Loading...
HomeMy WebLinkAboutContracts & Agreements_200-2026STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION FIRE CENTER - PROJECT REQUEST AND RECORD )" FC-32A (NEW 05/25) MOU # CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION ZO NAME W David Haas ADDRESS LI 3800 N. Sierra Way w CITY, STATE u- J San Bernardino CA Q v PHONE FAX 909-881-6955 SPONSORING AGENCY NAME City of Redlands ADDRESS 35 Cajon Street, Suite 4 CITY, STATE >. Redlands, CA U w PHONE Q 909-798-7601 C7 FAX z p PAGER z COMMENTS: IL N Page 1 of 4 PROJECT NAME LU >' Redlands Fuel Reduction LL ZO DATE w 517/26 v FC-79 CODING CAL FIRE -CHECKLIST TIAL INSPECTION hN OJECT NUMBER P-2 JOB HAZARD ANALYSIS z P-3 CODE OF SAFE PRACTICES o (n P-4 JOB SAFETY SURVEY n mv LU EMPLOYEE TRAINING MP-6 Q QA/NEPA COMPLETED F -31A ATTACHED AND SIGNED SLASH & PILE BURNING OCEDURES STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION PROJECT REQUEST AND RECORD )" FC-32A (REV. 05125) PROPERTY OWNER Page 2 of 4 PRIVATE PROPERTY? NON PROFIT ORGANIZATION FORM CAL FIRE-719 G) YES 0 NO O YES NO YES ONO PROPERTY OWNER City of Redlands ADDRESS 35 Cajon Street Suite 4 CITY/STATE/ZIP PHONE Redlands CA, 92373 909-798-7601 DESCRIPTION OF PROJECT (Type of work to be performed, attached additional sheets if necessary) Manual fuel reduction activities including removal of brush, grasses, and invasive/non-native species on city -owned properties in areas identified in the City of Redlands Community Wildfire Protection Plan and Local Hazard Mitigation Plan. Private property owners are permitted to request conservation, fuels management, and hazard reduction projects directly through the CAL FIRE Vegetation Management Plan Coordinator. Right of entry and permission for any work on private parcels shall be actioned directly with property owner and CAL FIRE Vegetation Management Plan Coordinator through respective CAL FIRE Cooperative Agreement/License (Form 719), with any associated costs paid by the property owner directly. Treated vegetation will be chipped on site or placed in property owner provided dumpsters for hauling and processing. PERIOD WORK CAN BE PERFORMED ESTIMATED CREW DAYS 01/2027 Ongoing REQUESTED START DATE REQUESTED FINISH DATE 01 /01 /2027 12/31 /2027 kNS ATTACHED YES On NO PROJECT NAME SPONSOR'S PRIORITY Redlands Fuel Reduction High PROJECT LOCATION Multiple properties throughout the City if Redlands. GPS COORDINATES I STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION PROJECT REQUEST AND RECORD �) FC-32A (REV. 05f25) Page 3 of 4 PROJECT BENEFIT ASSESSMENT (Estimate the benefits of the project including such items as; fire defense, public safety, watershed, recreation, wildlife habitat, property, vegetation, soil, water, air surface configuration, wildlife, people, economic benefits that include; reduced maintenance costs, reduced suppression costs, reduced damage, elimination of hazards, etc. attach additional sheets as necessary). Project will reduce fire hazard adjacent to communities and critical city infrastructure. PROJECT SLASH & PILE BURNING PROCEDURES OYES NO Predicted Fire Weather Watches or Warnings Q YES O NO Hazard Reduction Pile Burning Checklist (8100) ® YES (F) NO Sponsor has a valid burn permit on site. OYES NO All slash & piles will be consumed or extinguished prior to crew leaving project site. ® YES NO Sponsor will provide suppression control capabilities and supervision of all slash & pile burning that continues beyond crew work day. 0 YES NO Notification to agency with fire suppression responsibility for the project burn site. STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF FORESTRY AND FIRE PROTECTION PROJECT REQUEST AND RECORD )" FC-32A (REV. 05125) Page 4 of 4 PROJECT SPONSOR ESTIMATED RESPONSIBILITIES DESCRIPTION DURATION OF NEED J MATERIALS AND SUPPLIES Hand tools, saw gas/bar oil, files, weed whip z string 6 months O w SPECIAL TOOLS Roll -off dumpsters; need deteremined & U) resource provided by City 6 months M w VEHICLE OPERATIONS ECT/CCC transport vehicles 6 months Q TECHNICAL SUPERVISION CCC Crew Captains and Engineers 6 months V AND LABOR OTHER (DESCRIBE) All resources provided by CAL FIRE, unless identified otherwise OPERATIONAL COST RECOVERY FROM SPONSOR w LU � J — z U. O -a Total $394.321day (plus current v ENY administrative fee) NIA $ NIA By signing below, I CERTIFY that I fully reviewed and agreed to the contents of the Project Request and Record. Approved For Final Planning and Scheduling CAL FIRE CHIEF DATE OFFICER z O w m COOPERATING DATE UJ AGENCY J v UNIT CHIEF DATE Sponsor NAME (PRINT) Mario Saucedo SIGNATURE DATE 10/20/26 TITLE Mayor, City of Redlands