the
site identified in the exhibit provided in the RFP. The survey will be conducted using a survey -
grade, RTK-equipped unmanned aerial system (UAS). The final deliverables will consist of
processed orthorectified aerial imagery georeferenced to California Coordinate System, Zone 5.
Assumptions The limits of aerial survey will be along Citrus Avenue between Church
Street and E Central Avenue with a swath of roughly 500 feet.
Deliverables I Georeferenced Orthomosaic Image
High -Resolution Aerial Imagery
Digital files suitable for incorporation into project exhibits, mapping, or
coordination documents
2.3 Right of Way Base Mapping
The Consultant will perform research with the County of San Bernardino to acquire record maps
and GIS data to prepare a Right of Way Base Map in DWG format. The base map will show
parcel lines and APNs. The base mapping will be used to develop preliminary right of way
requirements for the concept alternatives.
Assumptions Ordering Title Reports and plotting easements that do not appear on record
maps is not anticipated as part of this scope.
The Right of Way Base Map will be developed based on record data. Field
survey will be conducted during the final design phase to locate
monuments, resolve boundaries, and update the Right of Way Base Map.
Deliverables I Right of Way Base Map
t0
Llcino\AgreementsUggs Cardosa Professional services Agreemcnt.bm,09. I S.2026.FY2627-49.doc
2.4 Utility Research and Base Mapping
The Consultant will utilize the Dig Alert website to determine the utility companies with
facilities in the location of the proposed work. Consultant will work with the City to prepare
Utility "A" Letters to be sent to these utility companies. Letters are anticipated to be prepared on
City letterhead and can be sent via email either by the City or by the Consultant. An exhibit
showing the approximate project limits will be attached to the letters. Record information
received in response to the letters will be used to develop a utility base map in DWG fon-nat. The
utility base map will be shown in the concept plans to identify potential strategies to relocate or
protect -in -place during the subsequent final design phase.
Assumptions If available, the City will provide their list of utility companies and contact
information.
Should any utility companies require a fee to process the as -built request
and supply maps, this scope assumes that the City would pay those fees.
This scope does not include potholing. It is assumed that potholing will be
required for the subsequent final design phase.
Deliverables Utility "A" Letters
Utility Base Map
Correspondence with Utility Companies
TASK 3 — CONCEPTUAL DESIGN
The Consultant shall develop and evaluate three conceptual alternatives, including:
■ Undercrossing Alternative No. 1
• Undercrossing Alternative No. 2
■ Pedestrian 1 Bicycle Overcrossing Alternative
Each alternative shall include:
■ Review of available studies, plans, utility information, and traffic data.
■ information from site investigations and field reviews.
■ Evaluation of existing roadways, pedestrians, bicycles, drainage, utility, and traffic
conditions.
■ Identification of constraints and opportunities affecting project development.
■ Conceptual roadway improvements.
■ Pedestrian facilities.
■ Bicycle accommodations.
■ Drainage and stormwater improvements (if needed).
■ Lighting and security features.
■ Accessibility and ADA compliance.
■ Utility impacts and relocations.
11
L\cmolAgreementslHiggs Cardosa Professional Services Agreement. bm.09.18.2026.FY2627-49.doc
• Preliminary right of way and easement requirements.
• Preliminary construction staging considerations.
• Preliminary construction cost estimates.
The conceptual design items noted above shall be of sufficient granularity to confirm feasibility
and to formulate implementation recommendations for the final design phase. Concept plans and
cost estimates are described in further detail below. Write-ups for the other items (above) will be
included in the Feasibility Study Report.
3.1 Concept Plans
The Consultant will develop concept -level plans for each alternative. Conceptual plans shall be
developed to a level sufficient to evaluate feasibility, benefits, impacts, and estimated costs. For
each alternative, the plans are anticipated to include:
• Undercrossing / Overcrossing General Plan
• Undercrossing / Overcrossing Foundation Plan
• Site Plans / Street Improvement Plans
• Stage Construction / Traffic Handling Plans
• Right of Way Requirements
Plans will reference appropriate City, Caltrans, and SPPWC, where applicable. They will be
developed in DWG format using a City -provided titleblock and delivered in PDF format. The
Concept Plans will be attached to the Feasibility Study Report.
Site Plans / Street Improvement Plans: Consultant's Site Plans will show how the proposed
alternatives join the on -site improvements. ADA paths of travel will be labeled with min/max
slopes allowed and path widths. Street Improvements Plans will provide the existing street
improvements along with signing and striping. The City's Traffic Engineer will provide input for
each alternative as related to pedestrian crossings and striping for the Class Il bike lane.
Stage Construction / Traffic Handling Plans: The Stage Construction / Traffic Handling Plan
will provide how the general traffic will proceed through the construction zone in addition to
how school personnel, student drop offs, student parking and pedestrian crossing will continue
daily with as minimal disruption as possible. The City's Traffic Engineer will make
recommendations to maintain safety of all pedestrians utilizing the crossings in Citrus Avenue.
Assumptions
This scope assumes that the preferred structure type for the
undercrossing alternatives will be a cast -in -place or precast concrete
box, and a prefabricated pedestrian truss bridge for the overcrossing
alternative. Decisions about preferred structure types are assumed to be
determined via sample photos and discussions, and preparation of
additional General Plans showing multiple structure types for each
alternative are not anticipated.
Draft concept plans will undergo one round of City review, and the final
concept plans will be developed. Additional rounds of reviews or
additional third -party reviewers are not anticipated.
12
1Acmo\Agreements\Biggs Cardosa Professional Services Agreement.bm.09.18.2026.FY2627-49.doc
The following assumptions were made with respect to total number of
sheets:
■ Undercrossing I Overcrossing General Plans: 3
■ Undercrossing / Overcrossing Foundation Plans: 3
■ Site Plans / Street Improvement Plans: 6
■ Stage Construction 1 Traffic Handling Plans: 6
■ Right of Way Requirements: 3
Confirmation of ownership and maintenance responsibility of the storm
drain facilities will be confirmed. If the facilities are under SBCFCD,
coordination will take place to determine their permitting requirements
for the assessed alternative concepts. These will be noted in the
Feasibility Study Report, and further coordination and permit
applications will be undertaken during the final design phase.
Deliverables I Concept Plans
3.2 Preliminary Cost Estimates
Preliminary construction cost estimates will be developed for the three alternatives. Cost
estimates will show estimated quantities and unit prices. Cost estimates will be prepared in Excel
format and delivered in PDF format. Cost estimates will be attached to the Feasibility Study
Report.
Assumptions
Line items and quantities will be based on rough order of magnitude
estimates. Detailed quantity calculations are not anticipated for this phase
of the project.
Unit prices will be based on recent bids, Consultant's experience with
similar projects, and Caltrans Contract Cost Data. Unit prices will include
materials and labor. The use of RSMeans or other estimating methods and
detailed breakdowns of labor and material costs are not anticipated.
Draft preliminary construction cost estimates will undergo one round of
City review, and the final preliminary construction cost estimates will be
developed.
It is assumed that the City is responsible for securing funding for both the
feasibility and final design phases. Should the City desire Consultant's
assistance in pursuing funding sources, Consultant will work with the City
to develop a scope and fee for the extra work.
It is assumed that all cost estimates will be agnostic to potential funding
sources. Should the City require cost estimates to be subdivided based on
specific requirements of funding agencies, Consultant will work with the
City to assess the extra effort and, if necessary, develop a scope and fee for
the extra work.
Deliverables I Preliminary Construction Cost Estimates
13
I: unolAgreementslSiggs Cardosa Professional services Agreement.bm.09.18.2026.FY2627-49.doc
3.3 Renderings
Consultant will prepare renderings (i.e. photosimulations) for the conceptual alternatives. The
proposed undercrossing or overcrossing will be modeled and superimposed on a picture of the
existing conditions. These renderings will be included in the Feasibility Study Report, and can be
presented to the project's stakeholders.
Assumptions This scope assumes up to three (3) rendered still views, assumed to be one
for each alternative. Consultant can provide additional views if needed, and
can coordinate with the City on the additional scope/fee for that effort.
City will select the preferred photos (ground or aerial) for use in the
photosimulations.
This scope does not assume renderings for multiple structure types or finish
options. It is assumed that those elements will be determined through
coordination meetings and samples, and the preferred structure types and
aesthetics will be used in the renderings.
Deliverables I Renderings
TASK 4 — FEASIBILITY STUDY REPORT
The technical memorandum (Feasibility Study Report) will summarize:
■ Alternative evaluations.
■ Benefits and constraints.
■ Environmental considerations.
■ Right-of-way requirements.
■ Construction costs.
■ Recommended preferred alternative.
The Consultant shall provide recommendations regarding the appropriate environmental
clearance pathway and anticipated pennitting requirements.
Following completion of conceptual design and stakeholder review, the City will select one
preferred alternative for advancement into final design.
Assumptions
The effort contained in this task is primarily to develop the Feasibility
Study Report and prepare text to address existing conditions, alternative
advantages/disadvantages, ADA compliance, etc. The effort to develop
concept plans and preliminary construction cost estimates is contained
under Task 3.
Feasibility Sludy Report appendices will include concept plans and
preliminary construction cost estimates developed in Task 3 along with any
relevant data collected as part of Task 2.
The Draft Feasibility Study Report will undergo one round of City review,
and the Final Feasibility Study Report will be developed. it is assumed that
the Final Feasibility Study Report will be presented to City Council.
Deliverables I Feasibility Study Report
14
1:lcmo\Agreements\Biggs Cardosa Professional Services Agreement.bm.09.19.2026.FY2627-49.doc
EXHIBIT "B"
PROJECT SCHEDULE
ask Name
l Duration
Startl
Fir
'edlands High School Crossing
188 days
Mon 10/12/261
Wed 6/31
ICey Milestones
91 days
Mon 10/12/26
Tue 2/11
Notice to Proceed
_...
0 days
Mon 10/12/26
Mon 10/1.
Conceptual Design Phase Completed
0 days i
Tue 2/16/27
Tue 2/1
Task 1- Project Management & Administration
-
85 days
---- F
Mon 20/12/261.
-
Fri 2/!
-
- - ..__...
Monthly Invoicing & Progress Reporting
85 days'
Mon 10/12/26
Fri 2/.
Coordination &Meetings
85 days
Mon 10/12/261
Fri 2/
Project Schedule Updates
85 days'
Mon 10/12/261
Fri 2/
Task 2 Data Collection
A 30 da s1
y
Mon 10/12/26l
Fri 11/21
_.. ._. _._
Record Data Collection & Review
15 daysi
Mon 10/12/261
Fri 10/
Aerial Survey Base Mapping
25 days
Mon 10/19/261
-
Fri 11/2
Right of Way Base Mapping
15 days
Mon 10/19/26t
Fri 11/
Utility Research &Base Mapping
-_
25 days
Mon 10/19/261
_...
Fri 11/2
Task 3 -Conceptual Design
40 days'
Mon 11/2/26!
Fri 12/2
Concept Plans
i 30 days'
Mon 11/2/26'
Fri 12/1
Preliminary Cost Estimates
10 days
Mon 12/14/261
Fri 12/2
Renderings
- -
20 days;
Mon 11/16/261
Fri 12/1
Task 4 - Feasibility Study Report
-
163 days'
-
Mon 11/16/26'
Wed 6/3
Draft Feasibility Study Report Preparation
30 days'
Mon 11/16/261
Fri 12/2
2/2
QA/QC Reviews
15 days{
-
Mon 12/28/261
Fri 1/1
Feasibility Study Report Submitted to City
0 days)
Fri 1/15/271
Fri 1/1
City Review of Feasibility Study Report
1- 10 days
Mon 1/18/271
Fri 1/2
Final Feasibility Study Report Preparation
r 10 days
Mon 2/1/271J
Fri 2/1
City Review /Meeting /Approval
98 days
Mon 2/15/27l
Wed 6/3
15
L\cmo\AgrecmentsTiggs Cardosa Professional Services Agreement.bm.09.18.2026.FY2627-49.doe
EXHIBIT "C"
FEE PROPOSAL
§�� l ����� {, . -. Y '. °�,3 w,J}:h"�
Fulty Burdened LoborRates:
"ii��'� �,�yyj�,iyyp�'�e-F•W°`3'x �G��'" T`�� y i33 ��, r a
3n__ §�
Task 1 - Project Management & Administration $16,846
1.1 Monthly Invoicing & Progress Reporting
14
$3,556'
1.2 Coordination & Meetings
. 42
$4,408-
1.3 Project Schedule
16
$3,882:
Task 2 - Data Collection $M75
2.1 Record Data Collection & Review
54 -.
-
2.2 Aerial Surve Base Ma in
6
2.3 Ri ht of Wa Base Ma in
6
2.4 Utilit Research and Base Ma in
12.
'
Task 3 - Conceptual Design $91,518
3.1.1 General Plans & Foundation Plans
Q64
$53,868
3.1.2 Site Plans / Street Improvement Plans
10
- $2,528'.
3.1.3 Stage Construction / Traffic Handling Plans
10
',� $2;528:
3.2 Preliminary Cost Estimates
60
$12�31'0
3.3 Renderings
106
Task 4 - Feasibility Study Report $19,912
Feasibility Study Report Preparation
84
;; $191912'
Labor Subtotal
$146,032
Subconsultants / Other Direct Costs (ODCs)
ODC: Mileage
$300
ODC: Reproduction
$500
Subconsultant: ERSC
$66,295
Subconsultant/ODC Subtotal + 51'o Marku
170,451
Total Fee
$216,482
16
6\cmo\Agreements\Biggs Cardosa Professional Services Agrecmentbm.09.182026.FY2627-49.doc
1. EXHIBIT "D"
WORKERS' COMPENSATION INSURANCE CERTIFICATION
Every employer, except the State, shall secure the payment of compensation in one or more of
the following ways:
(a) By being insured against liability to pay compensation by one or more insurers
duly authorized to write compensation insurance in this State.
(b) By securing from the Director of Industrial Relations, a certificate of consent to
self -insure, either as an individual employer, or as one employer in a group of
employers, which may be given upon furnishing proof satisfactory to the Director
of Industrial Relations of ability to self -insure and to pay any compensation that
may become due to his or her employees.
CHECK ONE
✓ I am aware of the provisions of Section 3700 of the Labor Code which requires every
employer to be insured against liability for Workers' Compensation or to undertake self-
insurance in accordance with the provisions of that Code, and I will comply with such provisions
before commencing the performance of the work and activities required or permitted under this
Agreement. (Labor Code § 1861).
I affirm that at all times, in performing the work and activities required or permitted under
this Agreement, I shall not employ any person in any manner such that I become subject to the
workers' compensation laws of California. However, at any time, if I employ any person such
that I become subject to the workers' compensation laws of California, immediately I shall
provide the City with a certificate of consent to self -insure, or a certification of workers'
compensation insurance.
I certify under penalty of perjury under the laws of the State of California that the information
and representations made in this certificate are true and correct.
BIGGS CARDOSA ASSOCIATES, INC.
By: �-11 Date: k 0/ Z 6
Eric Pheifer, PrincipaWice President
17
L\cmolAgreements\Biggs Cardosa Professional services Agreement.bm.09. i 9.2026.FY2627-49.doc