Loading...
HomeMy WebLinkAboutLaboratories Accelerated Tech.pdf CITY OF REDLANDS ACCELERATED TECHNOLOGY LABORATORIES, INC. By:ODuJ-Q-. By: Paul W. Foster, Mayor Thomas A. McLean, Accounts Manager Attest: Sam Irwi , ity elerk - 6 - 1:1ca1djmlAgreementslLlMS Implementation Agreement with ATL 2.16.16.doex EXHIBIT "B" —Project Schedule (tentative) ID ask Name Duration Start 1 Sample:Master@ Pro LIMSPreliminarylmplemeaMionProjectforCoy o(Redlands 16 days Wed 4113i16 2 Pre-Installation Phase Activities 0.38 days Wed 411316 3 Project Introductory Activities 0.38 days Wed 4113116 4 Confirm Receipt of PO back toChenl 1 hr Wed 4nwiis 5 Review ATL Proposal Response vs.Client PO requirements 1 hr Wed 4113116 6 Assign ATL Project Team — 1 hr Wed 411316 7 Preparation for on-site visit 0.25 days Wed 4113116 8 Assemble required documents,copies of agenda and project dashboard 2 his Wed 4113116 9 Week 1:Drinking Water Matrix 5 days Mon 4118116 10 LIMS Kick Off Meeting(orrsite) 0.13 days Mon 4118116 11 Hold Kick-Of Meeting(ATL+Grent actively) 1 hr Mon 4118!16 12 Verify hardware,software and network Ion-sitel 0.13 days Mon 411&16 13 Verify hardware,so(ruare and network(ATL+Client IT involvement) 1 hr Mon 411ISM6 14 Update Sample Mastert Pro on Laboratory Server(onsite) 0.13 days Mon 4118116 15 Install Sample Masten Pro or,Laboratory Server(ATL+Client IT invoNemerd) 1 hr Mon 4118176 16 Setup,Configure,and Verifythe Test Setup for the Drinking Water Matrix(onsite) 4.88 days Mon 4118116 17 Gather ust of Tests,Methods,Parameters,Analytical Limits,and Qi Requnemerds(Giem Attiviry) 1 day Won 4118116 18 ® Coniapure Sampo Masten Tes11A>`L aoUv4ji with Client assrsWffli --- - 2 days Mon 4118116 19 E3 Test and Verify Configuration by Dual Login(ATL At vity) 2 days Wed 41201116 20 Tran End Users on Drinking Water Matrix;Cbenl+ATLAtit*) a hrs Fn 41221116 21 0 Ho Wrap-up Meeting(ATL+Client Aunty) 1 day Fn 4122116 22 Week 2:Waste Water Matrix 5 days Mon SM16 23 Setup,Configure,and Verify the Test Setup for the Waste Water Matrix(on-site) 5 days Mon SM16 24 Gather hst of Tests,Meltwds,Parameters,Analytical Limits,and QA10C Requnements gClienl Activity) 1 day Mon 6121116 25 Configure Sample Master➢Test(ATL activity with trent assistance) 2 days Mon RA6 26 Test and Venfy Configuration by Dual Login(ATL Act"with Client Assistance) — —— — 2 rays Wed 5141116 27 Tran End Users on Dunking Water Matrix(Client+ATLl4titiyly} 8 hrs Fn 516116 28 ® Hold Wrap-up Meeling(ATL*Dent Amity) � 1 day Fn 516116 29 Week 3:Sludge Matrix 5 days Mon 511616 30 Setup.Configure,and Verify,the Test Setup for the Sludge Matrix(onside) 5 days Mon 5116116 31 Gather ust of Tests,Methods,Parameters,Analytical Limits,and QA+QC Requnements(Client Acfivity) 1 day Mon 6116116 32 Configure Sample Maslen Test(ATL atfivfty wth Client assistance) 2 days Mon 5111116 33 Test and 1"euhy,Configuration by Dual Login(ATL Activityµnth Client Assistance) 2 days Wed 5118116 Task Inactive Milestone Finish-WI Split „ , „ , , Inactive Summary External Tasks 0 Milestone Manual Task External Milestone Project Template Imp!Plan Date.-,Sat 1119113 Summary Duratw-0nty Progress Project Summary Manual Summary Rollup Deadline b External Tasks Manual Summary External M,lestone 0 Start-only I:Icaldjm\Agreements\LIMS Implementation Agreement with ATL 2.16.16.docx