Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contracts & Agreements_199-2026
STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION FIRE CENTER - PROJECT REQUEST AND RECORD )" FC-32A (NEW 05125) MOU # CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION z 0 NAME w David Haas ADDRESS W 3800 N. Sierra Way CITY, STATE J San Bernardino CA Q U PHONE FAX 909-881-6955 SPONSORING AGENCY NAME City of Redlands ADDRESS 35 Cajon Street, Suite 4 CITY, STATE >. Redlands, CA 0 w PHONE Q 909-798-7601 FAX z p PAGER Cl) z a COMMENTS: N Page 1 of 4 PROJECT NAME LUJ Redlands Fuel Reduction LL O DATE W 517126 v CO FC-79 CODING CAL FIRE -CHECKLIST TIAL INSPECTION MN OJECT NUMBER P-2 JOB HAZARD ANALYSIS Z P-3 CODE OF SAFE PRACTICES 4 N P-4 JOB SAFETY SURVEY P-6 EMPLOYEE TRAINING LL ✓ Q COMPLETED v jQA/NEPA -31A ATTACHED AND SIGNED SLASH & PILE BURNING OCEDURES STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION PROJECT REQUEST AND RECORD FC-32A (REV. 05/25) PROPERTY OWNER Page 2 of 4 PRIVATE PROPERTY? NON PROFIT ORGANIZATION FORM CAL FIRE-719 Q YES ® NO ® YES 0 NO YES © NO PROPERTY OWNER City of Redlands ADDRESS CITY/STATE/ZIP PHONE DESCRIPTION OF PROJECT (Type of work to be performed, attached additional sheets if necessary) Manual fuel reduction activities including removal of brush, grasses, and invasive/non-native species on city -owned properties in areas identified in the City of Redlands Community Wildfire Protection Plan and Local Hazard Mitigation Plan. Private property owners are permitted to request conservation, fuels management, and hazard reduction projects directly through the CAL FIRE Vegetation Management Plan Coordinator. Right of entry and permission for any work on private parcels shall be actioned directly with property owner and CAL FIRE Vegetation Management Plan Coordinator through respective CAL FIRE Cooperative Agreement/License (Form 719), with any associated costs paid by the property owner directly. Treated vegetation will be chipped on site or placed in property owner provided dumpsters for hauling and processing. PERIOD WORK CAN BE PERFORMED ESTIMATED CREW DAYS 05/2026 Ongoing REQUESTED START DATE REQUESTED FINISH DATE 05/11 /2026 12/31 /2026 DNS ATTACHED YES l NNO PROJECT NAME SPONSOR'S PRIORITY Redlands Fuel Reduction High PROJECT LOCATION Multiple properties throughout the City if Redlands. GPS COORDINATES STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION PROJECT REQUEST" AND RECORD FC-32A (REV. 05125) Page 3 of 4 PROJECT BENEFIT ASSESSMENT (Estimate the benefits of the project including such items as; fire defense, public safety, watershed, recreation, wildlife habitat, property, vegetation, soil, water, air surface configuration, wildlife, people, economic benefits that include; reduced maintenance costs, reduced suppression costs, reduced damage, elimination of hazards, etc. attach additional sheets as necessary). Project will reduce fire hazard adjacent to communities and critical city infrastructure. PROJECT SLASH & PILE BURNING PROCEDURES O YES (�) NO Predicted Fire Weather Watches or Warnings O YES (F) NO Hazard Reduction Pile Burning Checklist (8100) ® YES O NO Sponsor has a valid burn permit on site. ® YES NO All slash & piles will be consumed or extinguished prior to crew leaving project site. �® YES O NO Sponsor will provide suppression control capabilities and supervision of all slash & pile burning that continues beyond crew work day. 0 YES (F) NO Notification to agency with fire suppression responsibility for the project burn site. STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION PROJECT REQUEST AND RECORD )" FC-32A (REV. 05/25) Page 4 of 4 PROJECT SPONSOR ESTIMATED RESPONSIBILITIES DESCRIPTION DURATION OF NEED J MATERIALS AND SUPPLIES Hand tools, saw gas/bar oil, files, weed whip z string 6 months O W SPECIAL TOOLS Roll -off durnpsters; need deteremined & 6 months U) resource provided by City VEHICLE OPERATIONS ECT/CCC transport vehicles 6 months LL Q TECHNICAL SUPERVISION CCC Crew Captains and Engineers 6 months U AND LABOR OTHER (DESCRIBE) All resources provided by CAL FIRE, unless identified otherwise OPERATIONAL COST RECOVERY FROM SPONSOR w w >` � J _z ULO Total $394.32Iday (plus current v ENY administrative fee) NIA $ NIA By signing below, I CERTIFY that I fully reviewed and agreed to the contents of the Project Request and Record. Approved For Final Planning and Scheduling CAL FIRE CHIEF DATE J OFFICER z O W � COOPERATING DATE � AGENCY U. V UNIT CHIEF DATE Sponsor NAME (PRINT) Mario Sa cedo SIGNATURE DATE 10/20/26 TITLE Mayor, City of Redlands