HomeMy WebLinkAboutContracts & Agreements_54-2016 FIRST AMENDMENT TO THE AGREEMENT FOR AIRPORT CONSULTING SERVICES
This first amendment ("First Amendment") to the agreement to provide airport consulting
services dated October 6, 2015 ("the Agreement"), by and between the City of Redlands, a
municipal corporation ("City") and Coffman Associates ("Consultant") is made and entered into
this 15th day of March, 2016. City and Consultant are sometimes individually referred to herein
as a"Party" and, together, as the "Parties."
RECITALS
WHEREAS, it is the desire of the City and Consultant to amend their existing
Agreement, specifically Sections 2.1, 4.1 and 5.1, to revise the Consultant's scope of work and
total compensation for the performance of certain Services;
NOW, THEREFORE,City and Contractor agree as follows:
AGREEMENT
Section 1. Section 2.1 of the Agreement is hereby amended to include the additional
scope of services more particularly described in Exhibit"A""Scope of Services."
Section 2. Section 4.1 of the Agreement is hereby amended to modify the
Performance of Services and shall read as follows:
"4.1 The Services shall commence on October 6, 2015. Consultant shall perform and
complete the Services in a prompt and diligent manner by May 24,2016.
Section 3. Section 5.1 of the Agreement is hereby amended to increase Consultant's
Compensation and shall read as follows:
"5.1 The total compensation for Consultant's performance of the Services shall not
exceed amount of One Hundred-four Thousand, Six Hundred Twelve Dollars
($104,612.00). City shall pay Consultant on a time and materials basis up to the not to
exceed amount, in accordance with Exhibit "C" entitled "Project Costs and Hourly
Rates." Exhibit "C" entitled "Project Costs and Hourly rates." Exhibit "C" is attached
hereto and incorporated herein by this reference.
1 ..
1:1ca\djm\Agrecmcntsk1st Amendment to Agrccment with Cof[man Associates-Airport Permit 3.15.16.doc
IN WITNESS WHEREOF, the partes have executed this First Amendment, to be
effective as of March 15, 2016.
CITY OF REDLANDS COFFMAN ASOCIATES
HY .:&j Aj E : .. _ ..
Paul W. Foister, Mayor /"ames M. Harris, President
ATTEST:
By;
Sam Irwin, C4 Clerk
2 _1f\ -2 -
I\raW
raW m\.ASrec a n1sAVsaAmendment to Agreement with Coffman n Associates-Airport P'c dt 3,05.16.doe
EXHIBIT"A"
ADDITIONAL,SCOPE OFSER VICE, FOR FIRST AMENDMENT TO THE AGREEMENT
ELEMENT - PREPARE ANALYSIS RELATED TO HELICOPTER ACTIVITY AT
REDLANDS MUNICIPAL AIRPORT
Task 1A - Evaluate the Safety of the Existing Runway System Being Able to
Accommodate Fixed-Wing Aircraft and Helicopter Activity
Description: An evaluation will be made to determine if Runway 8-26 is capable of
temporarily accommodating fixed-wing aircraft and helicopter operations simultaneously
given the high volume of helicopter training activity at the airport in a safe and efficient
manner. A review of the existing airspace structure and traffic pattern layout associated
with the airport will be made and information will be obtained from airport operators to
better understand the operating environment associated with the runway system. An
evaluation of the operational activity (aircraft types and volume) will also be analyzed.
Product: A determination as to Runway 8-26 being able to support fixed-wing aircraft and
helicopter activity in a safe and efficient manner on a temporary basis with the
understanding that a dedicated helipad will be established separate from the runway system
to accommodate future helicopter operations. A summary report will be provided in
narrative and/or graphic format summarizing the findings of Task I and will be provided in
PDF format.
Responsibilities: Coffman Associates and a Subconsultant will be responsible for this task.
The City of Redlands will provide comments on the summary report prior to finalizing the
appropriate documentation.
Task 2A—Determine a Location for a Temporary Helipad
Description: An evaluation will be made for a temporary helipad that is in a safe location as
it relates to operational activity and existing development at the airport. The appropriate
processfor designating a temporary helipad will be followed as needed and could include the
submittal of FAA Form 7480-I, Notice for Construction, Alteration and Deactivation of
Airports. Coordination with FAA and CAL`I'RANS — Division of Aeronautics
representatives will be needed to help reach a consensus on the location and temporary
approval of the helipad.
Product: An approved location for a temporary helipad. A summary report will be provided
in narrative and/or graphic format summarizing the findings of Task 2A and will be
provided in PDF format.
Responsibilities: Coffman Associates will be responsible for this task. The City of Redlands
will provide comments on the summary report prior to finalizing the appropriate
documentation.
-3 -
I.kaldjmlAgrecmcnts%1st Amendment to Agreement with Coffman Associates-Airport Permit 3.15.16.doe
Task 3A-Determine a Location for a Permanent Helipad
Description: An evaluation will be made for a permanent helipad that is in a safe location
as it relates to operational activity and future development potential at the airport. The
appropriate process for designating a permanent helipad will be followed and include the
submittal of FAA Form '1480-1, Notice of Construction, Alteration, and Deacth,ation of
Airports. Coordination with FAA and CALTRANS - Division of Aeronautics
representatives will be needed to help reach a consensus on the location and approval of the
permanent helipad. This task will also include a revised CALTRANS Airport Permit
designating the permanent helipad.
Product: An approved Iocation and proper permitting for a permanent helipad. A
summary report will be provided in narrative and/or graphic format summarizing the
findings of Task 3A and will be provided in PDF format.
Responsibilities: Coffman Associates will be responsible for this task. The City of Redlands
will provide comments on the summary report prior to finalizing the appropriate
documentation.
Task 4A — Evaluate/Determine the Appropriate Traffic Pattern Altitude for
Helicopters
Description. The existing CALTRANS Airport Permit (Corrected Airport Permit No. SSD-
032) designates the helicopter traffic pattern altitude at 800 feet AGL on the south side of the
airport. An evaluation will be made to determine if this traffic pattern altitude is
appropriate for helicopter operations based upon the airspace structure, operational activity
(aircraft types and volume), and adjacent land uses. As needed, the appropriate process for
changing the traffic pattern altitude will be followed and include the submittal of FAA Form
7480-1, Notice of Construction, Alteration, and Deactivation of Airports. As needed,
coordination with FAA representatives, CALTRANS - Division of Aeronautics
representatives and helicopter operators will occur to help reach a consensus on appropriate
traffic pattern altitude. This task could also include a revised CALTRANS Airport Permit
designating the approved helicopter traffic pattern altitude.
Prothcct: An approved helicopter traffic pattern altitude and appropriate permitting to
establish such. A summary report will be provided in narrative and/or graphic format
summarizing the findings of Task 4A and will be provided in PDF format.
Responsibilities: Coffman Associates will be responsible for this task. The City of Redlands
will provide comments on the summary report prior to finalizing the appropriate
documentation.
Task 5A - Coordination Meetings
Description: Up to three (3) coordination meetings are budgeted for this study. The meetings
-4-
1.ka1djmlAZmcments\Ist Amendment to Agmement with Corrtnan Associates-Airport Permit 3,13.16 doc
can be used for coordination with, or presentations to, the City of Redlands, airport users,
FAA,CALTRANS — Division of Aeronautics,or other agencies as necessary.
Responsibilities: Coffman Associates and the City of Redlands will coordinate jointly on
setting up the meetings.
Product: Up to three(3)coordination meetings.
COST ESTIMATE
Task 1 A- $ 5,476
Task 2A- $ 3,706
Task 3A- $ 3,706
Task 4A- $ 1,838
Task 5A- $14,896
Total Cost Estimate$29,622.00
PROJECT SCHEDULE
The following is a breakdown of the estimated time needed to complete Tasks 3 A through 4A as
outlined above,exclusive of governmental reviews and approvals.
Task 1 A - Two (2) weeks
Task 2A - Two (2) weeks
Task 3A - Four(4) weeks
Task 4A -Two (2) weeks
-5-
I:kaldjmlAgmcmentsllst Amendment to Agreement with Coffman Associates-Airport Permit 3.15.16.doc
%
\k
� S §
�
§ 5
a
) jv w w v 0 _
! _ ■
} �k
§ !
� }k
#
J� � a
_
�
: f
) i
. § E
\ \
2 2
\ { { )
f rz k
) ( § cl .
\ §
ka • \ k ! \ k &
a �
�) ■ j . _ . , _ K