Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Laboratories Accelerated Tech.pdf
CITY OF REDLANDS ACCELERATED TECHNOLOGY LABORATORIES, INC. By:ODuJ-Q-. By: Paul W. Foster, Mayor Thomas A. McLean, Accounts Manager Attest: Sam Irwi , ity elerk - 6 - 1:1ca1djmlAgreementslLlMS Implementation Agreement with ATL 2.16.16.doex EXHIBIT "B" —Project Schedule (tentative) ID ask Name Duration Start 1 Sample:Master@ Pro LIMSPreliminarylmplemeaMionProjectforCoy o(Redlands 16 days Wed 4113i16 2 Pre-Installation Phase Activities 0.38 days Wed 411316 3 Project Introductory Activities 0.38 days Wed 4113116 4 Confirm Receipt of PO back toChenl 1 hr Wed 4nwiis 5 Review ATL Proposal Response vs.Client PO requirements 1 hr Wed 4113116 6 Assign ATL Project Team — 1 hr Wed 411316 7 Preparation for on-site visit 0.25 days Wed 4113116 8 Assemble required documents,copies of agenda and project dashboard 2 his Wed 4113116 9 Week 1:Drinking Water Matrix 5 days Mon 4118116 10 LIMS Kick Off Meeting(orrsite) 0.13 days Mon 4118116 11 Hold Kick-Of Meeting(ATL+Grent actively) 1 hr Mon 4118!16 12 Verify hardware,software and network Ion-sitel 0.13 days Mon 411&16 13 Verify hardware,so(ruare and network(ATL+Client IT involvement) 1 hr Mon 411ISM6 14 Update Sample Mastert Pro on Laboratory Server(onsite) 0.13 days Mon 4118116 15 Install Sample Masten Pro or,Laboratory Server(ATL+Client IT invoNemerd) 1 hr Mon 4118176 16 Setup,Configure,and Verifythe Test Setup for the Drinking Water Matrix(onsite) 4.88 days Mon 4118116 17 Gather ust of Tests,Methods,Parameters,Analytical Limits,and Qi Requnemerds(Giem Attiviry) 1 day Won 4118116 18 ® Coniapure Sampo Masten Tes11A>`L aoUv4ji with Client assrsWffli --- - 2 days Mon 4118116 19 E3 Test and Verify Configuration by Dual Login(ATL At vity) 2 days Wed 41201116 20 Tran End Users on Drinking Water Matrix;Cbenl+ATLAtit*) a hrs Fn 41221116 21 0 Ho Wrap-up Meeting(ATL+Client Aunty) 1 day Fn 4122116 22 Week 2:Waste Water Matrix 5 days Mon SM16 23 Setup,Configure,and Verify the Test Setup for the Waste Water Matrix(on-site) 5 days Mon SM16 24 Gather hst of Tests,Meltwds,Parameters,Analytical Limits,and QA10C Requnements gClienl Activity) 1 day Mon 6121116 25 Configure Sample Master➢Test(ATL activity with trent assistance) 2 days Mon RA6 26 Test and Venfy Configuration by Dual Login(ATL Act"with Client Assistance) — —— — 2 rays Wed 5141116 27 Tran End Users on Dunking Water Matrix(Client+ATLl4titiyly} 8 hrs Fn 516116 28 ® Hold Wrap-up Meeling(ATL*Dent Amity) � 1 day Fn 516116 29 Week 3:Sludge Matrix 5 days Mon 511616 30 Setup.Configure,and Verify,the Test Setup for the Sludge Matrix(onside) 5 days Mon 5116116 31 Gather ust of Tests,Methods,Parameters,Analytical Limits,and QA+QC Requnements(Client Acfivity) 1 day Mon 6116116 32 Configure Sample Maslen Test(ATL atfivfty wth Client assistance) 2 days Mon 5111116 33 Test and 1"euhy,Configuration by Dual Login(ATL Activityµnth Client Assistance) 2 days Wed 5118116 Task Inactive Milestone Finish-WI Split „ , „ , , Inactive Summary External Tasks 0 Milestone Manual Task External Milestone Project Template Imp!Plan Date.-,Sat 1119113 Summary Duratw-0nty Progress Project Summary Manual Summary Rollup Deadline b External Tasks Manual Summary External M,lestone 0 Start-only I:Icaldjm\Agreements\LIMS Implementation Agreement with ATL 2.16.16.docx