FIRE CENTER - PROJECT REQUEST AND RECORD
)" FC-32A (NEW 05/25)
MOU #
CALIFORNIA DEPARTMENT OF
FORESTRY AND FIRE PROTECTION
ZO
NAME
W
David Haas
ADDRESS
LI
3800 N. Sierra Way
w
CITY, STATE
u-
J
San Bernardino CA
Q
v
PHONE
FAX
909-881-6955
SPONSORING AGENCY
NAME
City of Redlands
ADDRESS
35 Cajon Street, Suite 4
CITY, STATE
>.
Redlands, CA
U
w
PHONE
Q
909-798-7601
C7
FAX
z
p
PAGER
z
COMMENTS:
IL
N
Page 1 of 4
PROJECT NAME
LU >'
Redlands Fuel Reduction
LL ZO
DATE
w
517/26
v
FC-79 CODING
CAL FIRE -CHECKLIST
TIAL INSPECTION
hN
OJECT NUMBER
P-2 JOB HAZARD ANALYSIS
z
P-3 CODE OF SAFE PRACTICES
o
(n
P-4 JOB SAFETY SURVEY
n
mv
LU
EMPLOYEE TRAINING
MP-6
Q
QA/NEPA COMPLETED
F
-31A ATTACHED AND SIGNED
SLASH & PILE BURNING
OCEDURES
STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY
DEPARTMENT OF FORESTRY AND FIRE PROTECTION
PROJECT REQUEST AND RECORD
)" FC-32A (REV. 05125)
PROPERTY OWNER
Page 2 of 4
PRIVATE PROPERTY? NON PROFIT ORGANIZATION FORM CAL FIRE-719
G) YES 0 NO O YES NO YES ONO
PROPERTY OWNER
City of Redlands
ADDRESS
35 Cajon Street Suite 4
CITY/STATE/ZIP
PHONE
Redlands CA, 92373
909-798-7601
DESCRIPTION OF PROJECT (Type of work to be performed, attached additional sheets if
necessary)
Manual fuel reduction activities including removal of brush, grasses, and invasive/non-native species
on city -owned properties in areas identified in the City of Redlands Community Wildfire Protection
Plan and Local Hazard Mitigation Plan. Private property owners are permitted to request conservation,
fuels management, and hazard reduction projects directly through the CAL FIRE Vegetation
Management Plan Coordinator. Right of entry and permission for any work on private parcels shall be
actioned directly with property owner and CAL FIRE Vegetation Management Plan Coordinator
through respective CAL FIRE Cooperative Agreement/License (Form 719), with any associated costs
paid by the property owner directly. Treated vegetation will be chipped on site or placed in property
owner provided dumpsters for hauling and processing.
PERIOD WORK CAN BE PERFORMED ESTIMATED CREW DAYS
01/2027 Ongoing
REQUESTED START DATE REQUESTED FINISH DATE
01 /01 /2027 12/31 /2027
kNS ATTACHED
YES On NO
PROJECT NAME SPONSOR'S PRIORITY
Redlands Fuel Reduction High
PROJECT LOCATION
Multiple properties throughout the City if Redlands.
GPS COORDINATES
I STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY
DEPARTMENT OF FORESTRY AND FIRE PROTECTION
PROJECT REQUEST AND RECORD
�) FC-32A (REV. 05f25)
Page 3 of 4
PROJECT BENEFIT ASSESSMENT (Estimate the benefits of the project including such items
as; fire defense, public safety, watershed, recreation, wildlife habitat, property, vegetation,
soil, water, air surface configuration, wildlife, people, economic benefits that include; reduced
maintenance costs, reduced suppression costs, reduced damage, elimination of hazards, etc.
attach additional sheets as necessary).
Project will reduce fire hazard adjacent to communities and critical city infrastructure.
PROJECT SLASH & PILE BURNING PROCEDURES
OYES NO Predicted Fire Weather Watches or Warnings
Q YES O NO Hazard Reduction Pile Burning Checklist (8100)
® YES (F) NO Sponsor has a valid burn permit on site.
OYES NO All slash & piles will be consumed or extinguished prior to crew leaving
project site.
® YES NO Sponsor will provide suppression control capabilities and supervision of
all slash & pile burning that continues beyond crew work day.
0 YES NO Notification to agency with fire suppression responsibility for the project
burn site.
STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY
DEPARTMENT OF FORESTRY AND FIRE PROTECTION
PROJECT REQUEST AND RECORD
)" FC-32A (REV. 05125)
Page 4 of 4
PROJECT SPONSOR
ESTIMATED
RESPONSIBILITIES
DESCRIPTION
DURATION OF
NEED
J
MATERIALS AND SUPPLIES
Hand tools, saw gas/bar oil, files, weed whip
z
string
6 months
O
w
SPECIAL TOOLS
Roll -off dumpsters; need deteremined &
U)
resource provided by City
6 months
M
w
VEHICLE OPERATIONS
ECT/CCC transport vehicles
6 months
Q
TECHNICAL SUPERVISION
CCC Crew Captains and Engineers
6 months
V
AND LABOR
OTHER (DESCRIBE)
All resources provided by CAL FIRE, unless
identified otherwise
OPERATIONAL COST RECOVERY FROM SPONSOR
w
LU
� J
— z
U. O
-a
Total $394.321day (plus current
v
ENY administrative fee)
NIA
$ NIA
By signing below, I CERTIFY that I fully reviewed and agreed to the contents of the Project Request
and Record.
Approved For Final Planning and
Scheduling
CAL FIRE CHIEF
DATE
OFFICER
z
O
w
m
COOPERATING
DATE
UJ
AGENCY
J
v
UNIT CHIEF
DATE
Sponsor
NAME (PRINT)
Mario Saucedo
SIGNATURE
DATE
10/20/26
TITLE
Mayor, City of Redlands